MAY 2018 AST1 Flashcards
Fire starter goes in what pocket of LPU-26?
Wearer’s left pocket
Desalinization pack goes in what pocket of LPU-27 PEG vest?
Wearer’s right middle pocket
Scuba bottle for servicing SEAS-1 should be how many cubic feet?
- 80 or 90 cubic feet
How many portable fire extinguishers on HC-144?
There are three portable extinguishers in the aircraft: one in the flight compartment and two in the cargo compartment
Middle compartment on 65 float is initially inflated to how many PSI to check for internal leakage?
- 0.75 PSI check, 3.48 PSI 30 minute check, 3.0 PSI 3 hour leak check, can deflate to 2.25 PSI after leak check
Training seas bottle is what color?
Black and shall stencil “training use only” in white ½” stencil
Receiver for PYRO from a life raft marks the pyro what ATR code?
The issuer of the life raft pyrotechnics shall use the ATR code of “INSTL” to remove it from the Ordnance Information System (OIS). The receiver of pyrotechnics from a life raft shall use the ATR code of “UNPAC” to acknowledge receipt in their ATR.
ADS bag or bib needs to be replaced if it has a tear how long?
-Deployment bags and trail line bibs that have tears longer than 3 inches or holes larger than 1 inch
ADC assembly protects you from 32 degree water for how many hours?
The ADC assembly will afford protection from exposure to 32 °F water for a period up to 14 hours
CG22 that for urgent flight related info, but not flight safety has how many days to be complete?
-The available priority codes are:
Urgent — 7 days from receipt of the CG-22 to distribution to the units
Non-routine — 14 days from receipt of the CG-22 to distribution to the units
Routine — 90 days from receipt of the CG-22 to distribution to the units
Re-inspection of unit with major armory must be within how many days of failing pyro inspection?
- The re-inspection of units with major discrepancies shall be conducted within 90 days to verify conformance with policy
LRU-33 bottle has no more than how many pounds of CO2?
3.06 pounds of CO2, and 5.7 pounds of N2 A
Max C02 in SEAS1 breathing air PPM?
air requirements as depicted below: (1)CGA Modified Grade E (ANSI/GCA G-7.1) (2)Oxygen 20-22% (3)Carbon Dioxide (CO2) 500 PPM (4)Carbon Monoxide (CO) 10 PPM (5)Methane (CH4) 25 PPM (6)Water Vapor 67 PPM (7)Dew Point -50 °F (8)Odor - none`
Do what to the ignition coil on the pump during the post use inspection?
nspect for corrosion and obvious damage, remove and replace for post SAR inspection
The temperature calculator for inflatables uses what number?
- 0.03
Aircrew safety belts ends are folded how many times and how many layers are they?
Four thickness fold
Triton harness torso length adjusters are folded how many times
- 3
Aircraft safety belt inspection shall not exceed how many days?
A visual inspection will be accomplished at intervals not to exceed 30 days. Aircraft safety belts issued to rescue swimmers shall be visually inspected each duty day.
Type XIII breaking strength?
-7,000lbs
What color is the float inflation bottle?
Grey
How many raps through the eye splice of the manila for the trail line on the ADS?
- Wrap one end of the polypropylene line three times through either manila line eye splice.
Pre-mission servicing icon button in EAL?
- Blue
MA-1 leak check fill to what PSI?
- MA-1 walk around cylinders are painted yellow in accordance with MILSTD-101.
200 PSI, no leaks charge to 375 PSI.
CASA oxygen subsystems?
-The system has two different installations: a fixed one for the crew, and a portable one for the passengers and emergency conditions.
The portable installation is: six high-pressure oxygen bottles, two located in the fixed rack, two in the Mission System Pallet (only in the MPA configuration) and two in the rear part of the cabin