Division 2
Existing Conditions captures site assessments and investigations, demolition of structures, and the remediation of contaminated soil, buildings, and groundwater. Division 2 discusses methods to identify site features that may impact follow-up project work. Many site conditions are not immediately obvious, requiring specific pre-construction tasks to become better defined. Division 2 provides methods to mitigate any undesirable site and building attributes present, including groundwater remediation and the removal of mold and asbestos within structures.
Division 1
General Reqs
Division 13
Special construction.
Division 13 Special Construction addresses structures designed for a very specific end-use, such as a greenhouse, which require detailed construction specifications and methods tailored to that unique building function. It also includes the installation of similarly specified and particular sub-systems, such as a bank vault, within conventionally constructed buildings. Division 13 construction projects tend to require professional insight and construction expertise, making them more expensive to design and build than standard projects. Division 13 structures and systems often offer less flexibility for future space re-utilization because of the unique nature of their original design intent.
Division 3
Concrete
Division 4
Masonry
Division 5
Metals
Division 6
Woods, plastics, composites
Division 7
Thermal and moisture protection
Division 8
Openings
Division 10
Specialties.
Toilet compartments, louvers, visual display boards, wall/corner guards, awnings, lockers
Division 9
Finishes.
Plaster, gypsum, wall studs and floor, wall finishes.
Division 11
Equipment
Vaults, security equipment, library equipment, stage equipment, AV equip , vending, loading,
Division 23
HVAC
Division 22
Plumbing
What are the three sections of each division?
Part 1. General -
Part 2: Products
Part 3: Execution