M901 902 903 emplacement Flashcards

1
Q

M901 Dangers

A

Do not stand directly in front of or in back of the vehicle until wheels are chocked.

Do not stand between tandem wheels of tractor when coupling or uncoupling trailer.

Do not leave tractor unattended before chocking wheels.

Ensure all four outriggers have firm contact with the ground.
.
Do not start the generator set until the LS is connected to a suitable ground.

If one of the missile hazard lights comes on and a live missile is present with GM cable connected at location
(as indicated by a light), immediately notify the engagement control station (ECS) of the condition indicated and advise that the LS will remain in local mode. After notifying ECS, evacuate area and await further
instructions.

Visually check any missile light that is on.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Time for Emplacement

A

25 Minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

M901 Equipment

A

PAC-2 Launcher Station

M983/M984

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

M901 Time Start/Stop

A

CM1: Maneuvers the LS tractor and trailer to designated position and orients at marker stake

Places LS in Remote

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What TM covers MRCTS

A

TM 9-1440-600-10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

M901 Evaluation Considerations

A

Missile Round Cable Test Set (MRCTS) – TM 9-1440-600-10

Follow crewmembers around LS and pay close attention as crewmembers climb onto platform and around generator.

Pay attention to power-up procedures to identify the possibility of faults.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

M902 PM Drill

A

44-CW-D0200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

M902 PM Time

A

25 Min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

M902 PM Equipment

A

PAC-3 Launcher Station

M983/M984

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

M902 PM Times start/stop

A

Time starts when LS and tractor are oriented at designated position

Time stops when the launcher is placed in remote (Step #27).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

M902 Emplacement Drill

A

44-CW-D0190

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

M902 Emplacement Equipment

A

PAC-3 Launcher Station

M983/M984

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

M902 Emplacement Time

A

25 Minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

M902 Emplacement Start Stop

A

For evaluation purposes the time starts at receipt of prepare for movement from ECS.
Time stops with movement of the LS off of the stake (Step #22).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What TM Covers Stray No Voltage Test

A

TM 9-1440-1600-10

TM 9-1440-2600-10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

PM&E Drills

A

M901
44-CW-D0140
44-CW-D0130

M902
44-CW-D0200
44-CW-D0190

M903
TM 9-1440-2600-10 WP 0105
TM 9-1440-2600-10 WP 0035