Lists Flashcards

1
Q

Forms of Recon

A
Route
Zone
Area
Recon in Force
Special
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Types of Engineer Recon

A

Technical Recon

Tactics Recon

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Types of Technical Recon

A

Infrastructure Assessment and Recon
Environment Assessment
Airfield Assessment
Route Classification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Types of Tactical Recon

A

Bridge Recon
Route Recon
Obstacle Recon

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

SWEAT-MSO

A
Sewage
Water
Electricity
Academics
Trash
Medical
Safety
Other Considerations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Difference between Pier and Wharf

A

Pier is perpendicular to shore, wharf is parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How heavy is water?

A

62.4 lbs / ft^3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the 5 components of concrete?

A
Water
Cement
Aggregate
Air
Admixtures
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the 2 Types of reinforcement in concrete?

A

Temperature and Shrinkage

Structural

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the 4 Base Camp Principles?

A

Scalability
Sustainability
Standardization
Survivability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the 3 types of Base Camps?

A

Base
Base Camp
Intermediate Staging Base

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the 5 Base Camp Classifications?

A
Contingency:
Organic
Initial
Temporary
Semi-Permanent

Enduring:
Permanent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the 3 Bridging Categories?

A

Tactical
Support
Lines of Communication

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the 3 types of truss bridges?

A

Through (over + sides)
Pony (under + sides)
Deck (under)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the 3 types of arch bridges?

A

Through (above)
Deck (below)
Tied (above)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the 5 ways of classifying a bridge?

A
Hasty Method
Rapid Field Classification (GTA 05-07-013)
Track Commander’s Card (GTA 05-07-012)
Correlation Curves
Analytical Method
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What are the priorities for Gap Crossing?

A
  1. Existing Bridges
  2. Detours/Bypasses
  3. Repair/Reinforcement
  4. Tactical Bridges
  5. Line of Communication Bridges
18
Q

What are the 3 Components of a Project?

A

Time, Money, Scope

19
Q

What are the 6 steps for Scheduling?

A
  1. Estimate Milestones
  2. Define activities
  3. List tasks
  4. Determine sequence
  5. Estimate time
  6. Build, review, revise schedule
20
Q

3 Types of Airfield

A

Initial
Temporary
Semi-Permanent

21
Q

4 categories of airfield surface

A

Expedient Surfaced
Aggregate Surfaced
Must finish

22
Q

3 Types of Crushed Stone Repair

A

Debris Backfill
Choke Ballast over Debris
Choke Ballast (for when there is a high water table)

23
Q

Define airfield craters by size

A

A < 5’
B < 20’
C > 20’

24
Q

Difference between contaminated and polluted water

A

Contaminated - potential disease causing organisms

Polluted - has impurities like chemicals, mud, or sludge

25
2 Types of Water distribution systems
Loop | Dead-End
26
Army Water standards at tap
20 psi min, 120 psi max 1” pipes Pipe velocity 2-10 fps 1” globe valve
27
2 types of loads
Resistive (lights, heaters) | Inductive (anything with a motor)
28
2 outlet types
DCO (Duplex Convenience Outlets) | SPO (Special Purpose Outlets)
29
What is Real Property?
Buildings, land, or Stuff that is fixed to the building (nothing with wheels!)
30
2 Levels of Qualiry Control
Unit QC Program | Project QC Plan
31
JCMS Construction Activity Data
Hierarchy Data: NSNS Resources Support Data: Drawings Support Files TOGs
32
Hierarchy of JCMS
``` Super Components Components Facilities Construction Activities Resource/NSN ```
33
Cost Estimating Methods
Basic (UFC 3-730-1) Moderate (RSMeans, Concept Design) Deliberate
34
2 Road Classifications
Combat Roads and Trails | Improved Roads - Surfaced and Unsurfaced
35
4 Types of Unsurfaced Roads
Earthen Treated - bitumen or emulsion Stabilized - soil mixtures or soil cement Sand Clay
36
Surfaced Roads
Gravel | Processed Material
37
Layers of a typical road
``` Asphalt or Concrete Pavement Base Course Sub base Select Material Compacted Subgrade ``` *if cold, add frost filter above compacted subgrade
38
5 Protection Concepts
``` Mitigation Deterrence Prevention Active Security Passive Defense ```
39
4 Functions of GEO ENG
``` Generate Manage Analyze Disseminate (GMAD) ```
40
What is the ENG Staff officer responsible for with Geospatial?
Integrating GEO engineering throughout the ops process to facilitate decision making and enable understanding. And recommends adjustments to priorities for the geospatial engineers