License and Tech Spec Flashcards

topic 15

1
Q

UCI TRIGA Reactor license

A

for medical, research, or development; up to 5 kilograms U235 enriched in detectors, fission plates, foils, chemical compounds and solutions;

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

reactor shutdown

A

subcritical by at least $1.00 reactivity in reference core conditions (all control rods in, no core work in progress, key removed)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

channel check

A

qualitative verification of acceptable performance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

channel test

A

signal introduction to channel to verify operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

channel calibration

A

adjustment of the entire channel such that output corresponds with acceptable accuracy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

operable

A

component or system is capable of performing the intended function

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

operating

A

component or system is performing intended function

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

reactor secured

A

insufficient moderator or fissile material to attain criticality; all control rods down, key removed, no core work, no experiments moving

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

shutdown margin

A

minimum shutdown reactivity necessary to be subcritical from any permissible operating condition; >$0.55

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

monthly

A

not to exceed 6 weeks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

quarterly

A

not to exceed 4 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

semi-annual

A

not to exceed 7.5 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

annnual

A

not to exceed 15 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

biennial

A

not to exceed 2.5 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

quinquennial

A

not to exceed 6 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

fuel safety limit

A

1000 degrees C; to maintain fuel integrity and prevent fission product release

17
Q

fuel limiting safety system setting

A

425 degrees C; scram trip for fuel temperature to prevent reaching safety limit

18
Q

pulse

A

after steady state power level is less than 1 kW and total reactivity worth of FTR and ATR is less than $3.00 combined;

19
Q

damaged fuel

A

bend > 1/16 inch over element length; grother > 1/8 inch

20
Q

needed pulsing channels and scrams

A

fuel element temperature and power level; all scrams except reactor power

21
Q

experiment rules

A

unsecured or moveable experiments are <$1.00; single experiment reactivity <$3.00; sum of all experiments <$3.00