Level 3- Landlord Representation Flashcards
Please explain the unit
Upper mall, secondary pitch, 1,200 sq ft, narrow and long
What is the average Zone A of the pitch
£62
Define shell condition
Often known as a stripped back unit, unfinished flooring, bare walls, 3 phase electricity supply often provided. Sprinklers fitted as per the code
Define white box condition
A partially finished unit, plastered and painted, lighting, AC, electrical fixtures, sprinklers.
Definition of white box varies between sectors, L&Ts therefore handover is specified in detail within lease
What basis of measurement did you use?
NIA- Net Internal Area
Exclude W/C, stairs, columns, area less than 1.5m in height, service cupboards
When measuring a shop with partitioning, how would you properly measure the width?
Remove a ceiling tile, gaps in partitioning, scale from floor plans, if basement available measure width
What is the current vacancy rate within The Glades?
9%
What are business rates?
Rates set by the VOA that the tenant is responsible for, rateable value is calculated against a multiplier to give rates payable