How did you advise the client that the new AC was the best value for money compared to heating at bournmouth school?

A

The school did not require the heating as it was advised that the classrooms were too warm and boiler had recently been upgraded. I suggested that the design may not meet the clients objectives and with limited funds available may not be good value for money. Therefore the existing rads and boiler remain and savings used to install air conditioning units.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is value for money?

A

Reviewing the cost, quality and sustainability to meet the clients requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are different types of AC systems

A

Mobile unit
Ducted unit
Split air conditioning - heating and cooling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What did you advise the client when you were reviewing the shower room at day surgery unit? Was the shower room an accessible room?

A

That the existing toilet did not have sufficient space to incorporate a new shower room due to the trust wanting level access and creation to falls noted by architect. Options considered included omit shower room, relocate room and utilise surrounding space by reducing size of toilet behind in side room. This still met the clients objectives in providing the shower.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Bournemouth school - did you advise the client on the lifecycle costs of the heating and ac options?

A

I reviewed with the M&E consultant what the maintenance requirements were for retaining the existing radiators and boiler including a flush through system. And the benefits of wall mounted AC units would have on the school.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a value management process?

A

Process that aims to increase the benefit of a project relative to its cost or effort. Providing the best solutions to the client than cutting out costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is value engineering?

A

method in construction used to reduce costs and improve quality while still meeting project objectives.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What were the cost changes from the heating and boiler to the ac units?

A

Removal of existing systems and boilers and replacement omitted costs to new wall mounted units with an external condenser. The AC until quotations provided by the contractor was lower than the cost for the heating but when added to provide fencing around the unit the cost came out largely the same.