LESSON 1: NATIONAL BUILDING CODE OF THE PHILIPPINES Flashcards
“They are the ones responsible for carrying out the provision of the National Building Code in the field. They are also responsible in the annual inspections of all buildings and keep an up-to-date record of their status
A) Civil Engineer
B) The Secretary
C) Building Officials
D) Architects”
C) Building Officials
“It is a type of construction where buildings shall be of wood construction with protective fire-resistant materials and one-hour-fire-resistive throughout: Except, that permanent non-bearing partitions may use fire-retardant treated wood within the framing assembly.
A) TYPE I
B) TYPE II
C) TYPE III
D) TYPE IV”
B) TYPE II
“In chapter 2, what section states that the secretary shall formulate necessary rules and regulations and adopt design and construction standards.
a. Section 203
b. Section 210
c. Section 211
d. Section 202”
C) Section 211
“3.00 cubic meters with 1.00 square meter of floor area per person
a. School rooms
b. Habitable rooms
c. Kitchen
d. Workshops, factories and offices
“
A) School Rooms
“Which of the following is the primary objective of the National Plumbing Code of the Philippines?
A) To ensure the efficient operation of water systems in commercial buildings
B) To promote proper hygiene, sanitation, and public health in all plumbing installations
C) To regulate water pressure in residential buildings
D) To reduce the cost of plumbing materials and installation”
B) To promote proper hygiene, sanitation, and public health in all plumbing installations
“The National Plumbing Code of the Philippines mandates the use of cleanouts in plumbing systems. The purpose of a cleanout is to:
A) Provide an access point for inspecting or clearing obstructions in pipes
B) Control water pressure in the system
C) Connect the drainage system to stormwater
D) Support the pipe structure”
A) Provide an access point for inspecting or clearing obstructions in pipes
“Which of the following documents must be submitted to the local building official for approval before starting construction under the NBCP?
A) Business permit
B) Architectural and structural plans
C) Environmental clearance certificate
D) Fire safety inspection certificate”
B) Architectural and structural plans
“Which government agency is primarily responsible for enforcing the provisions of the National Building Code?
A) Department of Health (DOH)
B) Department of Public Works and Highways (DPWH)
C) National Economic and Development Authority (NEDA)
D) National Building Code Authority (NBCA)”
B) Department of Public Works and Highways (DPWH)
“What is the minimum air space requirements of school rooms?
A) 12.00 cubic meters of air space
per person
B) 14.00 cubic meters of air space per person.
C) 3.00 cubic meters with 1.00 square meter of floor
area per person
D) 11.00 cubic meters of air space per person.”
“C) 3.00 cubic meters with 1.00 square meter of floor
area per person”
“What is the minimum sizes of kitchens rooms and their least horizontal dimensions?
A) 1.20 square meters with a least dimension of
0.90 meter.
B) 6.00 square meters with a least
dimension of 2.00 meters.
C) 3.0 square meters with a least dimension of 1.50
meters
D) 5.0 square meters with a least dimension of 2.50
meters”
“C) 3.0 square meters with a least dimension of 1.50
meters”
“The NBCP states that firewalls are required between units in row houses. What is the minimum height of a firewall above the roofline?
A) 0.20 meters
B) 0.30 meters
C) 0.50 meters
D) 1.00 meter”
C) 0.50 meters
“What is the minimum live load requirement per square meter for corridors and balconies, according to the NBCP?
A) 100 kg
B) 200 kg
C) 250 kg
D) 300 kg”
D) 300 kg
“What is the main purpose of the National Building Code?
A) To regulate architectural designs
B) To ensure safety, orderliness, and well-being in building construction
C) To provide landscape guidelines
D) To manage commercial property transactions”
B) To ensure safety, orderliness, and well-being in building construction
“Under the National Building Code, which document must be submitted before any major building renovation can begin?
A) Environmental Impact Assessment
B) Floor Plan
C) Building permit
D) Engineering safety certificate”
C) Building permit
“They are the ones that formulate necessary rules and regulations and adopt design and construction standards and criteria for buildings
and other structures.
a.) President
b.) Vice President
c.) Secretary
d.) Treasurer
“
C) Secretary
“In what number of days shall a Certificate of Occupancy shall be issued by Building Officials after final inspection and
submittal of a Certificate of Completion.
a.) 20
b.) 30
c.) 40
d.) 50
“
B) 30
“Known as Civil Engineering Law is by the board of Civil Engineering pursuant to Republic Act No. what? a.) 644 b). 444 c.) 544
d.) 744”
C) 544
“How many sections are in the Chapter 12 of National Building Code? a.) 12 b). 13 c.) 14
d.) 15”
D) 15
“In Chapter 12: General Design and Construction Requirements, what section specifies guidelines in Fire-Extinguishing Systems?
A.) Section 1209
B.) Section 1210
C.) Section 1211
D.) Section 1212”
D.) Section 1212