- Which of the following strategies CANNOT be included as alternative transportation strategies?*
- Choose 2*
- Motorbike
- Single occupant car
A project is analyzing alternative transportation strategies. Under what conditions can a ride-share be counted as alternative transportation?
If the ride-share is used by both regular occupants & visitors; NON - US Projects only
Alternative transportation as it applies to LT Credit 1 includes all but which of the following:
Expanded workweeks
A Project team has decided to conduct an on-location, in-person transportation survey. Which of the following will help the project team yield better response rate and results?
Surveyors should be present at all project building entrance points
When conducting a survey as part of the calculations for LT Credit 1 Alternative transportation, which dates/times are the best?
A survey conducted each day starting on Monday and ending on Friday
A project building has a total 200 regular building occupants & visitors. What minimum response rate is needed for a valid transportation survey?
10 total regular building occupants & visitors
The office project has achieved 40% alternative transportation rate. How many points can the project attain under LT Credit-Alternative Transportation?
9
In an existing city transportation office, number of visitors during the typical peak hours outnumbered the regular building occupants. The city office is planning to conduct a transportation survey. Should the visitor be surveyed under LT Credit- Alternative Transportation?
Yes, visitor should be included
A school has attained 85% reduction compared to conventional commuting baseline. How many points can it earn under LT credit 1 - Alternative Transportation?
16
What is extrapolation factor if the survey rate is 50% under LT Credit 1- Alternative Transportation?
0.8
A vehicle can be counted as a green vehicle under what conditions?
The vehicle achieves a minimum green score of 45 on the ACEEE annual vehicle rating guide
A project team analyzed the survey results for regular occupants to calculate the alternative transportation rate and found only a 25% survey response rate. What should the project team do next?
All non-responders are assumed to commute in single-occupancy vehicles
An occupant commute survey with an 80% response rate revealed 50% of respondents take alternative transportation to work. What is true about the non-responders?
Half of the non-responders are assumed to take alternative transportation to work
What is the maximum number of points that the project earn under LT Credit- Alternative credit including the exemplary performance credit?
16 points
The owner of an office building is considering the best way to conduct a transportation survey to achieve Location and Transportation credit Alternative Transportation. The owner understands that several of the tenants allow employees to telework, and therefore, has chosen to distributean electronic survey. Tenant “A” occupies 57% of the building, Tenant “B” occupies 32% of the building, Tenant “C” occupies 6% of the building, and the remainder is occupied by Tenant “D”. The building includes 972 regular occupants. In order to correctly distribute surveys to randomized sample of each tenant, the owner must allocate how many of the surveys to each tenant?
Tenant “A”-163 surveys, Tenant “B”-92 surveys, Tenant “C”-17 surveys, Tenant “D”-14 surveys
A Core and Shell Project in Santa Monica, California is pursuing Regional Priority credits and searching the USGBC database to explore the 6 available credits to choose 4 credits. Which RP group should the project download?
RP credits applicable for Core and Shell Project types
A hospitality project team is considering LEED certification under LEED O+M. Which of the following credits must the project implement in order to earn LEED Platinum level certification?
Choose 3
- SS Prerequisite Site Management Policy
- EA Prerequisite Building-Level Energy Metering
- EQ Prerequisite Green Cleaning Policy
A hospitality project team member finds an area not addressed in the LEED reference guide regarding WE Credit Outdoor Water Use Reduction. The team implements the credit and submits a suggested approach for the credit during the preliminary LEED review process. Which of the following is true regarding this project team’s approach?
The project team will receive a determination in the comments at the discretion of the USGBC or GBCI reviewer assigned to the project
A LEED Existing Building project receives notification from GBCI when the preliminary review is complete. The review consists of clarifications and technical advice on a few design credits. Which of the following should the project team or LEED Administrator do?
The project team should respond to the technical advice and clarification through LEED online and re-submit credits if required
A new construction project was registered in December of 2013, In May, 2014 USGBC publish Addenda for a credit the project pursuing. What statements are true regarding this project?
Choose 2
- The project team can choose to follow any addenda published after May, 2014
- The project team must follow any addenda published prior to December, 2013
A project in Oklahoma is analyzing various credits for exemplary performance. Which of the following credits would qualify for the project to earn an exemplary performance point under IN Credit Innovation option 3 Additional Strategies? Choose 2
- LT Credit Alternative Transportation
- EA Credit Renewable Energy and carbon offsets
A project in Raleigh, North Carolina was originally registered under BD+C: New Construction. Later during the pre-design stage, the owner finds 3 tenants to occupy the building space upon completion and hence wants to change the rating system to Core & Shell. Which action should be taken by the project team?
Contact LEED technical customer service
A project team after careful research identified 2 innovative ideas for successful innovation credits that were implemented in past LEED projects and awarded innovative credits for. Which of the following actions should the project team take for successful implementation of the innovative ideas?
Seek formal pre-approval from USGBC by submitting CIR
A project team is evaluating different project locations and sites for a potential LEED ND project. Which of the following must be true in order for the site to qualify for LEED certification under the LEED ND rating system?
Choose 2
- The site should have at least 2 habitable buildings
- The site should be NO LARGER than 1500 acres
A project team is exploring full range of innovative opportunities in their project building by referring to the online Innovation database for examples of successful innovation credits. Which of the following actions should the project team take if the project team seeks formal pre-approval of an innovation strategy?
Submit a CIR
A project team member is very active in his community. He is working with the owner to devise a program that fosters the growth of green buildings by showcasing the project building as an example. Which of the following instructional initiatives would satisfy the requirements of an education program for innovation for IN Credit Innovation?
choose 2
- A comprehensive signage program throughout the project to educate occupants and visitors about the benefits of sustainable buildings
- Weekly guided tours on sustainable and building green using the project as an example
Following variables affect LEED Registration cost?
Choose 2
- Time when the project team decides to register
- Project’s rating system
How does USGBC encourage project teams to focus on their local environmental priorities in the project’s region?
Regional priority credits
How is the LEED boundary determined for multi-building development especially when each building in the property will be a separate LEED project
The project team should determine the LEED boundary for each LEED project
How many points can a project earn for RP credits?
4
How many points can a project earn under innovation?
4
The question asked for “innovation” under innovation credit NOT innovation credit in general
How many RP Credits are identified for every location?
6
The LEED project boundary may not include land that is not owned by the project owner unless:
The land is associated with the LEED project and supports it’s normal building operations
The project team for a Core & Shell building in India is considering a composting program. Which statement is true regarding the IN Credit Innovation for a composting program?
IN Credit Innovation for Core & Shell can only be earned if all occupants including tenants of the building are allowed to participate in the program
The project team for a mixed use project located in Washington D.C. has more than 50% of it’s space for retail and remaining 40% or less for office space. How should the project team decide which rating system to use?
The project should use the 40/60 rule to decide on a rating system
The project team for a potential LEED project in Phoenix, Arizona submits a summary of early design stage submittal materials for GBCI review to pursue LEED Pre-certification. Which of the following statements must be true of the project?
The project must be registered under Core and Shell
The project team for an Existing Building office in Dubai is considering different Innovative strategies for IN credit Innovation. Which of the following criteria should be met for the IN credit?
Choose 3
- The strategy must be significantly better than standard sustainable design practices
- Strategies should be comprehensive
- Strategies must demonstrate a quantitative improvement
What best defines LEED project boundary?
Platted property line of the project defining land and water with in
What options within LEED credits address different geographic areas and climatic regions while providing solutions to challenges faced by projects at a regional level?
Alternative Compliance Paths (ACPs)
Which design decisions can earn a project IN Credit Option 1 Innovation in a new construction project?
Implementing a credit from LEED BD+C
Which of calculations is NOT provided by LEED for implementing commissioning changes?
Time value of money
Which of the following actions should the project team take if the project boundary is not clear?
Review the MPR
Which of the following are perks for a company that receives LEED Platinum awards for it’s HQ project?
Branding and public relations (PR)
Which of the following calculations are referenced under LEED Commissioning credits?
Choose 3
- Return on Investment (ROI)
- Simple payback period
- Cost-benefit ratio
Which of the following credits does have exemplary performance opportunities? choose 3
- Green Cleaning - Products and Materials
- Green Cleaning - Equipment
- Enhanced Indoor Air Quality Strategies
Which of the following defines substantial project completion for LEED certification?
Date on which the building receives a certificate of occupancy or similar official indication that it is fit and ready for use
Which of the following defines the LEED boundary for a single building development?
The entire project scope - generally limited to the site boundary
Which of the following elements of the LEED v4 development cycle is utilized for streamlining the approach to unique needs, constraints, and opportunities of different project types?
Adaptations
Which of the following fees is only applicable for LEED Core & Shell projects?
Pre-Certification Fees
Which of the following is true about Credit Interpretation Request (CIRs)?
CIRs can be submitted for prerequisites
Which of the following is true for innovations that are no addressed by existing LEED credits?
Choose 3
- Points can also be earned by achieving selected credits from other LEED rating systems
- The strategy must significantly better than standard sustainable design practices
- The project must demonstrate a quantitative improvement in environmental performance by identifying OR establishing a baseline of standard performance
Which of the following may earn a project IN Credit Innovation under option 1 - Innovation?
Select 2
- Designing and implementing a green housekeeping program
- Designing and implementing a green education program
Which of the following must be true of the project site, location and size in order to be eligible for LEED certification?
Choose 3
- The project boundary must include all contiguous land that is associated with the project and supports its typical operation
- The project should be constructed and operated on a permanent location on existing land
- The project building should be a minimum of 1,000 sq ft
Which of the following project strategies would earn an exemplary performance point under IN Credit Innovation Option 3 Additional strategies?
Choose 2
- Attain 97% threshold for the project using Energy Star Portfolio Manager Tool
- Meet at least 10% of total energy use with onsite renewable energy
Which of the following resources should be used to identify RP credits for a project?
USGBC website RP credit library
Which of the following special considerations would be part of the LEED project scope?
Choose 2
- An off-site facility or amenity
- A shared facility that may be used by the project occupants
Which of the following variables affect LEED Certification cost?
Choose 3
- Time when the project team submits documentation for review in LEED Online
- Projects’s size
- Project’s rating system
The school project is planning to earn site development-protect and restore habitat credit. The team has identified a certified land trust who will be providing financial support to the project. How often should financial support be offered?
Annually
The total site for a retail project is 45,000 sq. ft. How much should be the minimum financial contribution to earn SS credit 1-site development?
$2,250
Within how many days of inspection should the maintenance, repairs and stabilization be done under SS Credit-Rainwater Management?
60 days
A hospital project has 2,500 sq. ft of total roof area, of which 300 sq. ft is covered by mechanical equipment’s, making a total applicable area 2,200 sq. ft. The following heat island mitigation strategies have been included in the project design: - 1,250 sq. ft vegetated roof - 950 sq. ft of high reflectance roof with a three-year aged SRI of 90 Can the hospital earn SS credit-heat island reduction?
Yes
The illumination level measured with the lights on must no be more than _______% above the level measured with lights off for light pollution reduction credit.
20%
Which of the following are required documents for SS prerequisite 1 - Site Management Policy?
Choose 2
- Justification for operational elements not included in policy
- Site Management Policy document
Which of the following Does Not employ best management practices for site management policy?
Choose 2
- Diverting waste to landfills
- Use of high emission maintenance equipment
Which of the following must be considered by projects attempting to earn Site Development-Protect & restore Open habitat in an urban area?
Diversity of roof top vegetation to support local wildlife
A school is planning to vegetate 3% of total site area. It has also implemented few capitol cost measures to improve the site. Can this school earn credit for exemplary performance under SS credit-Site improvement plan?
No
Which of the following defines maximum illuminance values for outdoor lighting zones?
IESNA RP-33
What percentage of non-roof hardscape must be covered with a heat island reduction strategy for projects to be eligible for credit?
50%
Which of the following is a strategy for complying with the requirements of Heat Island Reduction Non-Roof?
Provide shade with solar panels
Can a school project earn exemplary performance for SS credit-light pollution reduction by shielding all exterior fixtures in order to avoid emitting light at vertical angle more than 90 degree from straight down?
No
The project is planning to earn light pollution reduction credit using perimeter measurement option. How many measurements are required and with how much spacing between them?
8 Measurements, 100 ft spacing
How often must high-reflectance surfaces be cleaned to maintain their heat island reduction potential?
At least every 3 years
For projects with exterior lights over 50 watts, which of the following strategies must be taken to comply with the requirements of light pollution reduction
Provide either full or partial shield
A project site includes a flat roof. Given that mechanical equipment, photovoltaic panels, and skylights are excluded, an innovation in Operations point can be awarded for SS Credit Heat Island Reduction: Roof if:
95% of the project roof area is a green roof system
Which of the following is a strategy to reduce light pollution?
Minimize upward illumination
A projects roof must be covered at least _______ by vegetation for the project to earn Heat Island Reduction Roof
50%
Which of the following would help with the exterior lighting requirements of SS Credit Light Pollution Reduction?
Night illumination levels less than 20% above the level measured when the lights are off
Eight measurements is the minimum number required for what?
Light levels along the perimeter for compliance with light pollution reduction
Why is light pollution a problem?
It disrupts nocturnal ecosystems
What best defines open-grid pavement systems according to LEED for achieving SS Credit Heat Island Reduction - Non roof?
Pavement that is less than 50% impervious and accommodates vegetation in the open cells
What types of fixtures are exempt from the interior lighting requirements of SS Credit Light Pollution Reduction?
Choose 2
- Emergency lighting
- Desk lamp with a plug load
Under Site Development for on-site restoration. What is the minimum amount of native/adapted vegetation the side should have in-place to promote diversity?
5,000 sq ft
In order to earn exemplary performance under SS credit-Heat Island Reduction, a vegetated roof system is installed for 95% of the project’s roof area. Can mechanical equipment’s and PV panels be included in the calculation?
No
A retail store is planning to earn heat island reduction credit by using combination of roof and non-roof option. What should the minimum initial solar reflectance (SR) value for a low-sloped roof structure?
82
Which of the two referenced standards are related SS credit-Heat Island Reduction?
Choose 2
- ASTM Standards E903 and E892
- Cool Roof Rating Council Standard
The project is a 10 story building in suburbs of Denver. The total site area is 45,000 sq ft. The site has 5,000 sq ft of impervious area. How much water has to be captured and treated using GI and LID practices in order to earn exemplary performance under SS credit-rainwater management?
2,500 sq ft
The project has 4,000 sq ft of hardscape. The following heat island mitigation strategies have been included in the project design: - 400 sq ft with a three year aged SR of 0.30 - 600 sq ft of parking with initial SR of 0.34 - 1,200 sq ft of shading with tree canopy. Can the project earn SS credit-heat island reduction?
Yes
What should minimum percentage of parking located undercover to earn exemplary performance credit under SS Credit-Heat Island Reduction?
95%
A campus project has five buildings with landscape irrigation. The buildings get their potable water from public water supply. How many total meters are needed for the buildings and water sources to comply with WE Prerequisite Building Level Water Metering?
5
A mixed use building has restaurants on 1st floors and offices on 2nd and 3rd floors. Which of the following must be true when calculating indoor water use?
Calculate each occupant group separately
A project is using metering faucets. The project team member measured the flow in gallons (liters) per cycle (gpc, lpc). What should the project team do before performing indoor water use reduction calculations?
The flow rate must be converted to a flow rate in gallons (liters) per minute (gpm, lpm)
A project is using metering faucets. The project team member measured the flow in gallons (liters) per cycle (gpc, lpc). Convert 0.2 gpc metering faucet with 12 seconds cycles duration, yo calculate faucet flow rate?
0.2 gpc x 60 sc / 12 sc = 1 gpm
A project pursuing WE Outdoor Water Use Reduction credit using option 3 - Irrigation Meter Installed is able to demonstrate 50% reduction in outdoor water use over the most recent 12 months compared with the established baseline. How many points can the project earn?
2 points
A project team is performing the ASHRAE energy use analysis to comply with EA Prerequisite Energy Efficiency Best Management Practices. As part of the analysis, the team collected three years of utility bills and examined average and peak utility costs. Which of the following should the project team develop to establish a baseline for building performance?
Choose 3
- Energy use index
- Energy demand index
- Energy cost index
A school project in Iowa is pursuing WE Credit Cooling Tower Water Use. In addition to attaining a minimum number of cooling tower cycles, what the minimum percentage requirement for recycled non-potable water use in order to earn 3 points for a school project?
20%
An existing building project includes a building addition and the original building is not metered. Which of the following must be true in order for the building to earn LEED Certification?
The project needs to install meters to cover only the entirety of the addition’s energy use
How can a LEED O+M project share building - level watering data with USGBC? Choose 2
- Through Energy Star’s Portfolio Manager
- Through a third party data source
How many points can a retail project earn with 12% reduction in water use beyond the prerequisite level under WE Credit Indoor Water Use Reduction under option 2 metered water use?
3 points
How many points can a school project earn with 24% reduction in water use beyond the prerequisite level under WE Credit Indoor Water Use Reduction under option 1 calculated water use?
3 points
If an entire plumbing system was completed after 1994, A baseline water use of __________ is needed
120%
If sub-meters DO NOT exist or the project DOES NOT have 12 months of data, what should a project do in order to comply with WE Prerequisite Indoor Water Use Reduction - Option 2 metered water use?
The project team may choose to install sub-meters for 80% of fixtures OR begin recording data
In case of Indoor Water Use reduction, what is the existing buildings water use baseline for building with a certificate of occupancy dated 2000?
120%
In order to receive the maximum points for EA Credit Renewable Energy and Carbon Offsets what percent of energy consumed during the performance period must be renewable?
Points from renewable energy = (% Renewable energy) / 1.5% 5 X 1.5% = 7.5%
Meters installed to measure usage for water metering must be?
Permanently installed
The water efficiency credits can provide the most significant savings to:
Energy costs
What is a site’s water budget?
How the site expects to use water and when that water will be needed
What is the existing building water use baseline, for building with a certificate of occupancy dated 1950 in case of Indoor Water Use Reduction?
150%
What is the maximum establishment period beyond which the landscape should NOT be irrigated if the project pursue WE Credit Outdoor Water Use Reduction using Option 1. No irrigation Required?
2 years
What is the maximum number of points that a data center project can earn under indoor water use reduction credit excluding the exemplary performance?
4 points
What is the maximum points that a data center project can earn using cooling tower water use credit?
4 points
What is the minimum percentage reduction required to earn exemplary performance using metered water use option under WE credit indoor water use reduction?
25%
What plumbing fixture standard(s) will yield the greatest water savings for private lavatory and aerators?
EPA Water Sense Standard
What should be the minimum percentage of fixtures and fittings that need to be metered in order to comply with WE Prerequisite Indoor Water Use Reduction - Option 2 metered water used?
80%
What type of water should be avoided for makeup water?
Stormwater runoff from the ground surface
Which of the following are Non-Potable water sources that could be used for cooling tower?
- Drinking water
- Naturally occurring surface water
Which of the following can have a WaterSense label?
Choose 2
- Private lavatory faucets
- Water-using urinals
Which of the following credits under water efficiency has a potential to earn maximum number of points?
Indoor Water Use Reduction
Which of the following credits will benefit from ASHRAE level 1 energy audit?
MR Credit: Purchasing - Lamps
Which of the following does NOT need to be commissioned?
All interior finishes are installed after occupancy
Which of the following is true respect to metering water use for a project that has an addition to an existing facility to comply with WE Prerequisite Building Level Water Metering?
A single meter that covers both old and new portions of the building may be installed
Which of the following must be true for a project that decides to meter alternative water sources to comply with WE Prerequisite Indoor Water Use Reduction - Option 2 metered water use
The project team may choose to install submeters for 80% of fixtures OR begin recording data
Which of the following statements DOES NOT describes the requirements for water metering credit?
Must be owned by the utility or government
Which of the following water subsystems must have 100% of the source sub-metered for WE Credit Water Metering?
Choose 2
- Cooling towers
- Reclaimed water
Which of the following WE Credit has a potential to earn exemplary performance?
Indoor Water Use Reduction
Which of the following non-potable water sources would you recommend for a project team pursuing WE Credit Cooling Tower Water Use?
Choose 3
- Steam system condensate
- Air - conditioning condenaste
- Ice machine condensate
A 3rd party Energy Auditor completed a Level I walk through for a project pursuing LEED certification. The auditor discussed the report’s details with the operating staff, particularly low-cost improvement opportunities that will improve operations and save energy. Which of the following must be true with respect to the project’s compliance of EA Prerequisite Energy Efficiency Best Management Practices. Which of the following should the report address?
The project team need not implement the low-cost improvement opportunities
A data center project should use which of the following tools to comply with EA Prerequisite Energy Efficiency Best Management Practices?
U. S. Department of Energy’s DC PRO Profiling Tool
A project building is seeking credit for the efficiency of the District Energy Systems (DES) under EA Credit Optimize Energy Performance. Which of the following should be true with the commissioning scope if the project plans to earn EA Credit Ongoing Commissioning?
Choose 2
- All upstream equipment associated with serving the project building is included in the scope
- All downstream equipment within a District Energy System (DES) is included in the scope
A project generates 1.5% energy on-site through PV panels and plans to purchase carbon offsets for 100% of the natural gas consumption and electricity consumption. How many points will the project earn under EA Credit: Renewable Energy and Carbon Offsets?
1.5% / 1.5% + 100% / 25% = 5
A project has 3 suit that are not currently occupied. How should vacant area be accounted for in Energy Star Portfolio Manager?
Vacant space should be separately entered along with occupied space
A project has confirmed natural ventilation effectiveness using the CIBSE reference standard. Which of the following data is required by the project to perform natural ventilation procedure using ASHRAE 62.1-2010?
Choose 3
- Ceiling heights
- Location of natural ventilation openings
- Size of the natural ventilation openings
A project has fossil fuel-burning generators and micro-turbines on site along with solar panels that generate renewable energy. Which of the following must be true for the project to achieve EA Credit Advanced Energy Metering?
The project should count both renewable and non-renewable sources of on-site energy generation for advanced metering
A project has not earned an Energy Star label. What is the benefit of sharing access to the project’s Energy Star Portfolio Manager data with the USGBC master account?
Minimizing the number supporting documents required for certification
A project is located in an area where a Demand Response Program exists. Which of the following might qualify for a project to earn EA Credit Demand Response?
- Energy Use Reduction Programs
- Summer or Winter peaking programs
- Interruptible load programs
A project is planning to implement EA Credit Demand Response. Which of the following strategies qualify for demand reduction strategies during a DR event? Choose 3
- Global temperature adjustments increase cooling setpoints OR decrease heating setpoints
- Reschedule housekeeping activities, such as dishwashing
- Turning off decorative features, like fountains and video display
A project is planning to use bio-fuel based renewable energy system. Which of the bio-fuels are NOT ELIGIBLE for EA Credit Renewable Energy Production?
Choose 2
- Forestry biomass waste, other than mill residue
- Pressure treated lumber
A project is planning to utilize renewable energy generated from a PV array and wind turbine, not owned by the project owner but a third party. Which of the following statements must be true for the project to earn A Credit Renewable Energy Production?
Choose 2
- The project must have a purchase agreement with 3rd party that last for at least 10 years
- The project owner must retain all environmental benefits from the renewable energy produced off-site through the 3rd party
A project is planning to utilize renewable energy to earn EA Credit Renewable Energy Production. Which of the following systems would qualify as renewable energy to meet the credit requirements?
Choose 3
- Geothermal energy fro subterranean steam or hot water
- Biofuel from combustion of mill residue
- Heat produced from a boiler that uses biofuel
A project not eligible for Energy Star Rating may use which of the following to benchmark the building’s energy performance to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
- Comparisons with national source energy data or similar comparable buildings
- Project building’s historical energy use
A project performed an audit to qualify for a rebate from a local utility company within the last 2 years. Which of the following is true regarding the project as it applies to ASHRAE Level 1 energy audit to comply with EA Prerequisite Energy Efficiency Best Management Practices?
The project must complete a ASHRAE Level 1 Audit to meet prerequisite requirements
A project planning to purchased green power through carbon offsets must meet which certification’s standards to qualify as off-site renewable sources of energy for LEED projects?
Green-e Climate certified
A project pursuing EA Credit Advanced Energy Metering should meter all end uses except:
Plug loads
A project pursuing EA Credit Optimize Energy Performance is pursuing case 2 option 1 since it is ineligible for Energy Star Rating. The project demonstrate energy efficiency performance of 40% better than the median energy performance for typical buildings of similar type. How many points will the project earn under EA credit Optimize Performance?
15
A Project pursuing EA Credit Optimize Energy Performance receives a score of 92 using Energy Star Portfolio Manager. How many points will the project under EA Credit Optimize performance?
18
A project that is not eligible to earn Energy Star rating may choose which of the following as baseline for energy performance to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
- National average data for similar buildings
- Project Building’s Historical Data
A project that was certified under BD+C is pursuing LEED EB O+M certification after 3 years of building occupancy. The team is pursuing EA Credit Advanced Energy Metering. Which of the following may be used to establish baseline consumption and demand data?
choose 2
- A calibrated energy model
- 12 months of historical energy and demand measurements
A project with older existing HVAC&R system uses CFC based refrigerant. What can the project team do to earn LEED certification?
Replace the HVAC&R system with one that does not use CFCs
A project’s Energy Star score is 74. Which of the following should the project do to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
- Use the results of the energy audit to determine the areas of greatest opportunity to improve performance
- Start with the no/low cost items found in the energy audit to improve the Energy Star score
An existing building office project team is using the CBECS 2003 End-Use Consumption Tables to estimate common energy end uses. What will the team be required to do when sub-metering the end-uses for EA Credit Advanced Energy Metering?
Use a building automation system (BAS) or software for data collection
An existing building project team is planning to pursue EA credit Advanced Metering. However, the end-use energy data is not available. Which of the following may help the project team in identifying the major end uses of the building?
The results of the ASHRAE Level I Walk-through
An existing warehouse is not eligible foe ENEGY STAR rating. How many points can the project earn if the energy efficiency performance is 30% better than the median energy performance for typical buildings of similar type by benchmarking against national average source energy data provided in the portfolio manager tool?
2 points
An office building operation team had completed a level I walk through within the last 2 years. The team is now preparing a report to comply EA Prerequisite Energy Efficiency Best Management Practices. Which of the following should the report address?
choose 3
- The report should include comparison of project building with similar building types
- The report should include Current Energy Cost Index, Energy Demand Index, Energy Use Index, and reduction goals
- The report should include low-cost improvement opportunities that will improve operations and save energy
An ongoing commissioning cycle as part of EA Credit Ongoing Commissioning must not exceed:
24 months
Based on which of the following standards should the energy audit be performed in order to comply with EA Prerequisite Energy Efficiency Best Management Practices?
ASHRAE Procedures for Commercial Building Energy Audits
Chloroflurocarbons, which are refrigerants that lead to the depletion of the stratospheric ozone layer, were banned under the:
Montreal Protocol
Determining major energy end uses is part of which of the following credits? Choose 2
- EA Credit: Existing Building Commissioning-Analysis
- EA Prerequisite: Energy Efficient Best Management Practices
For the building seeking Energy Star Certification, the operating variables in Portfolio Manager that need to be adjusted for building include all but which of the following:
Fuel type
How can an existing building project team find information to determine the energy cost to be offset by the renewable energy systems to earn EA Credit On-site Renewable Energy?
Commercial Buildings Energy Consumption
How long should a project implement the tasks (monitoring system performance, executing functional tests, and verifying equipment operation) under Existing Building Commissioning?
6 - 18 Months
How many points can the project earn if the demand response program is available?
3 points
How many points can the school project earn under EA credit Existing Building Commissioning - Analysis?
2 points
How must the cooling system be metered for EA Credit Advanced Energy Metering if the project is served by multiple built-up air-handling units (RTUs)?
Metering is left to the discretion of the project team in such cases
How often must energy meters in buildings attempting LEED re-certification take energy usage measurements?
Continuously
If CFC based refrigerants are present, what annual leakage rate does LEED permit in order to comply with EA Prerequisite Fundamental Refrigerant Management?
5% or less annual leakage or 30% or less total lifetime leakage
If CFC-based refrigerants are maintained in the building, what should be percentage to reduce leakage as per Clean Air Act?
1% or less
If initial benchmarking (CASE 1 when building is eligible for Energy Star Rating) shows the building DOES NOT meet the minimum requirements to comply with EA Prerequisite: Minimum Energy Performance, the project should consider which of the following?
Choose 3
- Perform a basic energy use analysis and a walk-through audit
- Collect utility bills
- Consider an advanced audit or commissioning process to identify further savings opportunities
In an existing building retrofit when must all CFC-based equipment in the base building HVAC&R systems be phased-out?
Within 10 years
In order to meet establishment requirements of EA Prerequisite: Energy Efficient Best Management Practices, a project’s Current Facilities Requirements (CFR) should include which of the following elements?
Choose 3
- Operational space requirements
- Building drawings
- Functional space requirements
In what situations is the use of CFC-based refrigerants in HVAC&R base building elements permitted as part of the requirements for Fundamental Refrigerant Management?
When a CFC phase-out plan is in place
Performance Measurement - System Level Metering requires projects to compile energy use data at least how often?
Monthly
The in-house operation team for a project completed a Level I energy audit within the past 4 years. Which of the following is true regarding the project as it applies to ASHRAE Level 1 energy audit to comply with EA Prerequisite Energy Efficiency Best Management Practices?
Projects completing a Level I assessment within the past 5 years are not required to repeat the assessment
The retail store has ENERGY STAR rating of 93. How many points can it earn under EA Credit Optimize Energy Performance?
19 points
Under what circumstances is the use of CFC-based refrigerants in HVAC&R base building elements permitted as part of the requirements for Fundamental refrigerant management?
Choose 2
- A third party audit shows that system replacement or conversion is NOT economically feasible
- A phase-out plan for CFC-based refrigerants is in place scheduled to complete in 10 years
What is the minimum contract length required for Demand Response Credit?
One year with the intention of multiyear renewal
What is the minimum number of commitment required to share building level metering data with USGBC?
5 years
What minimum load must be permanently shifted to earn Demand Response?
10% of the measured or calculate peak load
What system can be excluded from Energy and Atmosphere, enhanced refrigerant management?
Window HVAC unit with less than 0.5 lbs of refrigerant
When choosing refrigerants, the best choice to make are refrigerants with:
Short environmental lifetimes, small ODP values, and large GWP values
Which of the following activities are part of the commissioning cycle of existing building commissioning?
Choose 2
- Performance verification
- System testing
Which of the following are performance requirements for a project pursuing EA credit Advanced energy metering?
Choose 2
- Report the facility’s utility peak demand and total consumption on at least a monthly basis
- Program the facility’s energy management system to set an alarm whenever the energy consumption and peak demand rise above the anticipated amount by more than 5%
Which of the following are performance requirements for existing building commissioning - implementation?
Choose 3
- Update the operations & maintenance plan and the current facilities requirements
- Implement no-or-low cost improvements
- Confirm training of building operations staff
Which of the following can be submitted to streamline the documentation of EA Prerequisite Minimum Energy Performance if the project building has already earned a Energy Star label?
Statement of energy performance stamped by a professional engineer or licensed architect
Which of the following credits will have a positive impact if a LEED project earns an Energy Star rating of 80?
EA Credit Optimize Energy Performance
Which of the following information on Energy Star Portfolio Manager must be kept up-to-date during the performance period to earn points under EA Credit Optimize Energy Performance?
Choose 3
- Space type changes
- Energy consumption for all energy sources
- Number of occupants and vacant spaces
Which of the following is a purpose of the ASHRAE Level 1 Walk Through Analysis?
To provide a general understanding of a building energy flows and end uses
Which of the following is a requirement of EA Credit Existing Building Commissioning - Analysis?
Create a written summary of the overall commissioning cycle
Which of the following is a requirement of Existing Building Commissioning-Implementation?
Provide training for management staff in sustainable building operations
Which of the following is NOT part of a mechanical management plan for cooling towers?
Heating loads
Which of the following methods can be used by a project to determine HVAC system configuration(s)?
Choose 3
- Field Investigations
- As - built drawings
- Building Automation Systems
Which of the following methods maybe used by the project to determine major energy uses as part of EA Credit Existing Building Commissioning-Analysis?
Choose 3
- Energy modeling
- CBECs
- Sub-metering specific systems and equipment
Which of the following must be submitted to comply with EA Prerequisite Building Level Energy Metering ?
Choose 3
- Confirmation of data sharing source
- Letter of commitment
- Confirmation of permanently installed meters
Which of the following must be true for food retail projects with commercial refrigeration to meet EA Credit: Enhanced Refrigerant Management requirements?
Attain of EPA GreenChill’s silver-level store certification
Which of the following must be true for projects with DES systems to comply with EA Prerequisite Fundamental Refrigerant Management?
All upstream and downstream equipment owned by the project building must meet the prerequisite requirements
Which of the following must true for a data center project with respect to EA Prerequisite: Building Level Energy Metering?
IT energy consumption, as measured from an uninterruptible power supply (UPS) output meter, should be metered separately from non-IT equipment
Which of the following project characteristic should the project team stay consistent with for EA credits compliance?
Choose 3
- Space categorization
- Space use
- Occupancy
Which of the following should a project do in order to meet establishment requirements of EA Prerequisite: Energy Efficient Best Management Practices? Choose 3
- Create Operations and Maintenance Plan
- Create Current Facilities Requirements
- Conduct Phase I Energy Audit
Which of the following should be metered for building-level energy metering prerequisite?
Choose 3
- Electricity
- Biofuels
- Hot water
Which of the following standard is not related to EA prerequisite Building-Level Energy Metering?
Environmental Protection Agency ENERGY STAR Portfolio Manager Tool
Which of the following units should be included in Fundamental Refrigerant Management?
HVAC units with 5 lb of refrigerants
While determining gross area of each space type and enter energy consumption, projects may exclude what % of floor area if under separate management and control?
10%
Who among the following should be part of the Energy Audit team?
Choose 3
- Owner
- Energy auditor
- Building engineering staff
Within how many years should the phase-out be scheduled for completion CFC-based refrigerants to comply with EA Prerequisite Fundamental Refrigerant Management?
10 years
A corrective action plan must be implemented to address comfort issues if the results of an occupant survey indicate what % of the occupants as dissatisfied?
20%
A LEED Core & Shell project team in New York City, New York is preparing a green housekeeping program to earn an innovation point. Which of the following should the project team do to earn the credit?
The base building management must control the cleaning of both the base building and tenant space
A project decides to provide increased filtration and increased ventilation to earn EQ credit Enhanced IEQ Strategies. Which of the following credits may have a negative impact due to increased filtration and increased ventilation?
Choose 2
- EA Credit Optimize Energy Performance
- EA Prerequisite Minimum Energy Performance
A project has confirmed natural ventilation effectiveness using the CIBSE reference standard. Which of the following data is required by the project to perform natural ventilation procedure using ASHRAE 62.1-2010? Choose 3
- Ceiling heights
- Location of natural ventilation openings
- Size of the natural ventilation openings
A project has views into interior atria. Which of the following is true regarding the views of the atria to support requirements of EQ Credit Daylight and Quality Views?
Views into interior atria may be used to meet up to 30% of the required area
A project is pursuing option 2 - Certified Cleaning Services for EQ Prerequisite: Green Cleaning Policy. Which of the following are required to be completed by the project to comply with credit requirements using option 2.
Choose 3
- Determine whether the vendor is certified by one of the approved third parties
- The selected vendor must develop a plan for reduced water, energy, and toxic chemical use
- An audit of the vendor’s certification must be completed within 12 months of the performance period
A project is pursuing Option2 Additional Enhanced IAQ STrategies under EQ Enhanced Indoor Air Quality Strategies. To be exempt from inclusion of carbon dioxide monitors, Which of the following must be true?
Rooms must be less than 150 sq ft
A project is ready to conduct the custodial effectiveness assessment. Who among maybe the audit personnel?
Choose 2
- 2 individuals associated with the building management trained in APPA guidelines
- Independent third party
A project lighting team is in the process of updating light fixtures with ones that have an illuminance of less than 2,500 cd/m2 for all regularly occupied spaces. This would help which of the following?
Reducing disability and discomfort glare
A project naturally ventilated should use which of the following reference standards to determine minimum outdoor air required to comply with EQ prerequisite minimum IAQ performance
ASHRAE Standard 62.1 - 2010
A project opted for option 2 - Certified IPM Service. Which of the following must be submitted as documentation to earn EQ Credit Integrated Pest Management? Choose 2
- IPM tracking tool
- GreenPro, EcoWise, or GreenShield certificate
A project pursuing LEED O+M certification has spaces that employ natural ventilation and mixed-mode systems when the mechanical ventilation is inactivated. Which of the following must the project do to comply with EQ prerequisite: Minimum IAQ performance?
Choose 2
- Determine the minimum outdoor air opening and space configuration requirements using the natural ventilation procedure
- Projects should confirm that natural ventilation is an effective strategy for the project by following the flow diagram in the CIBSE Applications Manual
A project team is evaluating several lighting quality strategies. Which of the following light sources will approximate natural light?
A light source with a color-rendering index above 80
A project using automated scrubbing machines should comply with which of the following?
Choose 2
- It should be equipped with variable-speed feed pumps
- It should have on-board chemical metering or dilution control systems for chemical refilling
_A project using propane-powered floor equipment should operate with a sound level of ________ in accordance with ISO 11201?_
90 dBA
A project with mechanical ventilation pursuing option 2 under EQ Credit: Enhanced Indoor Air Quality Strategies decides to address filtration for each ventilation system that supplies outdoor air to occupied spaces. What should be the minimum efficiency reporting value (MERV) of the filters be to qualify for this credit?
MERV of 13 or higher
A project with natural ventilation pursuing option 2 under EQ Credit: Enhanced Indoor Air Quality Strategies may choose which of the following strategies to improve IAQ to earn a point?
Choose 2
- Alarmed openings
- Carbon-dioxide monitoring
A project with naturally ventilated spaces will need to include a mechanical ventilation system as a backup under which of the following circumstance?
Choose 3
- When the natural ventilation openings are not permanently open
- The naturally ventilated zone is served by heating or cooling equipment
- When the natural ventilation openings include controls that allow for closing during occupied hours
A residential project pursuing option 1 - entry way systems under EQ Credit: Enhanced Indoor Air Quality Strategies should do which of the following?
Provide entryway systems for each residential entrance from the outdoors
A retail project pursuing LEED O+M certification should take which of the following actions to prevent or minimize occupant exposure to environmental tobacco smoke?
Choose 2
- Post signage indicating the no-smoking policy within 10 feet (3 meters) of all building entrances
- Prohibit smoking inside the building
An existing office building located in a dense urban area is 50 story’s tall. The project would have difficulty achieving which type of view to document compliance for EQ Credit Daylight and Views?
Views of movement
An office has created a green cleaning policy and a tracking plan. The project should track all of the following except:
Pesticides used
An office project has walls green walls or vertical landscaping on two sides of the building. This type on landscaping would help a project with which type of view?
Flora, fauna and sky
At a minimum, which systems must a BAS monitor?
Choose 2
- Lighting
- Ventilation
_CO2 sensors in mechanically ventilated areas must be calibrated to be accurate within ________ ppm or 5% of the reading_.
75
During the performance period what does the project with mixed mode ventilation need to do comply with EQ Prerequisite Minimum IAQ?
Choose 2
- Measure outdoor airflow to demonstrate sufficient ventilation is being supplied to the building
- Implement and maintain an HVAC system maintenance program, based on ASHRAE 62.1-2010
During the performance period what requirement must meet the criteria to attain IEQ credit Green Cleaning -Equipment?
All new powered equipment
For hospitality projects what spaces are excluded from EQ Credit Thermal Comfort requirements?
Guest rooms
How does the project team confirm that natural ventilation is an appropriate strategy for minimum IAQ?
Use the CIBSE manual
How frequently should occupant surveys be performed to achieve IEQ Credit Occupant Comfort Survey?
Every 2 years
How many cleanliness levels are there under APPA’s Custodial Staffing Guidelines?
5
How often should the entryway systems maintained to comply with option 1 under EQ Credit: Enhanced Indoor Air Quality Strategies?
Weekly
How would a project team determine the baseline data used to inform the thermal comfort zone calculation that is used to establish alarm set point?
Choose 2
- Using handheld meters
- Using permanent monitoring equipment if present
In order to meet the requirements of EQ Credit: Green Cleaning-Equipment, all electrical powered equipment must have which of the following features?
Choose 3
- Safeguards
- Ergonomic design
- Environmentally preferable batteries
Individual lighting controls and controls for shared multi-occupant spaces must support at least what to count toward EQ Credit Interior Lighting?
Three lighting levels
Project team should measure outdoor airflow rate for each ventilation system in accordance with which of the following standards for EQ Prerequisite: Minimum IAQ Performance?
ASHRAE Standard 111-2008
Projects in the U. S should follow which of the standards when selecting filters or devices with minimum efficiency reporting value (MERV)?
ASHRAE Standard 52.2 - 2007
The maintenance plan for ventilation systems during the performance period is typically satisfied by which of the following?
The preventive maintenance plan required for EA Prerequisite Best Management Practice
Under which condition should the calculations run when performing the ventilation rate procedure for ASHRAE 62.1-2010 to determine the required outdoor airflow for EQ prerequisite Minimum IAQ performance?
In heating mode when the supply airflows are lowest or supply air temperature is highest
What % of equipment must meet the sustainability criteria to achieve EQ Credit Green Cleaning-Equipment?
40% of all equipment purchased, leased, or used by contractors
What amount of space needs to be audited for achievement of IEQ Credit Green Cleaning-Custodial Effectiveness Assessment?
10% of each of the rooms in each space category
- What approved third-party certifications are acceptable when choosing a certified cleaning company to support a green cleaning policy?*
- Choose 2*
- International Sanitary Supply Association (ISSA) Cleaning Industry Management Standard for Green Buildings (CIMS-GB)
- Green Seal’s Environmental Standard for Commercial Cleaning Services (GS-42)
What attributes of vacuum cleaners will meet the sustainability criteria of EQ Credit Green Cleaning-Equipment?
Choose 2
- Operate with a maximum sound level of 70 decibels or less
- Certified by the Carpet and Rug Institute
What conditions should trigger an outdoor air delivery alarm to the system operator in densely populated mechanically ventilated spaces?
If the CO2 concentration in any zone rises more than 15% above that corresponding to the minimum outdoor air rate
What defines the action threshold for all pests and non chemical pest preventive measures as it relates to EQ Credit: Integrated Pest Management?
The point beyond which property must take some remedial action
What is the minimum level of cleanliness must a project achieve based on APPA’s Custodial Staffing Guidelines?
2.5
What minimal measurements must be taken for air temperature and humidity to achieve EQ Credit Thermal Comfort?
Measurements in occupied spaces, at sampling intervals of at least 15 minutes
What must a school project do to indicate smoking is not allowed to comply with EQ Prerequisite: Environmental Tobacco Smoke Control?
Post signage at the property line adjacent to all pedestrian and vehicular entrances indicating the no-smoking policy
What must be the minimum APPA score to earn points for the Custodial Effectiveness Assessment?
3
What should be done with the existing equipment that does not meet the criteria to meet the requirements of EQ Credit Green Cleaning-Equipment
Develop a phase-out plan for its replacement with environmentally preferable products at the end of its useful life
When installing humidity sensors in a building to achieve IEQ Credit Thermal Comfort, what conditions must be met?
At least one sensor must be installed in each distinct humidity zone
Which of the following actions must a project take within 5 years of the performance period to comply with EQ Prerequisite: Minimum IAQ Performance?
Choose 2
- Implement and maintain an HVAC system maintenance program
- Demonstrate and verify sufficient ventilation
Which of the following areas must a project address to maintain good indoor air quality (IAQ)? Choose 3
- Remove contaminants from outdoor air
- Control pollutant sources
- Supply at least some fresh air
Which of the following credits does not have exemplary performance opportunities?
Green Cleaning - Custodial Effectiveness Assessment
Which of the following criteria should be used by the project team to classify a space as densely occupied?
Spaces with occupant density of 25 people or more per 1,000 sq ft
Which of the following enhanced IAQ is not available for naturally ventilated spaces?
Filtration
Which of the following EQ credits requires project teams to develop and implement an Indoor Air Quality (IAQ) management program based on the EPA Indoor Air Quality Building Education and Assessment Model or I-BEAM?
EQ Credit: Indoor Air Quality Management Program
Which of the following factors should be considered for an effective thermal comfort strategy?
Choose 3
- Clothing
- Metabolic rate
- Humidity
Which of the following is an area or zone with similar occupancy, categories, occupant density, zone air distribution effectiveness and zone primary airflow?
Ventilation zone
Which of the following is not a part of SMACNA’s recommendation for Indoor Air Quality Policy for Maintenance and Renovations?
All interior finishes are installed after occupancy
Which of the following is Not a requirement of the Indoor Air Quality Management Program?
Provide 30% more ventilation over ASHRAE 62.1 Standards
Which of the following must be done at a minimum to earn EQ credit Thermal Comfort?
Install Permanent Monitoring
Which of the following should be included in the I-Beam audit report to comply with EQ Credit: Indoor Air Quality Management Program?
Choose 2
- Strategy and timeline to remedy issues that require expenditure
- Actions taken to remedy no-cost issues timeline
Which of the following spaces should be listed as unoccupied?
Data center floor area
Which of the following standards would a project team use for thermal comfort in a mechanically ventilated building?
Choose 2
CIBSE AM 10 ISO Standard 7730:2005 and CEN Standard EN 15251:2007
Which of the following ventilation strategies adjusts the amount of outdoor air in response to occupancy?
Demand - controlled ventilation
What is the reference standard to Reduce Particulates in Air Distribution?
ASHRAE 52.2 - 2007
A project is pursuing Option 1. In-house IPM Policy to earn EQ Credit: Integrated Pest Management. What should be the first step of the IPM team?
Identify potential pests and control thresholds
To achieve EQ credit, Green Cleaning-Products and Materials a project must have 75% of its cleaning purchases, by cost, certified by a given standard. Which standard should be used when determining the product to purchase for industrial and institutional general purpose, bathroom, glass and carpet cleaner?
Green Seal GS-37
A $500 product is Cradle to Cradle v2 Platinum certified. What value of the product contributes to credit achievement of MR Credit Purchasing-Facility Maintenance and renovation?
$500 + 150% = $750
A preventive maintenance are part of __________?
Operation & Maintenance plan
A project has electric-powered equipment and appliances not rated by Energy Star or the Electronic Product Environmental Assessment Tool (EPEAT).
Which of the following is true regarding achievement of MR Credit: Purchasing-Ongoing?
Equipment not rated by Energy Star or EPEAT is excluded from credit calculations
A project installs $5,000 worth gypsum board. The purchased product qualifies for recycled content (50% recycled by weight), extended producer responsibility, and the ingredients do not contain substances of very high concern per REACH criteria. What is the contributing value of this product towards MR Credit: Purchasing - Facility Maintenance & Renovation?
$10,000
A project must establish storage locations for which of the following items as part of the solid waste management policy? Choose 2
- Hazardous waste
- Recyclable materials
A project pursuing LEED certification under O+M rating system is undergoing facility maintenance. When creating the policies for facility maintenance and renovation who determines at what point maintenance work becomes renovation?
The project team
A project team should use which of the following to establish a baseline that identifies the types of waste making up the waste stream and the amounts of each type by weight or volume to comply with MR Credit: Solid Waste Management-Ongoing?
Waste stream audit
A project that will not create a solid waste management policy is ineligible for what?
LEED Certification
A retail project pursuing certification under LEED O+M may choose which of the following options for environmentally responsible sourcing to meet the requirements of MR Prerequisite: Ongoing Purchasing & Waste Policy?
- Supply Chain Education Program for Retail Employees
- Establish a Supply Chain Environmental Criteria List
- Establish a Supply Chain Survey
- Sustainable Purchasing Education for Customers
A solid waste management policy should cover products purchased within what spaces if the building has multiple tenant spaces?
Spaces that are under the building & site management’s control
For a hospitality project, what is the minimum percentage of food and beverages purchase complying with required criteria to earn exemplary performance under MR Credit Purchasing Ongoing?
50%
For school projects seeking LEED certification under O+M rating system, what should be the minimum percentage of purchases by cost for total combined food and beverages to comply with the requirement criteria under MR Credit Purchasing-Ongoing?
25%
How is waste measured during the waste stream audit?
Weight or volume
How often should the waste stream audit be performed to maintain a high-performing solid waste management program?
Once every 5 years
In order to qualify for MR Credit Purchasing-Ongoing, an electric powered equipment should meet which of the following criteria?
Silver EPEAT rating or better
What do all project types have to document for MR Prerequisite Ongoing Purchasing and Waste Policy?
Choose 3
- Waste stream audit report
- Solid Waste Management Policy
- Floor/and or site plan identifying recycling storage areas
What does the Fairtrade Labeling Organization certify?
Agricultural products
What information would the project team record when conducting an inventory of lamps?
- NAED code
- Manufacturer details
- Quantity installed
What is the minimum percentage of diversion from landfills and incinerators for the project to earn exemplary performance under MR Credit Solid Waste Management-Ongoing?
75% of ongoing consumables and 100% of durable goods
What must the project team do if equipment non-compliant with EPEAT does not need to be replaced to comply with MR Credit Purchasing-Ongoing?
Create a phase-out plan to replace the equipment with complaint equipment at the end its useful life
What percentage of electric powered equipment should meet credit criteria to earn MR Credit Purchasing-Ongoing?
40% of total purchases (by cost) during the performance period
What percentage of facility alterations and additions waste must be diverted from landfills or incinerators facilities to earn exemplary performance in Solid Waste Management
95%
What percentage of mercury-containing lamps purchased during the performance period must comply with the purchasing plan and have an overall target of mercury content ox 70 picograms per lumen-hour to earn MR Credit Purchasing-Lamps?
100%
What rating system can be used to evaluate the environmental performance of a laptop computer?
EPEAT
What should be the minimum percentage of ongoing waste to be diverted from landfill in order to maintain a high-performing solid waste management program?
75%
What should be the minimum percentage of purchases for electric-powered equipment to comply with the requirement criteria under MR Credit Purchasing-Ongoing?
40%
What should the project team do when calculating waste to comply with MR Credit: Solid Waste Management-Ongoing
Project may use weight / volume to calculate waste
What value of the product contributes to credit achievement of MR Credit Purchasing-Facility Maintenance & Renovation if it costs $100 and contains 10% post-consumer recycled content by weight?
$10
What waste must be included in the waste audit to comply with MR Prerequisite: Facility Maintenance & Renovation Policy?
All waste leaving the building must be audited
When choosing the distance option, local sourcing of food purchases must be made within what radius of the project site to qualify for a 200% valuation for MR Credit Purchasing-Ongoing?
100 miles
When documenting for MR Credit: Solid Waste Management-Ongoing. Which of the following project types are required to document that food waste composting services not available?
Schools
When should projects adopt sustainable purchasing policy?
Prior to the performance period
Which materials are NOT included in an ongoing consumable purchasing program?
Power strips
Which of the following are considered ongoing consumables products? Choose 2
- Batteries
- Notebooks
- Which of the following are included in calculations for solid waste management- durable goods?*
- Choose 2*
- Copiers
- Printers
Which of the following best practices may be considered by the project for safe disposal of hazardous items and effective recycling and reuse of other products? Choose 3
- Provide clearly labeled battery collection bins in high-visibility areas, such as near mailboxes or in the lobby
- Identify a qualified, licensed recycler that will recycle lamps in accordance with state and federal requirements
- Review state and local laws that govern disposal and recycling of batteries in the project’s location
Which of the following can NOT be included under ongoing purchases for environmentally preferable purchasing?
Printers
Which of the following certifications is awarded to farms that protect wildlife by planting trees, controlling erosion, limiting agrochemicals?
Rainforest Alliance
Which of the following characterize the performance requirements under MR Prerequisite: Ongoing Purchasing and Waste Policy?
Maintain a high-performance solid waste management program by conducting a waste stream audit of ongoing consumables at least once every five years
Which of the following does a facility maintenance and renovation policy address that an ongoing purchasing and solid waste management policy DOES NOT?
IAQ
Which of the following Durable Goods Purchases should also be addressed while developing a Environmentally preferable purchasing policy?
Choose 2
- Appliances
- Electric powered equipment