leed Flashcards

leed

1
Q

Which of the following materials are may be classified as Rapidly Renewable Materials bio-based materials under the LEED rating system?(Select 3)

A

Cotton Bamboo Linoleum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What reference standard sets the baseline for indoor water consumption?

A

Energy Policy Act of 1992

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

All of the following are strategies to reduce outdoor water use EXCEPT?

A

Choosing invasive plants

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The LEED Checklist has which of the following options next to each credit?

A

Yes, Maybe,and No (Y/?/N)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

To which of the following might a demand-controlled ventilation system, and the energy saved from that system, contribute? (Select 2)

A

Energy and Atmosphere

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many years of historical rainfall data must project teams obtain in order to achieve Option 1: Percentile of Rainfall Events for the Rainwater Management credit?

A

10 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For the Light Pollution Reduction credit, light trespass refers to:

A

Obtrusive illumination that is unwanted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the advantages of compact development? (Select 3)

A

More efficient public transportation Less sprawl More pedestrian friendly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following strategies would promote better erosion and sedimentation control during construction? (Select 2)

A

Sediment basin mulching

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are two responsibilities of the contractor that support LEED documentation? (Select 2)

A

Provide evidence of waste diverted from landfill Provide material safety data sheets or other manufacturer source of VOC data with paint submittals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following organizations publish data regarding the emissions and/or fuel efficiency of vehicles?

A

ACEEE American Council for an Energy Efficient Economy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which of the following best describes a synergy between EQ (Environmental Quality) and EA (Energy and Atmosphere)?

A

Increased daylight glazing could reduce the need for electric lighting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When calculating percentages for recycled content for materials and resources, what is the equation used?

A

(.5) Pre-Consumer + Post-Consumer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which two of the following are nonregularly occupied spaces? (select 2)

A

Bathrooms Hallways

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which of the following elements would not be included in the scope of fundamental refrigerant management? (Select 2)

A

Water cooler Standard refrigerator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What referenced standard is used to develop an energy simulation?

A

ASHRAE 90.1-2010

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

When choosing a project site, which of the following would be the best option to develop on?

A

A previously developed site within a brownfield

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What material is assumed to have a minimum post-consumer recycled content when no supporting documentation can be obtained?

A

Steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Achieving which of the following credits or prerequisites would most benefit from the involvement of the facility manager?

A

Advanced Energy Metering

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

A landscape architect would most likely assist in the submittals for which of the following credits? (Select 2)

A

SiteDevelopment - Protect or Restore Habitat Heat Island Reduction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Which of the following could be considered an innovative strategy and could gain Innovation points for a new construction project certification?

A

Green housekeeping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What are strategies to help reduce vehicle miles traveled to and from a project building? (Select 2)

A

Provide a car-share program that allows the occupants to share vehicles Provide preferred parking spaces close to the entrance for carpools or vanpools

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

How much does it cost to register a project for LEED BD+C certification?

A

$900 USGBC silver, gold, or platinum level members / $1,200 others

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

A water efficient strategy to reduce potable water demand for the interior of a building would include (Select 3)

A

Installing aerators into lavatory faucet Using graywater for flush fixtures Implementing low-flow toilets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Which of the following types of products can become Green-e certified?
Renewable Energy
26
What is the legal instrument that regulates current land use?
zoning
27
Which type of product declaration counts a whole product for credit calculation purposes in the MR credit Environmental Product Declaration?
Product-specific Type III EPD
28
Bio-based materials, FSC certified wood, materials reuse, and recycled content are all referenced under which MR credit option?
Leadership Extraction Practices
29
For MR credit calculation purposes, product and material cost includes which of the following? (Select 2)
all taxes delivery costs
30
Analysis of a product's partial life cycle, that omits the use and disposal phases of the product, is called:
Cradle-to-gate
31
A rapidly renewable material is defined as one that:
Has a growth cycle of 10 years or less
32
Using native and adapted plant species can help to achieve which of the following? (Select 3)
Provide benefits for local wildlife Reduce the need for pesticides or fertilizers Reduce the amount of water required for irrigation
33
Environmental Tobacco Smoke Control is concerned mainly with which one of the following?
preventing tobacco smoke from contaminating the air in occupied spaces
34
Why should a green project be located in an existing community?
The connection to diverse uses is present
35
Which of the following is NOT true concerning the use of waste-to-energy as a diversion strategy for Construction and Demolition Waste Management?
The combustion of wood or "wood-derived fuel" is considered waste-to-energy and is included in the referenced criteria
36
Which two of the following is never considered to be a source for graywater? (Select 2)
Urinals Toilets
37
Which of the following has the strongest relationship with local zoning?
Parking capacity
38
A project team is deciding if various innovative strategies are eligible for points in the Innovation category. Which of the following are recommended approaches?
Read the ID credit catalog document.
39
A project team's local jurisdiction enforces an erosion and sedimentation control requirement that is more stringent that the EPA Construction General Permit. What should the project team do?
Comply with the local requirements and include submittals verifying that the requirements are more stringent
40
What are the requirements when submitting a credit for Innovation? (Select 3)
The credit must submit requirements for compliance The credit must have an intent
41
Which of the following is the best definition for zoning?
A legal instrument regulating land use
42
Which is a common problem regarding many traditional zoning ordinances?
They do not address issues related to open space
43
What are some simple strategies to reduce the total energy consumption on a building? (Select 2)
Compressed workweek Telecommuting
44
Which of the following best describes a synergy between SS and EA?
Utilizing a vegetated roof can help cool the building
45
A project team is attempting compliance with the Surrounding Density and Diverse Uses credit. Which of the following strategies could
Locate within 1/2 mile walking distance of at least 10 diverse uses Achieve a minimum density of 60,000 square feet per net acre
46
Which of the following should not be included in the project budget?
Government lobbying fees
47
Which of the following refers to the act of approving a project team's submittals and issuing an award?
certification
48
All of the following are stated characteristics of the LEED rating system, except-(Select 2)
Democratic Academic
49
Each of the following are LEED rating system adaptations except
Multiple Buildings
50
A newly built high-rise residential building has been occupied for two months. Which of the following at this time?LEED rating systems can be attempted
There are no applicable rating systems
51
What statements about the LEED process are true? (Select 2)
No Credits are awarded during the Design Phase Submittal If the execution of a design phase credit changes during construction, it must be resubmitted during the Construction Phase Submittal
52
To achieve LT Credit Sensitive Land Protection, which site CAN a project develop on:
Previously developed site that is 10 feet above the elevations of the 100-year flood as defined by FEMA
53
Which of the following are considered diverse uses for development density and community connectivity: (Select 3)
Fire station Hardware Museum
54
Which of the following is true for Bicycle Storage for LEED?
The number of bike racks required is partially based on peak users
55
What would help encourage the use of green vehicles? (select 2)
Provide discounted parking for green vehicles. Designate parking spaces near the building entrance for green vehicles.
56
Structural controls for erosion and sedimentation control: (Select 2)
Silt fencing Sediment traps
57
Which of the following statements are true of LEED? (Select 3)
All prerequisites are required based on the Rating System Adaptation. LEED Categories differ depending on the Rating System. Credits within each category offer potential project points, which determine the LEED Certification level
58
Which of the following would not help increase the open space on a site?
Plant only native plants.
59
Reducing the amount of light that leaves the project site at night time would result in: (select 2)
Safer migrations for birds More visible stars
60
What is the main standard used to define the baseline per flush and flow rates for the water efficiency of fixtures used in the interior of the building?
Energy Policy Act (EPAct) of 1992
61
Water is periodically discharged from cooling towers as blowdown. Why is this necessary?
To reduce concentrations of dissolved solids
62
Components of the building envelope that would be included in the energy model (select 3)
Roof Windows Spray foam insulation
63
Which of the following statements are true (select 2)
Fundamental Refrigerant Management is most concerned with ozone depletion CFC's are man- made
64
Which of the following is true for projects using both electricity and natural gas energy inputs? (select 2)
Both gas and electric use must be considered when attempting Green Power. The project must purchase green power, carbon offsets, or RECs to earn Green Power
65
How is the total percentage of construction waste diverted from the landfill calculated?
recycled waste ÷ (landfill waste + recycled waste)