Lecture 8 Flashcards

1
Q

Requirements negotiation: ViewPoint + Negotiating

A

Viewpoints: represents different stakeholder requirements

A way of organising and group requirement that have been elicited

Negotiating requirement:

The EasyWinWin method to detect and resolve inconsistencies and conflicts, and reach agreement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Relationship between Negioation requriements + i* Modelling

A
  • Is when stakeholders agree on tasks than the goals

Transforms a goal/soft goal into a task or solution by introducing new means-end links into the SR Model

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Define traceability + Two types of traceability

A

Traceability is needed to allocate and validate responsibility

  1. Pre-requirements: aspects of requirements which arise prior to inclusion of requirements in the specification
  2. Post-requirements tracing: Links the requirements to aspects which arise after inclusion in the specficaiton
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The five basic elements of tools are linked to the basic function of a requirements management tools

A
  1. Requirements gathering
  2. Requirements description
  3. Requirements verification
  4. Requirements management
  5. **Network Facilities **
How well did you know this?
1
Not at all
2
3
4
5
Perfectly