Lecture 7+8 (MIKE URBAN modelling – Tommerup exercise) Flashcards

1
Q

What does 1D modelling mean in MIKE URBAN in terms of velocity?

A

The velocity is calculated in one direction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does sewer separation mean?

A

That you separate an old, underscaled combined network into a two stringed network –> Waste water and stormwater in separate systems.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the function of a stormwater system?

A

It delays and clean the water to protect the recipient.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is an optimal stormwater system?

A

No flooding at a 5 year CDS rain event and no extra volume in pipes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why is it important to have a well descripted MIKE URBAN model?

A

o Calculate optimal pipe dimensions
o Efficient tool if there afterwards are changes in the project:
- What happens if we make this change? Is it possible? Etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a well descripted MIKE URBAN model?

A

o Well defined catchments
o Imperiousness of catchments
o Linking catchments to the right manhole
o Measured data for existing elements: manholes, pipes etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why do we need to decrease overflow to streams/lakes?

A
  • To secure good environmental conditions –> EU Water Frame Directive
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which data are needed for creating a good MIKE URBAN model?

A
  • Input from the utility’s database of their sewer system: manholes, outlets, pipes, pumps, weirs, basins, regulators
    o Estimate missing information
  • Input from the utility’s old drawings of basins, structures, pumps, ect.
  • Catchments: size and imperiousness
    o Input from maps with information of buildings, roads, parking lots, land register (cadastral map)
    o Or maximum allowed imperiousness (determined by the municipality)
  • Waste water input from measured water consumption
  • Analyse system with 1 year rain event: dead ends? Errors?
  • Calibrate model: Compare measured data with calculated data – agreement?
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What can MIKE URBAN model be used for?

A
  • Analyse the sewer network of the city
    o Where are the large “high way” pipes?
    o “Bottlenecks”?
    o Flooding (blue spots)?
  • Input to the sewer renovation plan of the utility
    o How to prioritise the work that needs to be done.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Describe the climate adaptation case in Tommerup.

A

The task of the project:
o Stream is flowing under terrain in pipes through the village
 Needs to fulfil the Water Frame Directive (good environmental condition)

o The utility has to secure the stormwater system to the service demand
 No flooding at a 5 year rain event (the village has a separated sewer system)

o The municipality has to reduce the risk of flooding under cloudburst.

o Create common solutions on terrain
 Drainage function
 Increase nature elements
 Recreational values

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What was the solutions for the climate adaptation case in Tommerup?

A

o Reopening the stream

o Detention of water in the upstream stormwater system: Basins, ditches, soakaways
 Bigger pipes as last solutions

o Redirection of the stormwater – cut off from main system to separate outlet

o More stormwater outlets to the stream with a low discharge than few outlets with high discharge – reduce the risk of erosion

o Stormwater basins before discharge to the stream
 Detention and cleaning of stormwater

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What was assignment 7 about (Tommerup exercise)?

A

We got the model used for Tommerup in the climate adaptation case and then we needed to edit the model with solutions, that could prevent flooding at a 5-year rain event by using elements on terrain.
These elements could be:
o Insert basins with regulation – detention water in the upstream system
o Redirect the stormwater - cut off from main system to separate outlet (new pipes necessary)
o Bigger pipes as last solution
o Basin before outlet to stream.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How did our solution looks like for the assignment?

A

We made a simulation on the existing model to see where the floodings would be placed. Then we tried to incorporate a basin in between some of the pipes and then drain the water to a near stream.