Lecture 2 Flashcards
Original design
Involves a new working principle
Involves consideration of all solutions and method of choosing between
New materials can offer properties which enable the design
Can demand the development of new/improved materials or process route
Adaptive or developmental design
Slight advance in performance via refinement in working principle
Made possible through advances in materials
Variant design
Change of scale or dimension with changing the function or method
May involve changes in materials
Technical Systems
Consists of assemblies, which consists of components, each component (materials selection) is made up of a different material
Design Process
Market need | Concept | Embodiment | Detail | Product
Conceptual design
- All options are open and designer considers
- -> alternate working principles for the functions
- -> ways in which subfunctions are combined or separated
- -> implications of each scheme for cost and performance
- Approximate material property data needed
Embodiment design
Starts with a function structure
Analyses its operation at an approximate level
Detailed design
- Specifications for each component are drawn up
- Components may be subjected to precise mechanical or thermal analysis
- Optimisation methods are applied to components to maximise performance
- Design costed
- Materials and productions routes are chosen
Function, material, shape, process
Function dictates choice of material
Shape is chosen to perform the function using the material
Process is influenced by material properties
Process interacts with shape
Shape and process restricts choice of materials
Material Requirements of a beverage container
Rigid, Non-permeable, Strong, Low density, Resistant to chemical attack, Cheap
Material Requirements of a bridge
Strength, Cost, Stiffness, Environment, Form (material can be produced in sufficient lengths to span the gap of the bridge), Longevity
Material selection dependancy
- Requirements imposed by service conditions
- Requirements imposed by the proposed manufacturing route
- Cost