lecture 10 (1) Flashcards

1
Q

ENVIRONMENTAL MANAGEMENT PLAN

A
  • The Environment Management Plan (EMP) consist of all mitigation measures for each component of
    the environment due to the activities increased during the operational phase of the project and these
    are discussed in later subsections.
  • Prepared in accordance with the rules and requirements of the Ministry of Environment, Forest,
    and Climate change (MoEF&CC) and CPCB
  • To ensure that the component of facilities are operated in accordance with the design
  • A process that confirms proper operation through supervision and monitoring
  • A system that addresses public complaints during operation of the facilities and
  • A plan that ensures remedial measures is implemented immediately
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

EMP FOR AIR ENVIRONMENT DURING OPERATION PHASE:

A

To mitigate the impacts of pollutants from DG sets and vehicular traffic during the operational phase of
the project, following measures are recommended for implementation:
* Diesel Generator Set Emission Control Measures
* Vehicle Emission Controls and Alternatives
* Greenbelt Development

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Diesel Generator Set Emission Control Measures

EMP FOR AIR ENVIRONMENT DURING OPERATION PHASE

A

Adequate stack height has been maintained to disperse the air pollutants generated from the
operation of DG sets to dilute the pollutants concentration within the immediate vicinity. Hence, no
additional emission control measures have been suggested.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Vehicle Emission Controls and Alternatives

EMP FOR AIR ENVIRONMENT DURING OPERATION PHASE

A

Footpaths and Pedestrian ways: Adequate footpaths and pedestrian ways have been provided within
the project to encourage non-polluting methods of transportation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Greenbelt Development

EMP FOR AIR ENVIRONMENT DURING OPERATION PHASE

A

Increased vegetation in the form of greenbelt is one of the preferred methods to mitigate air and
noise pollution. Plants serve as a sink for pollutants, act as a barrier to break the wind speed as well
as allow the dust and other particulates to settle on the leaves. It also helps to reduce the noise level
at large extent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

EMP FOR NOISE ENVIRONMENT DURING OPERATION PHASE:

A

To mitigate the impacts of noise from diesel generator(DG) sets during operational phase, the following
measures are recommended:
* Adoption of Noise emission control technologies
* Greenbelt development

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Noise Emission Control Technologies

EMP FOR NOISE ENVIRONMENT DURING OPERATION PHASE:

A
  • Silent DG sets are being used. Further, it is ensured that noise is at a permissible limit for persons of
    the site and surrounding receptors
  • Improvement of the current ecology of the project site entails the following measures:
    ✔ Plantation and Landscaping
    ✔ Green Belt Development
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Plantation and landscaping

EMP FOR NOISE ENVIRONMENT DURING OPERATION PHASE:

A

Selection of the plant species has been done on the basis of their adaptability to the existing geographical
conditions and the vegetation composition of the forest type of the region earlier found or currently
observed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Green Area Development Plan

EMP FOR NOISE ENVIRONMENT DURING OPERATION PHASE:

A
  • The plantation matrix adopted for the green belt development includes pit of 0.3 m × 0.3 m size with a
    spacing of 2 m x 2 m.
  • In addition, earth filling and manure is required for the proper nutritional balance and nourishment of the
    sapling.
  • It is also recommended that the plantation has to be taken up randomly and the landscaping aspects could
    be taken into consideration.
  • Plantation comprising of medium height trees (7 m to 10 m) and shrubs (5 m height) are for the green belt.
  • In addition, creepers have been planted along the boundary wall to enhance its insulation capacity
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Parks and Avenue Plantation

EMP FOR NOISE ENVIRONMENT DURING OPERATION PHASE:

A
  • Parks and gardens maintained for recreational and ornamental purposes not only improve the
    quality of existing ecology at the project but also will improve the aesthetic value.
  • Avenue Plantation
    1. Trees with colonial canopy with attractive flowering
    2. Trees with branching at 7 feet and above
    3. Trees with medium spreading branches to avoid obstruction to the traffic
    4. Fruit trees to be avoided because children may obstruct traffic and general movement of public
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A

The social management plan has been designed to take proactive steps and adopt best practices,
which are sensitive to the socio-cultural setting of the region. The Social Management Plan focuses
on the following components:
* Income Generation Opportunity during Operation Phase
* Improved Working Environment for Employees & Students
* Awareness and Training:
* Person and Contractors:
* Environmental Audits and Corrective Action Plans:

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Income Generation Opportunity during Operation Phase

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A
  • The project provides health care services, educational facility & employment opportunity during
    operation phase. There would also be a wide economic impact in terms of generating opportunities
    for secondary occupation within and around the complex. The main principles considered for
    employment and income generation opportunities are outlined below:
  • Employment strategy provide for preferential employment of local people
  • Conditions of employment would address issues like minimum wages and medical care for the
    workers. Contractors would be required to abide to employment priority towards locals and abide by
    the labor laws regarding standards on employee terms and conditions.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Improved Working Environment for Employees & Students

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A

The project would provide safe and improved working conditions for the workers employed at the
facility during operation phase. With the ambience and facilities provided, the complex provides a new
experience in living and recreations. Following measures have been taken to improve the working
environment of the area:
* Better educational facility to the students.
* Better health care facility to the patients.
* Less use of chemicals and biological agents with hazard potential.
* Developing a proper interface between the work and the human resource through a system of skill
improvement
* Provision of facilities for nature care and recreation e.g. indoor games facilities
* Measures to reduce the incidence of work related injuries, fatalities and diseases
* Maintenance and beautifications of the complex and the surrounding road.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Awareness and Training:

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A

Training and human resource development is an important link to achieve sustainable operation of the
facility and environment management. For successful functioning of the project, relevant EMP would
be communicated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Person and Contractors:

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A

Persons are made aware of the importance of waste segregation and disposal, water and energy
conservation. The awareness is provided by periodic Integrated Society meetings. They would be
informed of their duties.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Environmental Audits and Corrective Action Plans:

EMP FOR SOCIO-ECONOMIC ENVIRONMENT:

A

To assess whether the implemented EMP is adequate, periodic environmental audits are conducted by
the project proponent’s Environmental division. These audits will be followed by Correction Action Plan
(CAP) to correct various issues identified during the audits

17
Q

ENVIRONMENTAL MONITORING

A
  • The purpose of environmental monitoring is to evaluate the effectiveness of implementation of
    Environmental Management Plan (EMP) by periodic monitoring.
  • The important environmental parameters within the impact area are selected so that any adverse
    affects are detected and time action can be taken.
  • The project proponent gets ambient air Quality, Ground Water Quality and Quantity, and Soil Quality monitored in accordance with an approved monitoring schedule.