Lecture 1: Introduction Flashcards
What is a Brownfield?
- Often vacant, key points: previous contamination and env tresspass
- Often oil and gas
- Usually former industrial lands that are now vacant or underused …but have the potential to be redeveloped or intensified …may be contaminated due to past or present activities (e.g., closed factories, gas stations)
Why would brownfield be an env concern?
- Key: env trespass
- Fields can cause concerns to env and human health due to contaminants that are in soil and groundwater
Why redevelop brownfields?
- Toronto’s incentive to go up than out
- It can be to reused: -for land, urban development, or protect green spaces It improves air, water, soil quality It can be financial incentives
When does brownfields legislation apply?
-
- 04 first year it was passed
- Depends on definitions in OReg 153/04 and Part XV.1 of Env Protection Act… this decides when RSC is required Generally RSC must be filed when property use from less sensitive -> more sensitive
RSC needed? Yes/No
- Old residential –> new condo
- Condos already built on either side of new road
- Community housing –> park
- Community house –> road
- No (no change in landuse)
- Yes, only needed for new road
- Yes (will be conveyed to city)
- Yes
History of OReg 153/04
1989- Guidelines issued for decommissioning and clean up of sites in ON 1993-Guidelines issued for assessing and managing petroleum contaminated sites in ON 1996-Guidelines issued for use at contaminated sites in ON, and continuously revised
History: more specifically, Cleanup Guidelines of 1996
-Revised guidelines for when property owners are cleaning or developing contaminated sites -MOE prepared 3 accompanying docs that gave property owners and consultants detailed info on parts of guidelines (i.e.., guidelines on SAMPLING, RISK ASSESSMENT, and rational for developing soil, sees, and gwater criteria) -It WASN’T a regulation and didn’t change regulatory role of MOE, but really gave owners and consultants options when restoring a site (aka general approaches like remediation, or RA, or RSC)
History: updates post 2000
2001- legislation regarding brownfields was established through Bfields Law Amendement Act 2004- OReg 153/04 RSC becomes law (it set requirements for conducting site assessments, defined QP, and their jobs) 2007-Budget Bill = reform of law, updates OReg 153/04 2009-amendments to OReg now filed as OReg 511/09 2011-all amendments came into effect July 1st
What did amendments in OReg 511/09 include?
-Enhanced RSC integrity (more transparent, efficient, and new ESA requirements, including new PSI and PSII requirements) -RA streamlined process -Strengthened standards (enhanced env protection ) -Implementation and Transition to assure smooth crossover
Definition: Env Site Assessment
-Investigation relation to land to determine env condition of property …includes phase I and II …purpose is to identify potential or existing env contamination
Definition: Phase I ESA
- Determines if evidence of potentially contminating activities (PCA) or areas of potential env concern (APEC) exist in connection with the Site ….could be present from current or past activities on site or from neighbouring properties within Study Area -Is NOT intrusive (no sampling, air testing, soil, water, building materials)
- includes directories, addresses, fire insurance plans
Definition: Potentially Contaminating Activities (PCA)
-Refers to use of activity in Column A or Table 2 of Schedule D (59 PCAs) that is occurring or has occurred in the study area
Name 5 PCAs from Table 2, Schedule D (out of 59)
-Boat manufacturing -Commercial Autobody Shops -Crude Oil Refining -Cosmetics Manufacturing, Processing, and Bulk Storage -Explosives and Firing Range -Fire Training -Glass Manufacturing -Metal Fabrication -Oil Production -Operating Dry Cleaning Equipment -Pharmaceutical Manufacturing and Processing -Plastics Manufacturing -Rail Yards, Trucks, and Spurs -Rubber Manufacturing -Salt Manufacturing -Textile Manufacturing -Sewage Treatment =>10,000 L per day -Soap and Detergent Manufacturing ….etc.
Definition: Phase II ESA
-Determines if CoC exist as result of current or past activities on or adjacent to site within area -Is INTRUSIVE, including sampling air testing, soil, sed, surface and gdwater testing
Definition: Contaminant
-S, L, G, odour, heat, sound, vibration, radiation, or combination resulting direct or indirect from human activity that causes or MAY cause adverse effect