Preliminary planning for a food service design project includes:
Studying the current trends, innovation in equipment, regulatory codes and licensing requirements needed.
First step in facility design project:
Prospectus: written description of all aspects of project under consideration
How is menu, equipment and space interconnected
Menu is the key to equipment needs which in turn determines the space needed for equipment
First step in design development:
Determine the space allowance and draw a flow diagram showing location of work unit
What are the major work areas in foodservice dept?
Receiving, storage and issuing, preparation, serving and washing
Factors to be considered when selecting an equipment
Need, the cost, functional attributes, sanitation and safety, appearance and design and overall performance
Cost of equipment: if calculated profit is more than 1, 1.5 or less than 1- what does it all mean
E >= 1: advisable to purchase
E>=1.5: highly desirable
E< 1: not desirable
What is the life expectancy of most common foodservice equipments?
9-15 years
In functional attributes, what are the 2 things to be considered
- Maximum function compared to cost
- Possibility to modify the equipment and accept attachments
What are the preparation equipments
Food cutters, food slicers, blenders and mixers, peelers
Most important consideration when buying equipment
Horsepower of the motor
In a conventional oven, how is heat distributed?
Thru conduction
What is the formula for required number of ovens in a food service firm?
Required number of ovens= no. Of serving / (no of serving per pan x no of pan per oven x no of batches per hour)
In infrared ovens, how is food introduced and removed?
Conveyor belt
Advantages in terms of time and temp for infrared ovens
Less time and high temp provides even cook