learn Flashcards

1
Q

how long should the 800 Gpm engine Idle before you pull the stop switch

A

1 minute

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3 types of pump stations

A

Booster, Mainline,and Flood/transfer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

the line strainer should be changed when the pressure diiferiantial reading increases by How many psi?

A

5 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

characteristics of the flood and transfer hose line pump

A

600 GPM / 150 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

the fist step to operating an 800 GPM pump

A

PMCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

after the scrapper enters the reciever barrel, what should you do first

A

open the bypass valve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

what is flow idle RPM of the 800 GPM pump

A

500 to 1000 RPM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long should you engage the 600 GPM pump starter switch each time to prevent
electrical damage

A

10 sec

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During ____ pump arrangement fuel first flows.. One pump and then into the next

A

Series

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What indicated that the scrapper has entered the receiver barrel

A

The flag indicator pops up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The 800 GPM pump low suction pressure (shut down) is set

A

9 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A scrappers speed should not be allowed to fall below

A

2 mph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the types of scraper

A

Polly pig and brush

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When pumps receive fuel directly from the line at the same time, they are arranged in
which of the following

A

Parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The 800 RPM pump engine over speed is set at

A

2300 RPM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

. What is the first step when putting pumps on line

A

perform before operations (pmcs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the acronym GLUV performed

A

During operation maintenance (PMCS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

. During shutdown procedures the 600 GPM pump engine should be allowed to idle for

A

30 secs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What determines the size scrapper you should use

A

The size of the pipeline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Brush scrapers cannot be used on sections of pipe that have corners/ bends of more than

A

30 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What is the first thing you should do if the strainer gets stuck in the pipeline

A

Increase the full line pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the first step when taking pumps off line

A

Reduce pump pressure to the idle speed for the required time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the types of pump arrangements?

A

Series and parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Which of the following is positioned at an angle up to 5 degrees from the

A

800 GPM pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

. What type of pump is the 600 GPM

A

Flood and transfer/ hose

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

The 800 GPM pump engine over speed is set at

A

2300 RPM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

What are the 3 types of pump stations

A

Booster, mainline, flood/ transfer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

What indicated that the scraper has entered the receiver barrel

A

The flag indicator pops up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

During the start up of the 600 GPM pump the oil bypass switch is engaged until the oil
pressure reaches

A

40 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What is/ should be the first step when taking the pumps offline

A

Reduce the pump pressure to idle speed

31
Q

During pump operations if the fuel flows into one pump and then the other it is arranged
in a

A

Series

32
Q

A brush scraper cannot be utilized in a section of pipe that have/has corners or bends of
more than

A

30 degrees

33
Q

During setup of pump stations the 800 GPM pump can be positioned at any angle up to

A

5 degrees

34
Q

The 800 GPM pump low suction is

A

9 PSI

35
Q

What are two types of scrapers

A

Polly pig and brush

36
Q

When is the acronym GLUV performed

A

During operations

37
Q

. Before operating the 600 GPM what actions are taken

A

PMCS

38
Q

During shutdown procedures on the 800 GPM pump how long should the engine idle
before you pull the stop switch

A

1 min

39
Q

During the start up procedures, the 800 GPM pump should be idled until

A

120 degree is reached

40
Q

. During pump operations the scrapper becomes stuck in the pipelines what should you do

A

Increase the fuel flow pressure

41
Q

After the scraper enters the receiver barrel, what is the first thing you should do

A

Open the bypass valve

42
Q

During the startup of the 600 GPM pump how long should you engage the starter switch
each time to prevent electrical damage

A

10 sec

43
Q

What determines the scraper size used

A

The size of the pipeline

44
Q

Which of the following is not one of the safety considerations for the 800 GPM pump

A

Ensure the pump has warmed up for 3-5 min

45
Q

The 600 GPM pump is a

A

hoseline/ flood & transfer

46
Q

During shutdown procedures the 600 GPM pump should be idle for at least

A

30 sec

47
Q

During pump operation the pump receives fuel directly from the line at the same time it is
engaged in a

A

Parallel

48
Q

The pump primarily utilized with the TPT is a single stage centrifugal pump it has a

A

600 GPM & an operational output at 150 PSI

49
Q

Which of the following is a characteristic of the 600 GPM hose line pump?

A

Single stage, centrifugal pump

50
Q

SPC Smith properly set the scraper indicator after launching a poly pig from pump station
2. Who should he/ she notify?

A

The chief dispatcher

51
Q

What are two methods to monitor the location of a scraper during a pipeline?

A

Listening and measuring

52
Q

Before starting the 800 GPM pump should conduct the following

A

PMCS

53
Q

The 600 GPM pump is equipped with a mode select switch located on the left side of the
left control panel. Always select ____ mode when starting the engine.

A

Manual

54
Q

Why are strainer assemblies installed in pump stations, upstream of the pumps?

A

To protect them from damage due to dirt or debris in the pipeline

55
Q

Which of the following is a characteristic of the 800 GPM mainline pump

A

A 3 stage centrifugal pump

56
Q

The ____ is one of the major components of the 800 GPM pump and is used to connect
the speed increaser to the pump

A

Flexible coupling

57
Q

Have a mission to position an 800 GPM pump within a 5 degrees horizontal using its
lifting bail assembly it should be connected to ____ on the skid

A

4 locations

58
Q

. The 800 GPM can be classified as a

A

Hose line pump

59
Q

To calculate the total volume needed to move the scraper between the launcher and
receiver

A

8, 185 gallons

60
Q

Air should be bled at least ____ and repeated every 15 min. If there is a lot of air in the
line until no air is observed

A

Every hour

61
Q

Additionally the pump is equipped with four safety shutdown devices. What type of
pump is he referring to?

A

800 GPM mainline pump

62
Q

The 600 GPM pump, suction gage which shows a Vacuum. But the pump did not prime
after 5 min. What action is required?

A

Stop engine and check for leaks

63
Q

The dispatcher informed you that it’s safe to shut your 800 GPM pump down- turn the
engine discharge pressure control fully _____ to idle position

A

Counterclockwise

64
Q

What is the purpose of the 600 GPM pumps air eliminator valve

A

Removes air and maintains an air free system throughout the operations

65
Q

You should not inject starting aid more than __ with engine stopped

A

2 twice

66
Q

What device is mounted on strainers that will indicate a possible fuel blockage issue
during operations

A

Pressure differential gage

67
Q

800 GPM pump > how many hrs can the continuously operate the pump before the 110
gallon tank require refueling

A

4 hours

68
Q

When you open a strainer for further inspection. What tool is available on the strainer to
assist with this task

A

Come a long bolt

69
Q

What effect would using the light fuel provide

A

debris will settle out faster in a light fuel

70
Q

. __ fuel is pumped when a series arrangement is used instead of a parallel setup

A

Less

71
Q

. The scrapper can probably be freed by increasing the pressure in the line. What care
should be taken when increasing the pressure

A

Avoid over pressurize the line

72
Q

. ___ stations are sometimes used to push fuel unloaded from a tanker or barwe through
the line to base terminal storage

A

Booster pump

73
Q

Always ensure you have launching instructions from the dispatcher and set the scraper
indicator ____ before the scraper departs his station

A

red flag in the down position