L7 Biorisk Management Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

Is the risk associated to biological toxins or infectious agents

A

Biorisk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Is the integration of biosafety and biosecurity to manage risks when working with biological toxins and infectious agents

A

Biorisk management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The three components of Biorisk Management

A

Assessment
Mitigation
Performance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Includes the identification of Hazard and characterization of risks that are possibly present in the laboratory

A

Risk Assessment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Refers to anything in the environment that has the potential to cause harm

A

Hazard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Is generally defined as the possibility that something bad or unpleasant (such as an injury or loss) will happen

A

Risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The risk assessment team must identify the hazards and risks of the biological agents to be handled

A

Define the situation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Defining the risks must include a review of how individuals inside and outside the laboratory may be exposed to the hazards

A

Define the risks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

To characterize the overall biosafety risks, the risk assessment team needs to compare the likelihood and the consequences of infection either qualitatively or quantitatively

A

Characterize the risks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

This process of evaluating the biorisk studying from a biohazards takes into account the adequacy of any existing controls and deciding whether or not the biorisk is acceptable

A

Determine if the risks are acceptable or not

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The second fundamental component of the biorisk management model is?

A

Mitigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Measures are actions and control measures that are put into place to reduce or eliminate the risks

A

Biorisk mitigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The most difficult and most effective control measure, involves the total decision not to work with a specific biological agent or even not doing intended work

A

Elimination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The second control measure, is the replacement of the procedures or biological agent with a similar entity in order to reduce the risks

A

Substitution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The third control measure. It includes physical changes in work stations, equipment, production facilities, or any other relevant aspect of the work environment that can reduce or prevent exposure to hazards

A

Engineering controls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The fourth measure which refers to the policies, standards, and guidelines used to control risk

A

Administrative controls

17
Q

It is the last mitigation control. These are the devices worn by workers to protect them against chemicals, toxins, and pathigenic hazards in the laboratory

A

Personal Protective Equipment (PPE)

18
Q

The hierarchy of controls of mitigation measures (from most difficult/most effective to the easiest to implement/least effective)

A

Elimination
Substitution
Engineering Controls
Administrative Controls
Personal Protective Equipment (PPE)

19
Q

Examples of PPE

A

Gloves
Gowns
Respirators

20
Q

The last pillar of the biorisk management model

A

Performance Evaluation

21
Q

Involves a systematic procces intended to achieve organizational objectives and goals

A

Performance Evaluation

22
Q

Is simply a reevaluation of the overall mitigation strategy

A

Performance management