What is grid integration?
A) Installing renewable energy systems directly in rural areas
B) Delivering high penetration levels of renewable energy into an established grid
C) Combining fossil fuels with renewables in power plants
D) Isolating renewable systems from traditional grids
[L12]
B) Delivering high penetration levels of renewable energy into an established grid
[L12]
ENGY-775
True or False: Clean power is characterized by voltage variations, low power factor, and power surges.
[L12]
False
[L12]
ENGY-775
Fill in the blank: A ________ is an uninterruptible power supply designed to provide steady, consistent voltage to critical systems.
[L12]
UPS
[L12]
ENGY-775
Which of the following is NOT a pressure driving the transition to renewable energy?
A) Reducing greenhouse gas emissions
B) Addressing finite fossil fuel reserves
C) Increasing nuclear dependency
D) Avoiding local air pollution
[L12]
C) Increasing nuclear dependency
[L12]
ENGY-775
True or False: Oil and gas reserves are expected to last for another 150 years based on current demand.
[L12]
False
[L12]
ENGY-775
Fill in the blank: In 2014, approximately ________ people lacked access to reliable electric power globally.
[L12]
1 Billion
[L12]
ENGY-775
What is a proposed large-scale solution for integrating renewable power into the grid?
A) Maintaining expensive reserve power plants
B) Increasing grid flexibility
C) Removing wind and solar as reserve options
D) Reducing voltage control
[L12]
B) Increasing grid flexibility
[L12]
ENGY-775
True or False: Additional reserve plants are always required for future integrated grids.
[L12]
False
[L12]
ENGY-775
Fill in the blank: Energy storage systems must provide ________ energy reserves to meet demand in seconds to minutes.
[L12]
operating
[L12]
ENGY-775
What does LCOE represent?
A) The total energy capacity of a plant
B) Average revenue per unit of electricity needed to recover costs
C) Capital investment cost divided by the output
D) Total cost of avoided carbon emissions
[L12]
B) Average revenue per unit of electricity needed to recover costs
[L12]
ENGY-775
True or False: Avoided costs in energy production are always higher than LCOE.
[L12]
False
[L12]
ENGY-775
Fill in the blank: The capital cost for offshore wind power plants is approximately ________ per kW.
[L12]
$6,500
[L12]
ENGY-775
What is Denmark’s goal for energy independence?
A) Eliminating energy imports by 2030
B) Achieving carbon neutrality by 2040
C) Doubling fossil fuel imports for energy security
D) Using only solar energy for power
[L12]
A) Eliminating energy imports by 2030
[L12]
ENGY-775
True or False: Denmark shifted to renewables due to reliance on foreign energy imports and rising fuel prices in the 1970s.
[L12]
True
[L12]
ENGY-775
Fill in the blank: The 2015 United Nations Paris Agreement aimed to limit global temperature rise to ________ degrees Celsius by 2060.
[L12]
2
[L12]