JI - Amentum Flashcards
Prior to becoming JI qualified, personnel selected to perform as joint inspectors must…..
Possess awarded 5 skill level or above (or civilian equivalent)
The _________________ will provide electronic manifests or request manifest/ITV support through USTRANSCOM
Deploying unit
The _____________ will appoint Joint Inspectors in writing.
Unit Commander
The _______________ will validate load plans and passenger/ cargo manifests
Mobility Force
The _______________ certifies hazardous cargo for shipment.
Deploying unit
The maximum pallet gross weight in pallet position 5 for the C130 aircraft is………
8500 lbs
The maximum pallet gross weight in pallet position 6 for the C130 aircraft is………
4664 lbs
The first step in preparing for a joint inspection is to……….
Establish contact with the user
All pallets loaded on the forward and aft ramps of the C5 must have a __________on the outboard edge of each pallet.
14-inch aisle way.
The _____________ is responsible for the Ready Line/Loading ramp area.
Mobility Force
During an installation deployment, __________________________ acts as the focal point for monitoring all cargo processing activities such as receiving, marshalling, joint inspecting, and loading cargo aboard aircraft.
Cargo Deployment Function (CDF)
________________ provides basic requirements for the Air Force deployment planning and execution at all levels of command to support contingency operations.
AFI 10-403
________________ is the ACL for the C17.
130,000 lbs
The __________________ is the form used to inspect hazardous materials.
AMC Form 1015
________________ in the AFMAN 24-604 covers inspection procedures of hazardous materials.
Attachment 28
___________________ in the AFMAN 24-604 covers marking hazardous materials
Attachment 14
When moving under the authority of _____________, the _____________ is responsible for providing ___ shippers declaration of dangerous goods.
Chapter 3, deploying unit, 2
Vehicles and self propelled units may contain fuel in tank not to exceed ______ when transported on the main deck under the authority of Chapter 3
3/4 tank
The _____________________ justifies and requests chapter 3 authorization for USTRANSCOM.
Deploying Units MAJCOM
_____________________ in the AFMAN 24-604 covers certifying hazardous materials
Attachment 17
Under chapter 3 , a wheeled engine powered support equipment system can contain ________________
1/2 tank of fuel
The _________________ is responsible for providing shoring.
Deploying Unit
____________ shoring is used in conjunction with _________ shoring
Parking, Rolling
_________ shoring prevents a vehicle form bouncing.
Sleeper