Is it Part 1, 2, or 3? Flashcards
Under the Three-Part SectionFormat, schedules for painting, finish hardware, equipment, and lighting fixtures, belong in:
A. Part 1.
B. Part 2.
C. Part 3.
D. Part 1 & Part 3.
- Under the Three-Part SectionFormat, schedules for painting, finish hardware, equipment, and lighting fixtures, belong in:*
- A. Part 1.*
- B. Part 2.*
- C. Part 3.*
- D. Part 1 & Part 3.*
Answer: C. Part 3.
Feedback
When placed into a specification section, schedules are included at the end of Part 3 - Execution. For convenience schedules can be included in the specifications or the drawings.
Part 1-General and Part 2 Products are not where schedules would be found in a CSI 3 Part Specification.
Ref. 2nd Ed. PDPG - Fig. 11.3
Which of the following groups of Article Headings would occur in Part 2 of the Three-Part SectionFormat?
A. Existing products, components and source quality control.
B. Manufacturer, quality assurance and construction.
C. Manufactured units, warranty and system description requirements.
D. All of the above.
- Which of the following groups of Article Headings would occur in Part 2 of the Three-Part SectionFormat?*
- A. Existing products, components and source quality control.*
- B. Manufacturer, quality assurance and construction.*
- C. Manufactured units, warranty and system description requirements.*
- D. All of the above.*
Answer: A. Existing products, components and source quality control.
Feedback
Part 2-Products of a MasterFormat specification will include articles related to the manufacturing and fabrication of products. This includes, New Products, Existing Products and Source Quality Control.
Several of these articles specifically address “Quality Control”:
- Assembly or Fabrications Tolerances;
- Source Quality Control;
- Tests;
- Inspections;
- Non-conforming work; and
- Manufacturing services.
Ref. PDPG 2nd Ed. Fig. 11.13
Within SectionFormat the statement “Store Roofing Rolls on end; not horizontally” - if appropriate would be included in:
A. PART 1
B. PART 2
C. PART 3
D. Either PART 1, PART 2, or PART 3
- Within SectionFormat the statement “Store Roofing Rolls on end; not horizontally” - if appropriate would be included in:*
- A. PART 1*
- B. PART 2*
- C. PART 3*
- D. Either PART 1, PART 2, or PART 3*
Answer: A. PART 1
Part 1 General: under Delivery, Storage, and Handling
All of the following could be Articles in PART 1 - GENERAL of a specification except which one?
A. References
B. Action Submittals
C. Source Quality Control
D. Measurement and Payment
- All of the following could be Articles in PART 1 - GENERAL of a specification except which one?*
- A. References*
- B. Action Submittals*
- C. Source Quality Control*
- D. Measurement and Payment*
C. Source Quality Control
Feedback
Source Quality Control will be located in PART 2; note that Source Quality Control Submittals would be located in PART-!, the key word here is “Submittals”. Make sure you note this difference.
Ref. PDPG- Fig. 11.13-Section Format Outline
Which of the following groups of Article Headings would occur in Part 1 of the Three-Part SectionFormat?
A. Fabrication, quality assurance, and references.
B. References, submittals, and field quality control.
C. References, submittals, and quality assurance.
D. Warranties, allowances, and schedules.
- Which of the following groups of Article Headings would occur in Part 1 of the Three-Part SectionFormat?*
- A. Fabrication, quality assurance, and references.*
- B. References, submittals, and field quality control.*
- C. References, submittals, and quality assurance.*
- D. Warranties, allowances, and schedules.*
C. References, submittals, and quality assurance.
Feedback
Part 1- “General” of a specification includes articles on administrative matters.
Three articles that deal specifically with Quality Assurance are “Administrative Requirements”, “Submittals”, and “Quality Assurance”.
Quality Assurance is a method of avoidance of problems, where Quality Control is checking completed work.
Under SectionFormat, schedules such as painting or hardware belong in:
A. Part 1 - General.
B. Part 2 - Products.
C. Part 3 - Execution.
D. on the drawings.
- Under SectionFormat, schedules such as painting or hardware belong in:*
- A. Part 1 - General.*
- B. Part 2 - Products.*
- C. Part 3 - Execution.*
- D. on the drawings.*
C. Part 3 - Execution.
Feedback
When placed into a specification section, schedules are included at the end of Part 3 - Execution. For convenience schedules can be included in the specifications or the drawings.
Ref. PDPG - 11.2.9.3
From SectionFormat
Include schedules that indicate item/element/product/ equipment and their location. Provide other coordinating data. Schedules are sometimes placed here in the specification section, rather than on the drawings. Schedules technically are not part of PART 3 EXECUTION but can be placed at this location for convenience.
From internet
hardware schedule. A table indicating precise types of hardware (such as hinges, hooks, closers, etc.) required for doors, windows, cabinets, and other features.
Door Schedule (Example)
Part 3: Execution “This is where you get down to the nitty-gritty of how you want all the hardware installed.”
Part 3 must-includes:
- Examination for adverse conditions
- Installation of hardware
- Field quality control post installation
- Plans for adjusting, cleaning and protection
Requirements for elevator field testing procedures can be found in the elevator specification section:
A. In Part 1, under Quality Assurance.
B. In Part 1, under System Startup.
C. In Part 2, under Verification of Performance.
D. In Part 3, under Field Quality Control.
- Requirements for elevator field testing procedures can be found in the elevator specification section:*
- A. In Part 1, under Quality Assurance.*
- B. In Part 1, under System Startup.*
- C. In Part 2, under Verification of Performance.*
- D. In Part 3, under Field Quality Control.*
D. PDPG 11.3.8.5, (271) & Fig. 11.13
Example: SECTION 14240 - HYDRAULIC ELEVATORS
https://www.emich.edu/physplant/vendor/division_14_hydraulic_elevator_standard.pdf