INTERFER Flashcards

1
Q

QUAND?

A
  • FEU OU EXPLOSION MÉTRO VAL TRAIN RER TRAM EN ESPACE CLOS

- ACCIDENT DE CHEMIN FER EN GARE STATION INTER GARE OU INTER STATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

MODULES

A

SAV: 2 EP DONT UN CCGI ET CC SI MÉTRO
1 VSAV
1 AR

INC: 3 EP DONT 2 F CC SI MÉTRO
1 CRAC
1 CD
1 GELD

CDT: 2 OGC
1 OSG
1 PC TACT NIVEAU 2 ET UN VSTI

GARE ENCADRANTE: 2 EP DONT UN CCGI CC SI MÉTRO
1 OGC
1 AR
1 CD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

RÔLE ET MATÉRIEL EP SAP

A

MATÉRIEL EP ;
CA: BASE +BALISAGE

 1 ÈRE ÉQUIPE; 2 *45/20 + LANCE 1*70/20 + UNE DIVISION ET MANCHONS SI CH OU CS

  2 EME ÉQUIPE:  SAV SUR LES VOIES (SACS+PLAN DUR +CC SI MÉTRO)

MATÉRIEL VSAV: CASQUE + CEINTURON
SAV + PLAN DUR

RÔLES 1 EP:  
    CA: 
-RENSEIGNEMENT AU CENTRE DE SURVEILLANCE SUR : NATURE ,CHEMINEMENTS,MISE EN SÉCURITÉ DU SITE, LIAISONS.
-REJOINTS LES LIEUX DU SINISTRE
-MESURES DE SÉCURITÉ
-EXTRACTIONS ET PROMPTS SECOURS
1 EQ:
  • DÉPOSE MATÉRIEL INC AU CENTRE SURVEILLANCE
  • BALISAGE ACCÈS ENGINS PCA_PCP
  • RENSEIGNE ORDRE ARRIVÉE ENGINS2 EQ/ 1 ET 2 EQ DE L EP 2
    GESTES DE SECOURS ET EXTRACTIONSCOND; ALIMENTE COLONNE SÈCHE AIDE DES AUTRES COND
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

RÔLES ET MATÉRIELS INC

A

EP:
CA: BASE + BALISAGE
1 ERE EQUIPE: 2 *70/20 ET MANCHONS SI CH
2 EME EQUIPE: BASE + SAV COMPLET

EP ATTAQUE:
DÉPOSE MATÉRIEL AU PCP
PRENDS MATÉRIEL LAISSE PAR LES 2 PREMIERS EP + ETABLISSEMENTS ATTAQUE

EP MANŒUVRE:
MATÉRIEL EP
ÉTABLISSEMENT DE MANŒUVRE
UNE FOIS EFFECTUE RENFORCENT ATTAQUE DES ÉQUIPES

EP CONTRÔLE DE ZONES :

  • COMPLÈTES BALISAGES
  • ITINÉRAIRE LE MIEUX ADAPTES POUR 2 EME ECHELON
  • ITINERAIRE EVACUATION DES BLESSES DU PMA VERS SECOURS MEDICAUX
  • CONTROLE TOUT LES MOYENS DE LIASONS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly