Interfaces Flashcards

1
Q

I_SC022

A

Material master info is sent from SAP to Shop Floor System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

I_SC015

A

Released process orders are sent from SAP to Shop Floor System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

I_SC018

A

Shop Floor System sends details of materials produced and consumed to SAP.
Material is received or issued on the proper process order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

SC018 Ack

A

SAP sends an acknowledgement to Shop Floor System for each handling unit as to
whether it was received to inventory in SAP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

I_LG021

A

Shop Floor System sends details of products transferred directly from manufacturing
to an offsite warehouse or separate plant. STO and outbound delivery are created
and processed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LG021 Ack

A

SAP sends an acknowledgement to Shop Floor System for each handling unit as to
whether it was successfully processed/transferred

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

I_SC020

A

Shop Floor System sends updates for handling units to (a) update the stock status,
(b) change the material and/or batch,( c) add or change a release code, and (d) add a
relabel flag – which will trigger a transfer order to a relabel bin in the WH.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

I_SC021

A

Shop Floor System sends updates to batch characteristics and/or updates to the stock
status of the batch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

I_LG013

A

SAP sends the HU details of a transfer to the manufacturing location. Each child HU is
included, with associated parent, material/batch, net/gross weight, number of tubes,
and associated process order/production run

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

I_SC034

A

Shop Floor System sends a request to do rework. A process order is created and
released, the components are updated based on the HU’s to be reworked, an STO and
delivery are created, and if WH-managed a transfer order created for the HU’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Availability

Check

A

SAP check to determine whether the components or

capacities required for a production order are available.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Backflush

A

Automatic consumption of material against a process order.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Batch

Determination

A

The process in SAP to determine the correct batch of the

material to issue to the process order.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Bill of Material

BOM

A

BOM is a formally structured list of the components that
make up a product or assembly. BOM get copied to process
order of in-house manufactured materials.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Capacity

Planning

A

The process in which the capacity requirements are

determined and compared with each other.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Confirmation

A

Confirmation of the materials consumed in producing a
certain quantity of the product. Also, the transaction that
issues the backflushed materials to the process order.

17
Q

Goods Issue

A

Manual Consumption of material against a process order.

18
Q

Goods Receipt

A

Increase in inventory of the material being produced /

procured / recorded to the Process Order.

19
Q

Material Master

A

Material master is maintained with all the details of MRP
and Work Scheduling view related to manufacturing
activities.

20
Q

Master Recipe

A

In the Master Recipe, the processes to be used for
producing materials in the plant as well as the resources
and ingredients required for production is described.

21
Q

Material
Requirement
Planning (MRP)

A

The Material Requirements Planning is a component of
Supply Chain Planning used to manage the manufacturing
processes such as ensuring materials are available for
production, plan manufacturing activities, delivery schedules
and purchasing activities etc.

22
Q

Material Type

A

Characteristic of a part that groups together materials with
the same basic attributes, such as plant stock or a semifinished
product.

23
Q

Order

Confirmation

A

The confirmations that document the processing status of
operations or sub-operations associated with manufacturing.
The SAP system distinguishes between the partial and final
confirmations.

24
Q

Planned Order

A

An interim order resulting from an MRP run. Planned Orders
are either changed or turned into a Purchase Order for
external procurement or Process Order for internal
production.

25
Q

Process Order

A

An order that contains the details such as number of
material components and required dates, for producing an
end product.

26
Q

Production

Execution

A

A portion that controls the production operations and
captures all the costs that are involved in transforming raw
materials into semi-or finished products.

27
Q

Resources

A

Resources are like work station on the production floor
which is used to manage the objects and persons involved
in the production process. In Resources, data related to
capacity and scheduling of planned order/process order are
defined along with parameter for costing of Process Order.