Installations Flashcards

1
Q

When constructing a walk-in freezer box, where is the vapour barrier installed?

a) under the floor slab
b) inside, on the coldest side
c) outside, on the warmest side
d) around any penetration sleeves

A

c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which of the following would be the best place to mount a wall thermostat?

a) kitchen
b) bathroom
c) exterior wall
d) near return air grille

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Condensate piping must be properly trapped to prevent?

a) ice formation
b) condensate running off evaporator coil
c) condensate overflowing the drain pain
d) excessive air noise in the piping

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Fresh air ducts used to route outdoor air to interior spaces, connect to the

a) vent piping
b) combustion air duct
c) supply side of duct system
d) return side of duct system

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The external equalizer connection to the suction line, should be located

a) next to the txv bulb
b) 6-8” upstream sensing bulb
c) 6-8” downstream sensing bulb
d) none of above

A

c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

For every 12k btuh of cooling, in open drive compressor air conditioning, the heat rejection is roughly

a) 12k btuh or 1.0 times net ref effect
b) 9k btuh or 0.75 times net ref effect
c) 15k btuh or 1.25 times net ref effect

A

c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

To protect a load, safety devices are often wired in

a) parallel
b) series
c) upstream
d) downstream

A

b)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Disadvantage of a mercury bulb switch?

a) unreliable
b) must be level
c) tend to brun contacts
d) tend to chatter

A

b)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Thermostat is properly calibrated when

a) set point and control point are equal
b) room temp is comfortable
c) there is no dead band
d) control point and thermometer reading are equal

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What minimum height must a refrigeration pipe be that crosses an area that affords a passageway?

a) 9ft
b) 6ft
c) 8.5ft
d) 7.5ft

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When installing a display freezer, how would you level the unit?

a) level to high point
b) not bother
c) grind floor so floor is level under unit
d) combination of shimming and grinding

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A fan in a display case is used for what purpose?

a) assist in condenser air circ
b) assist in maintaining air patterns
c) keep flies away
d) blow warm store air away

A

b)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

ON an ammonia system for a rec centre the refrigeration lines maybe painted

a) suction light green and discharge red
b) suction red discharge green

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Once the plastic pipe for a secondary refrigeration or coolant have been laid and before they are back filled they must be

a) stretched
b) shrunk to fit
c) pressure tested
d) painted with a corrosion resistant finish

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What do you put on the top of the sleepers in an arena install?

a) pipe chairs
b) floor coolant piping
c) sideboards
d) sleeping spectators

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Spacing between sleepers or chairs in an arena floor is a usual minimum of

a) 3ft
b) 2 yards
c) 10ft
d) 6”

A

a)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

How would you hoist an electric motor?

a) half hitches around shaft
b) rope woven through feet
c) lifting eye screwed in top
d) chain

A

c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

The sleepers installed in a rink floor are used to

a) support headers
b) support insulation
c) support concrete
d) support chairs for the refrigerant piping

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A hanger supported by 2 rods and from 2 separate roof support members is a

a) pivot type hanger
b) point ot point hanger
c) trapeze hanger
d) a 2 point clevis hanger

A

c)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Before slab for rink surface is poured the secondary ref piping is

a) x-rayed for cracks
b) pressure tested
c) re glued
d) stretched

A

d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Length of the liquid line will usually

a) increase SH absorbed by the ref
b) increase SC due to TD between ambient air and ref leaving condenser

22
Q

What shall be used between back of flare and the nut?

a) nothing
b) lubricant
c) gasket
d) pipe sealing compound

23
Q

What type of rigid harness to lift an electric motor?

a) wrap around synthetic web sling
b) eyebolt and shackle
c) cable and U bolt
d) bridal sling

24
Q

When making 90deg bends in tubing where is the measurement between bends taken?

a) centre of bend
b) back of bend
c) end of bend

25
Q

How do you secure pipes to a steal beam?

a) beam clamp
b) riser clamp
c) inverted clevis clamp
d) a steel two hole clip

26
Q

What would you install in piping supply between 2 chilled water coils?

a) drip leg
b) union
c) bucket trap
d) PRV

27
Q

Where is the king valve located?

A

outlet of receiver

28
Q

An instrument used to check alignment of two shafts connected with a coupling?

a) vernier caliper
b) inside caliper
c) hermaphrodite caliper
d) dial indicator

29
Q

The vapour barrier on a walk-in cooler, placed on the inside of the building is

a) not required
b) placed between insulation and interior of the box
c) placed on both sides of the insulation
d) placed on warm side on insulation

30
Q

Types of refrigeration and air conditioning tubing:

K - ______duty ( _____ wall)

L - ______ wall thickness

M - ______ duty (____ wall)

Type __ is most common in this trade

A

K - heavy duty (thicker wall)

L - Regular wall thickness

M - Light duty (thin wall)

Type L is most common

31
Q

Which Refrigeration piping is the most crucial to install correctly?

A

Suction line

32
Q

Suction line design and installation:

Common goal limit suction line to __F equivalent pressure drop

33
Q

Suction line design and installation:

  1. Return ___ back to the compressor under all load conditions
  2. Prevent oil from draining from active and inactive _________
  3. Prevent liquid refrigerant from draining back to the _________ during the off cycle
  4. Prevent unnecessary _____ gains and the line sweating
A
  1. oil
  2. evaporator
  3. compressor
  4. heat gains
34
Q

Ensure trap is installed at the base of all suction line risers over __ft (good up to 25ft of rise)

35
Q

Suction line design and installation:

  1. Use double suction risers if system can reduce capacity down to ___% of full load
  2. Insure high compression ratios are _______
  3. Pitch horizontal runs 1/2” down every ___ft in direction of flow
  4. Use _____ at the top of coil when pump down control is not used
A
  1. 50%
  2. avoided
  3. 10ft
  4. loops
36
Q

Suction line design and installation:

Ensure ___” of suction line within the conditioned space before exiting

37
Q

Hot gas line design and installation:

Common goals limit hot gas line to __F equivalent pressure drop

38
Q

Trap at base of all hot gas risers over 8ft (good up to ___ft)

39
Q

If vertical velocity is less than 1000fpm then a double ______ should be installed

40
Q

Hot gas design and installation:

  1. Use double hot gas risers if system capacity drops to ___% of full load
  2. Ensure a max gas velocity of _____fpm is not exceeded
  3. pitch all horizontal runs 1/2” every 10ft in direction of _____
A
  1. 50%
  2. 4000fpm
  3. flow
41
Q

Liquid line design and installation:

Common goal limit liquid line to __F equivalent pressure drop

42
Q

Risers that have an eight foot vertical rise or less do not need to have an ___ ____ at the bottom of the riser

43
Q
  1. If the rise of the discharge or suction riser is greater than eight feet then a ____ should be installed at the bottom of the rise
  2. The reason for this is so that oil will not accumulate at the heads of the compressor during the ____cycle
44
Q

Purpose of a pump down system?

A

prevent liquid refrigerant from migrating back to the compressor

45
Q

Horizontal refrigerant lines shall slope how much per 10ft?

A

1/2” per 10ft

46
Q

Drain line slope is how much?

A

1/4” per foot

47
Q

Refrigerant piping of less than 7/8 must be supported every

a) 12ft
b) 10ft
c) 8ft
d) 6ft

48
Q

What must be checked before craning equipment on the roof?

A

Read manual and confirm phase/voltage

49
Q

Sensing bulb installation on lines larger than 7/8?

A

4 or 8 o clock

50
Q

Sensing bulb installation on lines smaller than 7/8?

A

12 o clock

51
Q

Where should the sensing bulb never be installed?