inspected? Flashcards
nolan rail cart
co commanders shall establish schedule
each section and hand truck marked with unit designation
FDNY air support PFD
the MD 3085 should be inspected weekly as well as prior to and after each use
EZ pass
Co officer/vehicle operator inspect transmitter at the start of EACH TOUR and use of vehicle
Positive pressure fans
what’s done at MUD?
Daily at the start of the 9x6
At MUD
- run for 5 min
- visual inspection of belt and tightness check(prior to starting)
- tech services for repair
CFRD equipment
during roll call
problems reported to officer in charge
HT batteries XTS3500R
when does officer take a mark in the journal
due date inspected each time batteries are placed on HT
1st of the month on 9x6 a member shall inspect all batteries for due date. off. take a mark
All ice and cold water rescue equipment
Jan, April, July & Oct
When is ice and CWR suits removed from bag hung on a broad shouldered hanger for at least 48 hrs
In January and July
all NOZZLES carried on Eng Co apparatus
start of each tour
hand held nozzles-following use washed out thoroughly and checked for defects. washed with soap and hot water
div of repairs and transportation
foam nozzles tech services
Hose
before being placed on apparatus
tech services for replacement
hood (PPC)
start of each tour and after each use
notify OOD
Portable ladders
visual inspection?
thorough inspection?
weekly
monthly
extension ladders
recoat with grease each year(aluminum truss)
paraffin or candle wax every 3 months to all contact surfaces
pulleys 1-2 drops of oil once a year
ultraradiac
weekly
- clean(mild solution of detergent and water)
- battery compartment’s door gasket
- battery contacts for corrosion
- perform operational test
water level in steam boilers
immediately after the 0900 and 1800 RC
OOD will supervise
hot water heating system reservoir of the pump bearing assembly for oil level
monthly
requires a few drops of oil semiannually
seat belts
each tour
high visibility safety vests
after each use and during semi-annual inspection
Repair or replace damaged rt2 quartermaster
Admin Division for spare
AFFF extinguisher
daily
LSR
all units except engines monday 9x6 inspect and repack
engines tuesday 9x6
life belt
weekly when LSR is repacked
personal harness (inspected by member)
when issued, replaced or returned, at the START of EACH TOUR, and after each use
PSS
start of each tour (visual and basic check)
semi-annual (repack and cover entire PSS)
after concluding operations (exposure to heat, defects, contamination)
search rope
after each use
repack monthly
co commanders establish schedule for training, inspection and repacking the search rope.
FAST PAK
beginning of EACH TOUR and after each use
APR
before first use
at least every 30 days and/or on the 1st of the month
Pak-Tracker
before each use and the start of each tour