inspected? Flashcards
nolan rail cart
co commanders shall establish schedule
each section and hand truck marked with unit designation
FDNY air support PFD
the MD 3085 should be inspected weekly as well as prior to and after each use
EZ pass
Co officer/vehicle operator inspect transmitter at the start of EACH TOUR and use of vehicle
Positive pressure fans
what’s done at MUD?
Daily at the start of the 9x6
At MUD
- run for 5 min
- visual inspection of belt and tightness check(prior to starting)
- tech services for repair
CFRD equipment
during roll call
problems reported to officer in charge
HT batteries XTS3500R
when does officer take a mark in the journal
due date inspected each time batteries are placed on HT
1st of the month on 9x6 a member shall inspect all batteries for due date. off. take a mark
All ice and cold water rescue equipment
Jan, April, July & Oct
When is ice and CWR suits removed from bag hung on a broad shouldered hanger for at least 48 hrs
In January and July
all NOZZLES carried on Eng Co apparatus
start of each tour
hand held nozzles-following use washed out thoroughly and checked for defects. washed with soap and hot water
div of repairs and transportation
foam nozzles tech services
Hose
before being placed on apparatus
tech services for replacement
hood (PPC)
start of each tour and after each use
notify OOD
Portable ladders
visual inspection?
thorough inspection?
weekly
monthly
extension ladders
recoat with grease each year(aluminum truss)
paraffin or candle wax every 3 months to all contact surfaces
pulleys 1-2 drops of oil once a year
ultraradiac
weekly
- clean(mild solution of detergent and water)
- battery compartment’s door gasket
- battery contacts for corrosion
- perform operational test
water level in steam boilers
immediately after the 0900 and 1800 RC
OOD will supervise
hot water heating system reservoir of the pump bearing assembly for oil level
monthly
requires a few drops of oil semiannually
seat belts
each tour
high visibility safety vests
after each use and during semi-annual inspection
Repair or replace damaged rt2 quartermaster
Admin Division for spare
AFFF extinguisher
daily
LSR
all units except engines monday 9x6 inspect and repack
engines tuesday 9x6
life belt
weekly when LSR is repacked
personal harness (inspected by member)
when issued, replaced or returned, at the START of EACH TOUR, and after each use
PSS
start of each tour (visual and basic check)
semi-annual (repack and cover entire PSS)
after concluding operations (exposure to heat, defects, contamination)
search rope
after each use
repack monthly
co commanders establish schedule for training, inspection and repacking the search rope.
FAST PAK
beginning of EACH TOUR and after each use
APR
before first use
at least every 30 days and/or on the 1st of the month
Pak-Tracker
before each use and the start of each tour
SCBA (3 times)
- immediately after the 0900 & 1800 RC
- immediately before the start of MUD
- after each use
pressurized water extinguisher
DAILY and after each use
KO curtain
weekly during MUD
after each use
fire window training blanket
before and after each use
fire window blanket
weekly during mud and after each use
cockloft nozzle
visual inspection WEEKLY
Tech services
portable power saws
beginning of each tour
belts MUD and after every cutting operation
if MUD is canceled inspect when unit returns to quarters
major repair tech services
Can be done by units: A. Change spark plugs. B. Change the blade. C. Refuel the tank D. Change and adjust belt. E. Clean the exterior of the saw. F. Change the air filter.
HURST tool
daily and after each use
OOS business hours tech services
OOS other times FDOC generator,cutters,spreaders only
multiversital nozzle spikes
after each use ( if they exceed 1/16 in diameter sharpen or replace)
air bags
after each use
chain saw
weekly
hydra ram
after each use
TIC
immediately after 0900 and 1800 RC
after each use
Purple K extinguisher
beginning of each tour
thoroughly once a month
-tech service to replace
nylon tubular webbing
monthly and after each use
to requisition replacement lengths the OOD should send an RT-2 to the tool room
temporary fastenings for a portable ladder on the apparatus
checked after each response
calibration check for ultrardiac done by hazmat ops
annually
LSR carry case & anti chafing device
each time the rope is repacked check for cleanliness and dryness
portable generators
run for how long?
with light on?
weekly
15 min
operate all lights for 5 min
check bulbs for tight connection
onboard generators
weekly during MUD
1 1/8 MST on the high rise nozzle
weekly during MUD and after each use
lobster tool
Battery?
Cutter?
hydraulic oil?
battery-start of each tour
cutter-weekly(cleaned with dry cloth)
oil-every 6 months jan and july 1st
tool room for oil tech services repair
who replaces/repairs sound powered phones
when is 9v battery changed
R & D
semiannually
foam eductors of engine companies
weekly at mud
after each use flush for 15 min
tech services for repair
All eductors of engine companies will be tested at weekly MUD using the following procedure:
• Stretch a hose line
• Insert the eductor in the supply line
• Start water to the foam nozzle
• ECC to supply 200 PSI to the eductor
• Place your hand over the bottom of the foam pickup tube. You should feel suction. If you do not get suction check the following;
1. The washers between the pickup tube and the eductor.
2. That the eductor-proportioning valve is not set at zero.
3. That the ball in the eductor is not stuck.
Foam Carriers (housed with eng co)
Monthly drill at 1st MUD of the month
-Tank to pump valve & all gates operated
-all eductors tested
fleet maintenance if carrier not operating properly
AkronNew Yorker multiversatile nozzle routine maintenance
Conducted quarterly following the instructions in the manufacturers manual
Hose on apparatus removed and cleaned
Spring and fall of each year
If it’s going to reach 10 years old in the current calandar year notify fire tools and equipment
Hose with aluminum alloy couplings uncoupled and threads greased
Monthly
Snow chains remaining on apparatus
Chauffeur will examine at the beginning of each tour
All spare cylinders, including those on apparatus and spare apparatus
Weekly on Monday
5 gallon water jugs Carried on all apparatus
Shall be checked and refilled with fresh water at each roll call
Controlling nozzles tested in accordance with the schedule established by div commander
Annually in august
Heating and diesel fuel measured
After 0900 Rollcall
Doors guards and lights at polehole openings
Daily
The teleprinter emergency power system tested in accordance with instructions contained on the decal affixed to the front panel of the red charging unit in the vicinity of the batteries
On the first of every month
The Battery Backup system for the Firehouse Voice Alarm consists of four (4) 12V Rechargeable Batteries.
Who checks them and when?
an outside contractor every 6 months
Metrocard
After each roll cal OOD- entry in co journal that its accounted for and on app.
Vehicle Recovery Strap
Before and after each use
Fire tools and equipment unit for replacement
Apparatus Entrance Doors
Company Commanders:
Once each month examine
-determine condition
-lubricate with light oil when necessary
Quantity of Diesel/Heating Fuel
Immediately after 0900 RC Record in journal Indications of water or sediment in tanks–Fire Department Resource Center
Safety Equipment
as per S.B. 65
Semi-annual
April 15 to June 15 is annual inspection &
September/October