Houses Flashcards
The load side geothermal lines should be
6” apart when they enter the mechanical room.
Insulated from ground to heat pump.
Boxed at ground level so they can move slightly.
The buffer tank should have 4
Dielectric unions for easy servicing
I can’t insure houses with
Aluminum wiring or breaker panels below 100A.
kW is a measure of
Power, which is the rate at which work is done.
kWh
The amount of energy used by an electrical device during a period of time.
Five principles of a passive house
Air tight construction
Extra insulation
High performance glazing
Efficient ventilation
Reduced thermal bridging
Cap Rate
NOI (Net operating income) divided by asset value
Thermostat wiring
Red - 24v
Blue - common (-)
Green - fan
White - heat
Yellow - cool
Commercial Leases
A single net lease adds property tax to rent. Double net adds insurance. Triple net adds maintenance.