Hoseline placement Flashcards
What size hoseline is recommended for private dwellings
1 3/4 due to need for speed and mobility
At PDs where shall the hoseline be readied
flaked out, charged and bled BEFORE entering building
what is the primary consideration in the placement of the 1st hoseline for access to the first floor or floor above in a PD
the main entrance door to the building
what is the primary consideration in the placement of the first hoseline for access to a fire in a private dwelling Cellar
via the entrance door that provides the quickest access to the fire area
what things warrant an exterior hoseline being operated into a cellar window of a PD
1-unable to quickly access or locate a secondary cellar entrance AND unable to advance down the interior stair
2- serious or advanced fire
3- unable to locate any entrance
4- cellar fire involving LIGHTWEIGHT construction ***
who can call for an exterior line into a cellar window at a PD fire
the IC (chief or company officer)
what is the primary consideration for members operating on the first floor above a cellar fire in a PD
Close the interior cellar door at the top of the stairs
the first hoseline in a PD cellar fire shall be coordinated by who
the first engine and ladder officers
in a cellar fire in detached or semi attached PDS what is usually the quickest access
the secondary entrance found on the side of the rear
what is the least desirable entrance for cellar fires that should only be utilized if it’s the only option?
BILCO style doors
in attached PDs which is generally the fastes option for stretching the first line into a cellar
the interior stairs
what situations would preclude the descent of the first hoseline down the interior cellar stairs
HIGH heat
Stability of the stairs
size up of a serious fire condition
who may call for the initial hoseline at a PD to be repositioned
The acting chief or the chief officer ONLY***serving as the IC may consider repositioning.
when repositioning a hoseline in a PDwhat shall be done in regards to the ladder company members
members must be withdrawn before the first hoseline is moved
when repositioning a hoseline in a PD who will operate with the engine company to facilitate the advancement of the hoseline to another entrance
the forcible entry team