Hoseline placement Flashcards

1
Q

What size hoseline is recommended for private dwellings

A

1 3/4 due to need for speed and mobility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

At PDs where shall the hoseline be readied

A

flaked out, charged and bled BEFORE entering building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what is the primary consideration in the placement of the 1st hoseline for access to the first floor or floor above in a PD

A

the main entrance door to the building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

what is the primary consideration in the placement of the first hoseline for access to a fire in a private dwelling Cellar

A

via the entrance door that provides the quickest access to the fire area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what things warrant an exterior hoseline being operated into a cellar window of a PD

A

1-unable to quickly access or locate a secondary cellar entrance AND unable to advance down the interior stair

2- serious or advanced fire

3- unable to locate any entrance

4- cellar fire involving LIGHTWEIGHT construction ***

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

who can call for an exterior line into a cellar window at a PD fire

A

the IC (chief or company officer)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

what is the primary consideration for members operating on the first floor above a cellar fire in a PD

A

Close the interior cellar door at the top of the stairs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

the first hoseline in a PD cellar fire shall be coordinated by who

A

the first engine and ladder officers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

in a cellar fire in detached or semi attached PDS what is usually the quickest access

A

the secondary entrance found on the side of the rear

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

what is the least desirable entrance for cellar fires that should only be utilized if it’s the only option?

A

BILCO style doors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

in attached PDs which is generally the fastes option for stretching the first line into a cellar

A

the interior stairs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

what situations would preclude the descent of the first hoseline down the interior cellar stairs

A

HIGH heat
Stability of the stairs
size up of a serious fire condition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

who may call for the initial hoseline at a PD to be repositioned

A

The acting chief or the chief officer ONLY***serving as the IC may consider repositioning.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

when repositioning a hoseline in a PDwhat shall be done in regards to the ladder company members

A

members must be withdrawn before the first hoseline is moved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

when repositioning a hoseline in a PD who will operate with the engine company to facilitate the advancement of the hoseline to another entrance

A

the forcible entry team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

whenever the hoselines are stretched and operating at a PD what shall be done

A

a 3rd pine shall be positioned and charged at the front of the building

17
Q

who attempts examination of the cellar at a first floor PD fire

A

the first due ladder attempts
the second due ensures

18
Q

when a PD is fully involved what shall be considered

A

2 1-2 hoseline

19
Q

when should a 2 1/2 be considered at a PD fire

A

wind impacted fire
heavily involved first floor fire in a larger queen anne