HO 221 Losing Handover Flashcards
(P, SO) on checklist
Must be done by pilot and sensor operator
Responsible for conducting the mission during remote split operations
MCE
Mission control element
(+) on checklist
Step requires coordination with another GCS
(*) on checklist
Item that needs to be reacomplished after a power down and subsequent power up.
How do you verify the software version for RPA operations?
Through the tracker display pull down menu “CSC versions”
How is Ku enable/disable done in the GCS
Tracker display pull down menu
Checklist that ensures the gaining GCS is in working parameters to accept an aircraft
Rack configuration checklist
Rules and procedures During MCE losing handover - airborne
RL rate select should be shared and MTS should be in IR for losing handover ops
Flies aircraft toward launch/recovery base
Set up op mission with lost link ok
Accomplish checklists to set aircraft and datalink for another element to take control
Role of MCE during losing handover
How do you mute/unmute command link/ku
Call comm L3 technician
Done at SETSS/PPSL site
Why change your initial lost link heading after accepting aircraft
Because GCS accepts the GCS presets
In regards to airspace what should be done prior to accepting aircraft
Verify airspace clearance
MCE role during gaining handover
Gains aircraft control from LRE
GCS configuration
Control alt + G on compass rose
(- ) on checklist
Done by either pilot or sensor