HiRise office 1938 building code
fire pumps required in buildings over _____ feet
250
HiRise office 1968 building code
fire pumps required in buildings over _____ feet
300
Pump room ops
locate the bypass valve on the [inlet/discharge] side?
discharge
discharge side has higher gauge pressures
Pump room ops
Bypass valve is closed she the stem is [in/out]?
stem in
Pump room ops
If bypass valve is open close it [clockwise/counterclockwise]?
clockwise close
Pump room ops: steps to start pumps?
“Kansas City Starters Suck”
K—close the “knife” switch
C—close the “circuit” breakers
S— push the “start” button
S— move the “selector” level
Pump room ops
Near each pump there is a standpipe phone that gives 2 way communication to the ________.
ICP
Pump room ops
If there are 2 pumps start them both at or near the same pressure. T/F
true
Pump room ops
Pump pressures are the same as high pressure pumping
Floors 1-10 ____ psi
Floors 11-20 ____ psi
1-10 150psi. 11-20 200 psi
report of fire confirmed hi rise office 10-__
10-76
10-76 2nd alarm=
1.
2.
3.
- visible fire
- smoke emanating through the skin of the building
- serious fire VERIFIED
A second alarm is warranted for any visible fire or smoke emanating through the exterior skin of the building or when a serious fire has been verified
Hirise office:
Fire sector/Fire branch
where/what is it?
the fire floor and the floor above
Hirise office:
The fire sector supervisor(BC) operates on HT channel __
ch 1
Hirise office:
fire sector supervisor(BC) will position where if conditions allow?
floor below the fire
Hirise office:
All units communicate on HT___?
Do not call ICP unless what?
ht 1
do not call ICP unless urgent– all maydays and urgents go to IC (ch 1)
Hirise office: SAE group
What areas does the SAE search and examine?
areas above the fire sector/branch(the fire floor and the floor above)
Hirise office: SAE group
All units communicate on HT Ch __
Ch 3 do not call ICP unless urgent
Hirise office: SAE group
Where is it located? (regarding elevators and at least how many floors above the fire)
on a floor not serviced by the same bank of elevators as the fire floor and at least 5 floors above the fire
Hirise office: forward staging area
Where is it located?
two floors below the original fire floor
Hirise office: forward staging area
What do engine companies bring?
SCBA
spare cylinder
standpipe kit
length of hose per FF
Hirise office: forward staging area
what do ladder companies bring?
SCBA spare cylinder search and utility ropes 2 sets of FE tools 6' hooks
Hirise office:
Where is the staging area located?
primary point outside the structure, located away from the building