Highway Inspcetion Nicet lvl 1 Flashcards
Terms
Of the Following statements relating to the new bell and spigot pipe being laid in a trench, the one that is CORRECT is that?
When Building a new line using bell and spigot pipe, you start from the downstream end.
What is Vitrified Pipe made of?
Clay
The Invert of a sewer pipe is Its
Inner Bottom
A cradle is usually placed under a sewer pipe when the
Soil is poor
A monolithic Sewer is a
Reinforced concrete cast in place sewer
The best reason for placing manholes on sewers is to?
Provide access for inspection and maintenance
The sheeting for a sheeted sewer is ordered left in place after the sewer has been built and back filled, What is the best reason for ordering the sheeting left in its place?
This minimizes the settlement outside the sheeted area.
The Two most frequently used types of sheeting for normal soil conditions and average depths are?
A soldier beams With Horizontal sheeting and vertical wood sheeting for bracing.
A specification for a new sewer requires that the pavement NOT be restored for a period of At-least 6 Months after back fill is placed. The best reason for this requirement is?
Minimize the settlement of the Pavement.
in reinforced concrete sewers, the reinforcing steel must have a minimum cover of concrete, What is the best Reason for this requirement?
Protect the Reinforced steel from Corrosion.
As used in relation to sewers, Infiltration refers to the?
Inflow of ground water into the Sewer
A BAD effect of infiltration in a sanitary sewer is that it?
Tends to overload the Sewage Treatment plant
Manhole frames and covers are usually made of?
Cast Iron
A storm Sewer GENERALLY differs from a sanitary sewer in that a storm sewer ?
Generally Larger in size and carries little dry-weather flow.
The Spacing of rungs used for steps in a manhole is MOST Nearly ____ Inches?
12 Inches