High Rise SOG Flashcards
low rise
4-6 Floors
Commercial height
1-3 Floors
First Alarm- First arriving Engine
Establish point of entry Take command / Lobby Control Monitor Systems Confirm stairwell for fire attack/Evacuation Building Keys OTIS 1
Engineer - Standpipe Connection
Firefighter - Secure Doorway - OTIS 1
First Alarm- Engine 1 Equipment
phone elevator keys 4 SCBA bottles (one in each elevator) Halligan Irons High Rise Bag
First Alarm - Second Arriving Engine
Investigate/Fire Attack Mode (w/E3/T1)
On or above 7 use OTIS 1 (min 2 companies) two floors below fire
Engineer - supply First Engine
First Alarm - Second Engine equipment
High Rise Bag Gated Wye 3 lengths 2.5 hose with nozzle Irons Keys
First Alarm - Third Engine
Fire Attack Investingate w/ E2/T1
Engineer - initial sprinkler system
First Alarm - E3 Tools
High Rise Bag
Gated Whye
2 lengths 2.5
4 SCBA
First Alarm - Engine 4
W E5/T2
- Fire floor ops - Fire attack or two out
- Establish Division Sup
- Establish Numerical Division based on floor (relieved by 2nd arriving BC)
Engineer - Supply 3rd engine
First Alarm - Engine 4 Tools
High Rise Bag Gated Wye 2 2.5 hose 4 SCBA Irons Keys
First Alarm - 5th Arriving Engine
Assist E4/T2 - Fireground floor ops
Engineer - Park at point of entry
- Mark entry point and maintain doorway
- Whiteboard to track companies
First Alarm - 5th Engine Tools
High Rise Bag Gated Wye 2 2.5 hose 4 SCBA Halligan Keys
First Alarm - Truck 1
Assist E2/E3 Investigate/Attack
*Captain determine Staging - Min two floors below fire notify Command
Engineer
- spot truck
- Gas Blower to lobby
- OTIS 2
First Alarm - T1 Tools
2 - Z hooks Search Bag Irons Hydra Ram Gas Blower TIC Water Can Keys
First Alarm - T2
Assist E4/E5 Fire floor ops
Engineer - Spot Truck
- Gas Blower to lobby
- Initiate pressurization of FA stairwell with 2 blowers
First Alarm - T2 Tools
2 Z hooks Search Bag Irons Hydra Ram Gas Blower TIC 6 SCBA bottles Keys