High Rise ops Flashcards
A high rise is what size
75’ or more
A mid rise is
More than 35’ but less than 75’
What is first priority of Base? Where is it located?
Water supply (Eng. becomes water supply) 200' from structure (verify w/ IC)
Base reports to IC until who is assigned
Logistic section chief
Normally ___ companies kept at base for every ___ company held in staging
2- base
1- staging
2:1 factor
2 other duties of base personnel
Deliver equipment from base to lobby (by priority)
Direct companies from base to lobby (lobby control pers.)
Where is staging located
2 floors below fire
A division is
Geographical
A group is
Functional
Lobby and Base report to
Logistics section chief
Who makes up ICS command staff
IC
Safety Officer
Public Information Officer
Liaison
Staging reports to
Operation section chief
When fire attack reaches fire floor they become
A division
If we have a high rise incident what should be established? What does it stand for?
ALS Base Fire attack- 1st 2 companies Lobby- 3 Staging- 4th (2 floors below fire) Base/water supply- 5th (must be Engine)
ICS general staff
Finance
Logistics
Operations
Planning