Hazards Flashcards

1
Q

DOGGING WORK INCLUDES THE RESPONSIBILITY OF WHAT TASKS?

A
  1. SELECTING SLING AND SLINGING TECHNIQUES
  2. ASSESSING LOADS
  3. INSPECTING LIFTING GEAR
  4. DIRECTING THE CRANE OPERATOR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AT WHAT POINT DOES A PERSON SILING A LOAD NEED A DOGGING LICENCE

A
  1. SELECTING SLING AND SLINGING TECHNIQUES
  2. ASSESSING LOADS
  3. INSPECTING LIFTING GEAR
  4. DIRECTING THE CRANE OPERATOR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

LIST 3 PEOPLE YOU SHOULD TALK ABOUT SITE HAZARDS BEFORE YOU START WORK

A
  1. OTHER WORKERS
  2. SUPERVISORS
  3. ENGINEERS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

WHY IS IT IMPORTANT TO TALK TO THESE PEOPLE BEFORE STARTING WORK

A
  1. KNOW THE HAZARD

2. FOLLOW WORK PLACE POLICIES AND PROCEDURES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

LIST 10 HAZARDS YOU MIGHT FIND IN THE WORK PLACE

A
  1. POOR LIGHTING
  2. UNDERGROUND SERVICES
  3. POTENTIAL NON-WEIGHT BEARING SERVICES
  4. PEDESTRIANS
  5. VEHICLES
  6. TREES
  7. POWERLINES
  8. WEATHER - LIGHTENING AND WIND
  9. BUILDINGS
  10. WORKERS / DANGEROUS MATERIALS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

OTHER THAN IDENTIFIED HAZARDS, LIST 5 THINGS YOU MUST CONSIDER

A
  1. SIZE OF LOAD
  2. COMMUNICATION
  3. ACCESS AND EGRESS
  4. LOCATION OF LOAD
  5. PERMITS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LIST THE HIERARCHY OF CONTROLS FROM THE MOST EFFECTIVE TO THE LEAST

A
  1. ELIMINATION C
  2. SUBSITUTIONS
  3. ISOLATION
  4. ENGINEERING
  5. ADMINISTRATIVE CONTROLS
  6. PPE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

WHEN SHOULD YOU CHECK IF YOUR PPE IS SAFE TO USE

A

BEFORE USE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

WHEN SHOULD YOU CHECK IF YOUR PPE IS SAFE TO USE

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

WHEN SHOULD RISK CONTROL MEASURES BE PUT IN PLACE

A
  1. BEFORE STARTING WORK

3. WHEN IDENTIFIED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

LIST 4 ITEMS OF PPE A DOGMAN SHOULD WEAR

A
  1. HARD HAT
  2. SAFETY SHOES
  3. SAFETY GLOVES
  4. HIGH VISIBILITY CLOTHING
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

WHEN SHOULD EXCESS MATERIAL BE REMOVED FORM THE WORK AREA

A

AS SOON AS POSSIBLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

WJAT ARE THE 3 ZONE DISTANCE AND CORRESPONDING VOLTAGES FOR WORKING NEAR POWER LINES IN NSW

A
  1. 3 M - 132 KV
  2. 6 M - 330 KV
  3. 8 M - 330 KV AND ABOVE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

IF YOU NEED TO WORK CLOSER THAN THESE MINIMUM DISTANCE HOW CAN THIS BE DONE

A
  1. HAVE THE POWER TURNED OFF
  2. EXEMPTION / PERMIT
  3. SAFETY OBSERVER
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

HOW CAN YOU DETERMINE THE VOLTAGE OF OVERHEAD POWERLINES

A
  1. SIGNANE

2. CALL POWER COMPANY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

WHAT IS USED TO INDICATE THE PRESENCE OF OVERHEAD POWERLINES

A

TIGER TAILS

16
Q

WHAT SIZE SHOULD A TAGLINE BE

A

16 MM

17
Q

WHAT MATERIAL SHOULD A TAGLINE BE MADE OF

A

NON-CONDUCTIVE ROPE

18
Q

WHY IS IT CONSIDERED UNSAFE TO RAISE OR LOWER THE BOOM OVER PEOPLE

A

RISK OF SERIOUS INJURY OR DEATH

19
Q

HOW DO YOU DETERMINE IF A CCLP CAN TAKE THE WEIGHT OF THE LOAD

A
  1. CHECK SAFE WORKING LOAD ON CCLP

2. CALL MANUFACTURER

20
Q

WHAT NEEDS TO BE CONSIDERED WHEN PLACING A LOAD ON A CONCRETE FLOOR? WHERE WOULD YOU GET THE REQUIRED INFORMATION FOR THIS TASK.

A
  1. SAFE WORKING LOAD OF FLOOR

2. ENGINEER

21
Q

WHAT IS THE HAZARD AND HOW WOULD YOU CONTROL IT FOR PEOPLE WORKING NEAR THE CHASSIS OR OUTRIGGER OF A MOBILE SLEWING CRANE

A
  1. BEING STUCK OR CRUSHED

2. EXCLUSION ZONE

22
Q

WHAT NEEDS TO BE PROVIDED IN DARK OR POORLY LIT AREAS

A

ADEQUATE LIGHTING ACROSS ENTIRE WORK AREA

23
Q

LIST 2 HAZARDS THAT CAN RESULT FROM WORKING WHEN ITS WINDY

A
  1. LOAD SWING/SPIN

3. CRANE INSTBAILITY

24
Q

WHAT IS THE PURPOSE OF A TAGLINE

A

TO CONTROL THE SAFE LANDING OF THE LOAD

25
Q

WHEN SHOULD A TAGLINE BE USED

A
  1. AROUND POWERLINES
  2. WINDY CONIDTIONS
  3. WORKING AROUND OBSTRUCTIONS
26
Q

WHAT IS THE IMPORTANCE OF ALWAYS MONITORING THE LOAD WHILE DOGGING

A

INDENTIFYING AND CONTROLLING HAZARDS

27
Q

LIST 4 THINGS THAT MUST BE CONSIDERED WHEN THE PATH OF MOVEMENT FOR THE CRANE OR LOAD IS BEING WORKED OUT

A
  1. SIZE OF LOAD
  2. SIZE OF CRANE
  3. POWER LINES
  4. OBSTRUCTIONS
28
Q

WHEN SHOULD YOU PLAN THE PATH OF MOVEMENT WHEN MOVIGN THE LOAD OR CRANE

A

PLANNING STAGE

29
Q

LIST 3 THINGS YOU MUST DO IF AN UNSAFE INCIDENT OCCURS WHILE DOGGING A LOAD

A
  1. STOP AND ASSESS
  2. FIX IF POSSIBLE
  3. ASK FOR HELP
  4. REPORT