GPG RAIL IPT PT.2 Flashcards

1
Q

Describe how the deluge system works, when to activate it and where the trips are located.

A

It’s used to wash down area for spills and knock down vapors that are flashing off, activate when a release or spill occurs. Switches are located at top and bottom of stairs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Instead of a pump, MA has a what and is controlled by what?

A

Compressor and Venturi system, controlled by process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who controls the EDA pump? Who gives permission to start it up BEFORE starting?
When unloading is complete, what is the procedure for returning pump to PGA and turning off pump.

A

-Process controls pump
Turn pump switch off, close valves, contact process to let them know they have pump back and switch is off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Do you notify PGA that you are ready to unload?

A

Yes, before every unload.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What position is the pump control in during unloading?

A

Auto

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What position is the pump switch in when the unload is complete?

A

Off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the definition of Line and Equipment Opening?

A

Opening lines, equipment, or part of process to the atmosphere.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the advantages of using a double block and bleed?

A

Allows isolation of specific areas, safely de-pressures lines/equipment, and prevents cross contamination.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Give examples of line and equipment openings during the R/C unload procedure from start to finish.

A

Removing plugs from liquid and vapor valves on R/C, removing plugs from unloading hoses, disconnecting hoses after unloading.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Describe how to correctly remove a bull plug.

A

With hand/body out of line of fire, slowly remove bull plug while wiggling plug to release stored pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe how to assemble a double block and bleed.

A

Block valve, bleed valve, pressure gauge, check valve, block valve.
Check valve on utility side to prevent product contaminating utility lines.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are some hazards associated with insufficient line clearing?

A

PSCE, exposures, cross contamination, frozen products in lines, thermal expansion, equipment damage/gasket failures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Give some examples of different ways to clear a line.

A

Nitrogen, air, steam, rodding out line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During the line and equipment opening and clearing procedure what must always occur?

A

Stay out of the line of fire and de-pressure equipment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Explain the steps to secure a manway on a general service railcar, when using a pneumatic wrench.

A

Tighten in a star pattern and double check tightness in same pattern.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How do you verify signs of a heel or partially loaded railcar prior to opening manway and after opening manway?

A

Check springs on R/C for compression, vent and drain the heel, look inside when open.