Glossary Flashcards

1
Q

Statements or drawings that modify the basic contract documents after the latter have been issued to the bidders, but prior to taking bids.

A

Addenda

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

An amount added to the contract sum either by an accepted additive alternate or by change order.

A

Addition (to the contract sum)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Published public notice soliciting proposals for a construction project.

A

Advertisement for Bids

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

One who acts on behalf of another

A

Agent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Proposal by bidder for amount to be subtracted from or added to the base bid if the corresponding change in work is accepted.

A

Alternate Bid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Federal civil rights legislation that establishes the right of persons with disabilities to equal access to sites and buildings and sets design guidelines for its implementation.

A

Americans with Disabilities Act (ADA)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Contractor’s written request for payment of amount due on account of work completed and/ or materials suitably stored on the site. Also called Payment Request.

A

Application for Payment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Material or method that is approved by the architect as being equivalent to what was originally specified.

A

Approved Equal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

An alternative to litigating a dispute, in which one or more arbitrators hears the evidence and renders a decision.

A

Arbitration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Regulations that provide for accessibility to buildings and sites for persons with disabilities.

A

Barrier - Free Provisions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The sum of money stated in the bid for which the bidder offers to do the work, not including any alternate bids.

A

Base Bids

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The architectural services normally required for a building project, usually consisting of schematic design, design development, construction documents, bidding or negotiation, and construction contract administration.

A

Basic Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

A proposal by a contractor to do the work required by the contract documents for a stipulated sum of money.

A

Bid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A surety bond guaranteeing that the bidder will sign a contract, if offered in accordance with his or her proposal.

A

Bid Bond

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The invitation to bid, instructions to bidders, bid form, and the contract documents.

A

Bidding Documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A provision in the construction contract for payment of a bonus to the contractor for completing the project prior to a specific date, and for a charge (penalty) against the contractor for failing to complete the project by that date.

A

Bonus and Penalty Clause

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

An amount included in the contract sum to cover the cost of certain items not specified in detail. Hardware and other finish items are often handled in this manner.

A

Cash Allowance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A statement by the architect informing the owner of the amount due the contractor on account for work completed and/ or materials suitably stored.

A

Certificate for Payment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A document issued by the governing authority stating that a building complies with applicable laws and permitting occupancy for the designated use.

A

Certificate of Occupancy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

A document prepared by the architect stating that the work is substantially complete, thereby establishing the date of substantial completion. It generally fixes the time within which the contractor must complete the unfinished work listed.

A

Certificate of Substantial Completion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Professional services rendered by the architect, upon the owner’s request, in addition to the basic services identified i the owner - architect agreement

A

Change in Services (of the architect)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

A written order to the contractor, prepared by the architect and signed by the owner, contractor, and architect, which authorizes a change in the work, the contract sum or the contract time.

A

Change Order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

The owner’s job site representative

A

Clerk of the Works

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

A bond obtained by the contractor or owner, which guarantees that the project will be completed free of liens

A

Completion Bond

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

The architect’s basic services expanded to include certain additional services, such as programming, land use studies, etc.

A

Comprehensive Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

The sum established by the owner as available for construction of the project.

A

Construction Budget

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

A document, signed by the owner and the architect, which authorizes a change in the work, the contract sum, or the contract time. Used when there is not a complete agreement on the terms of the change order

A

Construction Change Directive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Working drawings and specifications

A

Construction Documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Management services performed by the architect or others, over and above normal architectural services, that contribute to the control of time and cost in the construction of a project.

A

Construction Management (CM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

An engineer or other specialist retained by the architect to provide specified professional services to the architect that the architect required to provide to the owner under the owner-architect agreement.

A

Consultant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

An amount of money set aside in a budget to cover unanticipated expenses.

A

Contingency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Working drawings, specs, addenda, general conditions, of the contract, supplementary conditions, and the owner-contractor agreement.

A

Contract Documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

The total amount payable by the owner to the contractor, as stated in the owner-contractor agreement, for performing the work under the contract documents.

A

Contract Sum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

The period of time within which the work must be completed, as established in the contract documents.

A

Contract Time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

An agreement under which the contractor, or the architect, is reimbursed for his or her costs and in addition is paid a fee for his or her services.

A

Cost Plus Fee Contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

A project management procedure in which all events and operations are charted in a what that establishes the optimum sequence and duration of operations

A

Critical Path Method (CPM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

A systematic listing of construction trades, materials, systems, and administrative requirements published by the Construction Specification Institute (CSI) for the purpose of organizing construction specs.

A

CSI MasterFormat

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

The date, certified by the architect, when the construction is sufficiently completed, in accordance with the contract documents, so that the owner can occupy the project of specified area of the project for the intended use.

A

Date of Substantial Completion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

A federal law that requires the Department of Labor to set prevailing wages for government - financed construction projects.

A

Davis-Bacon Act

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

A deposit of money required of each bidder as security for the bidding documents, to ensure the return of the documents by unsuccessful bidders.

A

Deposit for Bidding Documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Expense items directly incurred by or attributable to a specific project.

A

Direct Expense

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

Salaries and wages attributable to a specific project, plus benefits such as employment taxes, insurance, sick leave, holidays, vacations, pensions, and similar contributions and benefits.

A

Direct Personnel Expense (DPE)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

The General Requirements Division of the specs that establishes the administrative and procedural duties of the contractor, architect, and owner during construction.

A

Division One

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

The requirements that a professional exercise reasonable ability and judgement in a specific circumstance, the absence of which constitutes negligence.

A

Due Care (also called Standard of Care)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

A forecast of probable costs, as opposed to a firm bid.

A

Estimate

46
Q

A legally enforceable promise made by the warrant-or.

A

Express Warranty

47
Q

An item of work involving additional cost.

A

Extra

48
Q

A construction technique by which construction on each element of a project is begun as soon as the design for that element is completed, without waiting for completion of the design for the entire project. Its principal objective is to shorten the overall construction time.

A

Fast Track Construction

49
Q

The completion of all work in accordance with the terms and conditions of the contract documents.

A

Final Completion

50
Q

The extra time available for a construction activity above its estimated time duration, without causing any delay of project completion.

A

Float

51
Q

The part of the contract documents that states the rights, responsibilities, and relationships of the parties involved, usually by means of a standard document published by the American Institute of Architects.

A

General Conditions

52
Q

The agreement between the owner and the contractor for the construction of a project.

A

General Contract

53
Q

A legally enforceable assurance of the quality of materials and labor furnished for a project, of of the length of time that a project or a part thereof will perform satisfactorily.

A

Guarantee

54
Q

The amount established by agreement between owner and contractor as the maximum cost of performing specified work.

A

Guaranteed Maximum Cost (also called Guaranteed Maximum Price GMP)

55
Q

Clause in a cost plus fee contract between the owner and the contractor in which the savings between the guaranteed maximum cost and the actual project cost are proportionally shared.

A

Incentive Clause

56
Q

A contractual obligation whereby one party agrees to guarantee another party against loss or damage from specified liabilities.

A

Indemnification (also called Hold Harmless Clause)

57
Q

Overhead expense, that is expenses, indirectly incurred and not chargeable to a specific project.

A

Indirect Expense

58
Q

Instructions in the bidding documents for preparing and submitting bids for a project.

A

Instructions to Bidders (Notice to Bidders)

59
Q

Coverage by contract (insurance policy), whereby one party (the insurance company) agrees to indemnify or reimburse another (the insured) against loss from a specified hazard.

A

Insurance

60
Q

An invitation to a selected list of contractors soliciting bids for a project.

A

Invitation to Bid

61
Q

A bond guaranteeing to the owner that the contractor will pay for all labor and materials used for the project.

A

Labor and Material Payment Bond

62
Q

A letter signifying intention to enter into a formal agreement and setting forth the general terms thereof.

A

Letter of Intent

63
Q

Insurance that financially projects the insured against liability on account of bodily injury or property damage sustained by another.

A

Liability Insurance

64
Q

A sum chargeable against the contractor as reimbursement for damages suffered by the owner because of the contractor’s failure to complete the work within a specified time.

A

Liquidated Damages

65
Q

The lowest bid that complies with all the stipulated requirements.

A

Lowest Acceptable Bona Fide Bid

66
Q

The elements that comprise an exit to the outside, including aisles, corridors, doors, and stairways.

A

Means of Egress

67
Q

A claim on property by those who furnish material or labor for the construction of a building. Clear title to the property cannot be obtained until the claim is settled.

A

Mechanic’s Lien

68
Q

An agreement providing for payment for professional services based upon the direct personnel expense multiplied by an agreed factor

A

Multiple of Direct Personnel Expense Agreement

69
Q

A term sometimes used for on-site examination fo the contractor’s work by the architect to determine in general if it is proceeding in accordance with the contract documents.

A

Observation

70
Q

A choice given to the contractor to provide specified alternates without prior approval of the architect.

A

Option

71
Q

An owner architect agreement under which the professional fee is based upon a percentage of the construction cost of the project.

A

Percentage Agreement

72
Q

A bond that guarantees to the owner that the contractor will perform the work in accordance with the contract documents.

A

Performance Bond

73
Q

Additional services rendered to the owner by the architect following actual completion of the project

A

Post-Completion Services

74
Q

Any contractor on a project who has a contract directly with the owner.

A

Prime Contractor

75
Q

Insurance that financially protects an architect against claims for damages resulting form professional negligence.

A

Professional Liability Insurance

76
Q

A written statement of the owner’s conditions and requirements for the project.

A

Program

77
Q

Payments made to the contractor during progress of the work on account of work completed and/ or materials suitably stored.

A

Progress Payments

78
Q

The sum established by the owner as available for the entire project, including the construction budge, land cost, equipment cost, financing cost, cost of professional services, and contingency allowances.

A

Project Budget

79
Q

The manual prepared by the architect for a project, including the technical specs, bidding instructions and forms, general conditions supplementary conditions, special conditions, and other legal and administrative documents.

A

Project Manual

80
Q

The architect’s representative at the site, who assists in the general administration of the construction contact for a project.

A

Project Representative

81
Q

A list of items to be corrected or completed, which is provided by the contractor and usually expanded by the architect based on a detailed inspection of the work prior to substantial completion

A

Punch List

82
Q

Drawings revised to show changes made during constriction. Sometimes erroneously called As-Built Drawings

A

Record Drawings

83
Q

A legal document signed by a supplier of material or labor for a project, which releases his or her mechanics’s lien against the property .

A

Release of Lien

84
Q

An amount withheld from each payment to the contractor in accordance with the terms of the owner-contractor agreement.

A

Retainage

85
Q

Material or assembly submitted for the architect’s approval prior to manufacture or delivery to the project.

A

Sample

86
Q

A statement furnished to the architect by the contractor reflecting the amounts to be allotted for the principal divisions of the work. It serves as a guide for reviewing the contractor’s periodic applications for payment.

A

Schedule of Values

87
Q

One of several owner-contractor agreements for a project, each of which provides for constructing a major portion of work (general construction, electrical, mechanical, etc.) by a different contractor.

A

Separate Prime Contract

88
Q

Drawings prepared by contractor, subcontractor, manufacturer or supplier, showing how specific portions of the work shall be fabricated and or installed.

A

Shop Drawings

89
Q

A term used to describe poor indoor air quality, which can lead to discomfort and possibly disease.

A

Sick Building Syndrome

90
Q

A contract for building construction under which one prime contractor is responsible for the entire project, in contrast to having separate contracts.

A

Single Prime Contract

91
Q

Part of the contract documents, other than general and supplementary conditions, describing unique conditions of a project.

A

Special Conditions

92
Q

Part of the contract documents, comprising written descriptions of materials, construction systems, and workmanship.

A

Specifications

93
Q

An ordinance that specifies the period of time within which legal action must be brought in order to obtain legal relief for damage or injury.

A

Statute of Limitations

94
Q

An agreement under which the architect or contractor is paid a specific amount as the total fee for the services performed. Also known as Lump Sum Contract

A

Stipulated Sum Contract

95
Q

One who has a contract with a prime contractor to perform a portion of the work

A

Subcontractor

96
Q

A shop drawing, project data, or sample submitted by the contractor to the architect for review prior to incorporation in the work.

A

Submittal

97
Q

The substitution of one entity for another with regard to legal rights.

A

Subrogation

98
Q

A defined in the AIA General Conditions, completion of a project to the point where the owner can occupy all or designated portions of the work for the purpose for which it is intended.

A

Substantial Completion

99
Q

The contractor’s representative at the site.

A

Superintendent

100
Q

Direction of the work by the contractor’s personnel. Supervision is not the responsibility of the architect.

A

Supervision

101
Q

Part of the contract documents, prepared by the architect, which may modify provisions of the general conditions of the contract.

A

Supplementary Conditions

102
Q

An individual or company that guarantees to make good to another party the debt, default, or failure to perform of a third party.

A

Surety

103
Q

An agreement under which one party (the surety or bonding company) guarantees to make good to another party (the obligee or owner) the debt, default, or failure to perform of a third party (the principal or contractor).

A

Surety Bond

104
Q

An approach to the delivery of goods or services in which quality is determined by customer satisfaction and conformance to requirements.

A

Total Quality Management

105
Q

The difference between the list price and the actual price paid.

A

Trade Discount

106
Q

An amount, stated in dollars per unit, provided by the contractor with his or her bid for adding or deleting specific portions of the work.

A

Unit Price

107
Q

A membrane that prevents the passage of water vapor through a wall or roof.

A

Vapor Barrier

108
Q

A document by which one relinquishes the right of mechanic’s lien against the property of another.

A

Waiver of Lien

109
Q

All materials and/ or labor required for a project.

A

Work

110
Q

The part of the contract documents, prepared by the architect, that graphically illustrates the construction required for the project.

A

Working Drawings

111
Q

The exclusion from insurance coverage for liability arising out of (X) explosion or blasting, (C) collapse of structural damage to a building, and (U) underground damage caused by mechanical equipment

A

XCU