General Systems Flashcards

1
Q

How many diesel generators are fitted to a general system?

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does EDC stand for

A

Electrical distribution centre

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How many EDC does a general distribution system have

A

As many as required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What does MCCB stand for

A

Moulded case circuit breaker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

5 main breakers in a general distribution system

A

Supply breaker
Feeder breaker
Bus bar linking breaker
Interconnecting breaker
Shore supply breaker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a supply breaker

A

Goes from a supply to a bus bar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is a feeder breaker

A

Goes from a bus bar to kit/equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the power book

A

Shows the distribution of all 450v services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the lighting book

A

Shows all distribution of 115v lighting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the reference book

A

Shows all part numbers and quantities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

440v discrimination ratio

A

3:1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

115v discrimination ratio

A

2:1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is breaker discrimination

A

When the closest breaker to the fault is the first to trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does MCR stand for

A

Machine control room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are PCP and SCP

A

Primary control position
Secondary control position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What meters are fitted to a switchboard (5)

A

Volt meter
Ammeter
Frequency meter
Watt meter
Syncroscope

17
Q

What are the breaker operating stitches on the switchboard called (4)

A

Discrepancy switch
Start/stop switch
Selector switch
Control switch

18
Q

What is the process of connecting a shore supply

A
  1. Send a signal 24 hours before
  2. Raise permit to work
  3. Rack out breakers
  4. Test for dead
  5. Get the castel key
  6. Test shore supply cables
  7. Bring on and secure cable
  8. Connect cables
  9. Infirm dockyard
19
Q

Where is a ship earthed

A

Gangway
No less then half the ships length

20
Q

What is used to confirm correct phasing

A

The light on the right is bright

21
Q

What would happen to a motor if phasing was incorrect

A

The motor would spin backwards

22
Q

3 hand change over switches

A

Normal/Alternative
Normal/Emergency
Normal/Alternative/Emergency

23
Q

3 kinds of change over switch

A

Automatic change over switch (ACOS)
Remote change over switch (RCOS)
Hand change over switch (HCOS)

24
Q

What and where are the 440v earth testing facilities found

A

Control positions
Lamp and audible alarm

25
Q

Why is there a separate 115v test

A

Because of the transformer there is no physical connection