What are the Company speed restrictions?
An aircraft speed shall not exceed 250 kts below 10,000ft AGL or minimum clean speed , whichever is greater, unless a specific speed has been assigned by ATC, in which case speed shall not be greater than 250 kts below 5000ft AGL or minimum clean speed , whichever is greater
What are the maximum allowable bank angles during takeoff?
10 degrees below 300ft AGL
15 degrees at/above 300ft AGL
30 degrees at/above 500ft AGL
What are the maximum permissible rates of climb/descent?
During climb or descent, the maximum vertical speed shall not exceed
2000ft/min when within 2000ft of the cleared FL / Alt
1500ft /min when within 1000ft of the cleared FL/ ALt
These rates are maximum allowable: therefore, aircraft performance must be taken into account when adjusting V/S during a high level climb or descent
These rates are intended to minimize the generation of TAs and RAs and are therefore only applicable when other traffic is within 5nm and +-2000ft of your aircraft. If not applicable crews will utilize MANAGED auto flight functions to capture the assigned level
Maximum vertical speeds approaching Terrain / Obstacles
Below 10,000 ft AGL , at no time must rates of descent exceed :
5000 ft/min down to an altitude 5000 ft AGL 4000 ft/min down to an altitude 4000 ft AGL 3000 ft/min down to an altitude 3000 ft AGL 2000 ft/min down to an altitude 2000 ft AGL 1500 ft/min down to an altitude 1000 ft AGL
What are the Company stabilization approach criteria?
An approach is considered stabilized when the following parameters
1. Aircraft is on the correct path
2.Pitch is within +10 and 0 degrees (Airbus)
3. Bank is not more than 7
4. Speed is within target speed +10 kts & VREF/VLS excluding minor deviations due to gusty conditions on final approach
5. Aircraft is in correct and briefed landing configuration
6. Sink rate not more than
1000 ft / min CAT C aircraft
1200 ft / min CAT D aircraft
If higher rate of decent required by aircraft configuration approach procedure other specific conditions, it shall be briefed during approach preparations
7. Thrust / power appropriate for configuration and attitude. Significant changes are only allowed for gust compensation. Brief reductions to idle power are acceptable as long as all other stabilization criteria are met
8. All briefings and Checklist completed
9. ILS - within one dot Glide slope and Localizer
Non precision approaches - 1/2 dot or 2.5 deg for VOR
And 5 deg for NDB
What is the latest point at which the stabilization approach criteria must be met during precision and non-precision approaches?
1500ft RA (recommended Altitude) 1000 RA is the latest point . A Go Around must be executed if the Stabilization are not met by 1000ft RA ONLY as a consequence of ATC a deviation of the speed / thrust is permitted below 1000ft RA down to 500ft RA In this case , the stabilized speed criteria and the associated thrust setting must be reached by 500ft RA at the latest.
What is the latest point at which the stabilization approach criteria must be met during a straight-in instrument approach which is cleared to be concluded visually?
1000ft RA
What is the latest point at which the stabilization approach criteria must be met during circling approaches and visual circuits?
500ft AAL
What is Etihads policy regarding orbits on final approach?
Orbit on the approach segment , below 2000ft AGL , is prohibited for any purpose, including losing of height , speed or increasing the track miles , even when requested by ATC
What is Etihads policy regarding landing within the touchdown zone?
The desired touchdown zone lies between 300 to 600m from the landing threshold
If touchdown cannot be accomplished within the desired touchdown zone, a missed approach should normally be initiated with due regard to the remaining runway length
Spool up of engines aircraft speed and pitch attitude must be considered carefully
What is Etihads policy regarding the decision to execute a go-around?
A decision to initiate a GO-around rests with the commander as long as the aircraft is higher than 1000ft AAL
Below 1000ft AAL a GO-around shall be executed as soon as any active crew member calls out GO AORUND , regardless of who is PF/PM
When is the sterile cockpit Policy in force?
The Commander shall ensure the “sterilize cockpit policy “ is in force
: from commencement of pushback (engine start when no pushback required) , to top of CLimb (TOC)
: from TOD until engine shutdown on stand
What is the no contact period and when is it valid?
During the no contact period there shall be no contact with the flight deck crew from the cabin crew
The no contact period is from:
The application of takeoff power until the under carriage is retracted
The extension of the under carriage prior to landing until the aircraft has vacated the runway .
What is the priority of tasks for the PF in Normal & abnormal situations?
During all phases of flight, the PF duties must be clearly assigned to one cockpit crew member, who must refrain from performing non-essential duties . PF shall always prioritize tasks as follows:
Aviate
Navigate
Communicate
What is the priority of tasks for the PM?
Monitoring flight progress
Assistance and supervision of PF
Airspace observation
Monitoring aircraft system’s
Operating aircraft systems in accordance with task sharing
R/T communication and correct use of checklist
Keeping the necessary flight records
Setting, identifying and checking navigational aids according to the instructions of PF