General Flashcards
When killing a well using drillers method what should happen to mud pit volume during second circulation
The volume should not change
Most kicks are caused by drill crew not
Ensuring the hole takes the correct fill on trips
Which part of pressure loss acts on bhp
Annular pressure loss
What 2 variables are considered for calculating hydrostatic pressure
Column length and density
It's good practice to keep Trip records Pump output figures Scr Training records All the above
All the above
Scr should be taken every tour using Sidpp on choke manifold Drill pipe gauge on drillers console Gauge on choke manifold Pump gauge Mud loggers
Dp gauge on choke panel
Hydrostatic pressure is the pressure exerted by a column of fluid at rest
True false
True
Which method of well control has only one circulation and pumps kill mud from the start Driller W & w Volumetric Bull heading
w & w
Which method circulates the influx out of the well before kill mud is circulated round the system
Drillers
Which method of well control would you use if you you could not pump and gas migration was suspected
Volumetric
Primary prevention of blow outs is
Correct mud weight
Secondary method of well control is
Closing bop
As gas migrates up the well bore during shut in conditions
Eat pressure will increase
All pressures increase apart from the bubble pressure which will remain the same
I
S
I
If proper dp pressure is not maintained during a kill operation then Bhp will crease or decrease causing losses or another influx
True false
True
The u tube is balanced when the well is shut in regardless of the difference between sidpp and sicp
True
A large pit gain will give higher sidpp & sicp
The bigger the pit gain the higher the sicp
Sidpp is not effected
A long volume of kick will result in a higher or lower annulus pressure
Higher
Why is the sicp higher than the sidpp
Influx is less dense there fore the pressure is higher
After circulating out the influx using the drillers method should the sidpp and sicp bet he same
Yes
If the pump was brought up to kill speed and the casing pressure was allowed to increase above sicp
What would happen
Bhp would increase
Sicp should be kept constant whilst bring the pumps up to speed
A larger pit gain will give higher SIDPP & SICP.
False
When killing a well using the Drillers Method what should happen to the mud pit
The volume will not change
A larger pit gain will give higher SIDPP & SICP.
False
Circulating pressure of several thousand psi at the pump leaves the circulating system i.e. at the shakers, with little or no pressure. Which part of the pressure lost acts on the bottom of the hole?
Annular pressure loss
When killing a well using the Drillers Method what should happen to the mud pit volume during the second circulation?
The volume will not change
Which of the following is the first reliable indication that the well is kicking?
Increase in flow rate
If the mud volume displaced is not equal to pipe displacement, what should you do prior to flow checking the well?
Stop tripping & install a full opening safety valve
During drilling operations your derrickman informs you of an unusual pit level increase.What is the safest response
Pull up, shut off pumps & check for flow
Which of the following best describes the Hard Shut In?
With the R/C closed; close a BOP; open a side outlet
Which of the following best describes the Soft Shut In?
With the R/C open; open a side outlet; close the BOP; close the R/C
What should the driller do when he experiences a drilling break?
Flow check
The purpose of shutting in a well is to:
Stop further influx coming into the wellbore
AND Allow pressures to be determined
If total losses occurred while drilling with water based mud what would you do?
Stop drilling & fill the hole with water
Which of the following causes of well kicks is totally avoidable and due to lack
Not filling the hole with the right amount of mud