fuvk this shit💔 Flashcards
WHAT SYMBOL IS USED TO
IDENTIFY MANDATORY RELATED MAINTANCE?
#
HOW OFTEN WILL A 6211/001 Q-6R HAVE TO BE ACCOMPLISHED?
ONCE PER QUARTER, OR AS REQUIRED
A CAUTION STATEMENT IS USED ON MRC WHENEVER?
THERE IS DAMAGE TO EQUIPMENT
WHAT ARE THE DUTIES/RESPONSIBILITES OF A SECOND PERSON ON A TAG-OUT?
VERIFY PROPER TAG ATTACHMENT AND POSITIONING OF VLAVE/SWITCH
WHO REVIEWS AND APPROVES VIA SIGNATURE, THE WEEKLY PMS SCHEDULE?
DIVISION OFFICER
HOW IS MAINTENANCE SIGNED FOR IN SKED 3.2 AND WHEN SHOULD YOU SIGN IT OFF?
USE YOUR PIN NUMBER AND SIGN FOR THE MAINTENANCE THE SAME DAY OF ACCOMPLISMENT
WHO HAS OVERALL RESPONSIBILITY FOR ENSURING THE 3-M SYSTEM FUNCTIONS WITHIN THE COMMAND?
CO
WHICH DOCUMENT PROVIDES A LIST OF MIPS ASSIGNED TO A SPECIFIC WORK CENTER?
LOEP
WHO IS THE SHIPS 3-M MANAGER?
XO
CAUTION NOTES ON A MRC ARE ASSOCIATED WITH THAT OF?
EQUIPMENT SAFETY
SYSCOM CONTROL NUMBER “ C2 6GBA N” HAS A PRODUCTION BIRTH DATE OF
DECEMBER 2012
BY INSTRUCTION, DANGER AND CAUTION TAG-OUT AUDITS ARE CONDUCTED HOW OFTEN?
WEEKLY
WHICH TAG-OUT LOG WOULD SUPPLY DCPO USE TO ACCOMPLISH A DC RELATED TAG OUT?
ENGINEERING TAG OUT LOG
IF A QUESTION EXIST REGUARDING A STEP IN A MAINTENANCE REQUIRMENT, THE MAINTENANCE PERSON SHOULD.
IMMEDIATELY CONTACT THE WORK CENTER SUPERVISOR
WHERE DO MAINTENACE PERSONNEL FIND THEIR WEEKLY PMS ASSIGNMENTS?
SKED
WHAT DOES A “C” BESIDE A MIP NUMBER ON THE LOEP MEAN?
A CHANGE TO THE MIP
WHAT IS THE PURPOSE OF THE 3M SYSTEM?
PROVIDE FOR MANAGING MAINTENANCE AND MATERIAL SUPPORT IN A MANNER WHICH WILL ENSURE MAXIMUM EQUIPMENT READINESS
MAINTENACE PERSON SHOULD IMMEDIATELY NOTIFY THE WORK CENTER SUPERVISOR WHEN A MRC IS NOT UNDERSTOOD OR SEEMS INCORRECT?
TRUE
WHAT IS NAVSEAINST 4790.8
WORK CENTER PMS MANUAL
WHO SIGNS A DANGER TAG FIRST?
AUTHORIZING OFFICER
WHATS THE 5100.19?
SAEFTY PRECAUTIONS FORCES AFLOAT
MIP
MAINTENANCE INDEX PAGE
WHEN SHOULD EQUIPMENT BE OPERATED WITH A RED TAG ATTACHED?
NEVER
WHAT DOES 3M STAND FOR?
MAINTENANCE MATERIAL MANAGEMENT
ON THE MIP, MRC A-1 HAS A SYSCOM CONTROL NUMBER OF 18 BYOB Y. WHAT DOES THE “Y” MEAN?
REPAIR PARTS ARE REQUIRED
WHO HAS FINAL AUTHORIZATION ON DANGER/ CAUTION TAGS?
AUTHORIZING OFFICER
FOR A DANGER/ CAUTION TAG, WHEN DOES THE SECOND PERSON CHECK THE TAGS?
AFTER TAG POSTED, SECOND PERSON WILL CONDUCT AN INDEPENDENT CHECK
WHAT IS THE WARNING ON A MRC ASSOCIATED WITH?
PERSONAL SAFETY
SDS
SAFETY DATA SHEET
ON THE MRC, MAN-HOURS REFER TO WHAT?
TOTAL TIME TO CONDUCT CHECK NOT INCLUDING TO ACQUIRE TOOLS, TAG OUT AND TIME NEEDED TO REMOVE AND REPLACE INTERFERENCE
WHAT CONTAINS THE PLANNED MAINTENACE REQUIRMENTS FOR WORK CENTER?
WORK CENTER PMS MANUAL
TORS
TAG OUT RECORD SHEET
DURING TAG-OUT PROCEDURE, PROPER COMPONENT INDENTIFICATION IS NEEDED?
TRUE
ONBOARD SHIP WHO MUST COMPLY WITH ALL SAFETY PRECAUTION/ STANDARDS?
ALL HANDS
HOW LONG CAN EQUIPMENT BE TAGGED OUT FOR PMS?
24 HOURS
WHAT ARE THE TWO TYPES OF MAINTENANCE?
PREVENTIVE AND CORRECTIVE
DETAILS ON HOW TO COMPLETE / SIGN OFF MAINTENACE ?
SKED
WHAT IS A NOTE ON A MRC FOR?
PROCEDURAL ADVISORY
THE PURPOSE OF TAG OUT PROGRAM IS TO PROVIDE PERSONNEL AND SHIP SAFETY AND PREVENT DAMAGE TO EQUIPMENT?
TRUE
WHO CAN AUTHORIZE THE SUBSITUTION OF TOOLS ON A MRC?
WORK CENTER SUPERVISOR
HMUG
HAZMAT MATERIAL USER GUIDE
LOEP
LIST OF EFFECTIVE PAGES
PMS
PREVENTIVE MAINTENANCE SCHEDULE
U
UNSCHEDULED MAINTENANCE
R
SITUATIONAL REQUIREMENT
All pages must be verified before maintenance can be conducted. Order in which pages are verified are:
MRC - MIP - LOEP - CHANGE PAGE
Filler
Filler don’t mind dis 😛
BIGASS X ON SKED?
MEANS COMPLETE
BIGASS CIRCLE ON SKED?
MEANS LOST
BIGASS CIRCLE WITH A CROSS OVER IT?
MEANS NOT APPLICABLE