Flows Flashcards
Walking down the jetbridge
- Wheel Chocks (nose and 1 main) - Check
- Gear doors - check position
- APU area - check clear
Entering Flight Deck
- Gear Pins and Covers - stowed
- Circuit Breaker panels - check
- Rain repellent pressure and quantity - check
- * Logbook - review
- Security check - accomplish

Aircraft Power Up

Aircraft has power

Nav and wing lights on
Exterior Inspection
Back from exterior inspection
ATIS, finish DIFSRIP, crew brief
30 minutes to departure
Get PDC
PDC received and applied
ATIS review
PDC review
Route verification
TPC brief
Completion of TPC Briefing
CA: “Before Start Checklist to the line”
15 prior to departure
Start APU
5-10 prior to departure
Seat belt
Load Closeout
- AS 1002 - flt plan
- N835VA - flt plan
- Amd 0 - flt plan
- Rev 0 - flt plan
- Pax Counts - Jetpack
- ZFW - init B
- ZCG - init B
- FOB - E/WD
- TOW - Release & AeroData
- CG - AeroData
Performance
Load Closeout verification complete
OK to close doors
Doors Closed and Slides Armed
Before Start Flow

Before Start Flow complete
CA: “Before Start Checklist Below the Line”
FO: “Before Start Checklist Complete”
OK to Pushback
Cleared to start engines
Start Engines

Engines Started
After Start Flow

After Start Flow complete
CA: “After Start Checklist”
FO: “After Start Checklist Complete”
CA: “Clear Left”
FO: “Clear Right”
Begin to taxi
Beginning to taxi
CA: “Brake Check”
FO: “Pressure Zero”
Taxiing
Flight Control Check
Flight Control Check complete

Taxi Flow Complete
Mini Brief

Mini Brief complete
CA: “Before Takeoff Checklist to the line”
At least 2 minutes prior to takeoff
FO: “Fight attendants should now be seated for takeoff”
Clearance on to the runway anticipated
Before Takeoff Flow

Before Takeoff flow complete
CA: “Before Takeoff Checklist below the line.”
Aligning on runway
PF - “Heading ___”
PM - “Checked”
If parking brake is set on the runway
CA - taxi and landing lights off
Cleared for takeoff
CA - all lights on
PF: “Flaps 0, After Takeoff Checklist”
CA: Turn the rockstar lights off
Climb through 10,000’
PF: “10,000 feet”
PM: “Checked”
Clear - Rad Nav
Clear - Fix Info
Copy - Sec Flt Pln
Check Guard on 2
Climb through 18,000’
PF: “Pull Standard”
PM: “Pull Standard”
PF: “FL180… now”
PM: “Checked”
Nearing TOD
ATIS
Tophat
Gate
Landing Perf
18,000’ descending
PM: “Flight attendants, please prepare the cabin for arrival”
CA - Wing Lights On
PF: “Push 29.76”
PM: “Push 29.76”
PF: “17,800 now”
PM: “Checked”
Return to Airport Setup
ATIS
Build it
Buttons
Brief It
Activate Approach
Approach Checklist
Altimeter set descending
PF: “Approach Checklist”
Descending through 10,000’
CA: Landing lights on
PF: “Activate the Approach”
PM: “Approach activated”
Cleared the approach
CA: Turn-off lights on
Cleared to Land
CA: Taxi lights on
GS, Final APP, or FAF intercept
PF: “Set Go Around Altitude”
PM: “Go Around Altitude Set, ____ Blue”
PF: “____ Blue”
FAF
PF: “_____ (fix) ____ (feet)”
PM: “Checked”
2000’ on approach
PM- Push Speed, “Gear Down, Flaps 3”
Landing Checklist Complete
“Landing Checklist Complete, Cleared to Land Rwy ____”
or
“Landing Checklist Complete, Landing Clearance to Go”
1000’ on approach
PM: “Stable” or “Trending”
or
“Gear”
or
“Flaps”
PF: command gear or flaps if needed
Clearing the runway
FO: Start Timer
CA: Lights off, disarms spoilers
Spoilers Disarmed
After Landing Flow

Clear of runway and taxi instructions received and understood.
After Landing Checklsit
2 minutes after landing
APU start
Parked and power established
Parking Flow

All slides disarmed
CA: “Parking Checklist”
On the ground >2 hours
CA: “ Securing Checklist”