Flows Flashcards
FLIGHT DECK EQUIPMENT FLOW
7 - 4- 9
If first flight of the day, after a crew change, or prior to an oceanic flight or when the flightdeck has been left unattended and not in view of a pilot crewmember.
- FDML, Forms & Manuals, and Flight Kits- Checked
- CA Life Vest - Checked
- CA EFB (as installed) - On
- Escape Rope - Checked
- Overhead Circuit Breakers (49VU) - Checked
- Escape Rope - Checked
- FO EFB (as installed) - On
- Landing Gear Control Handle - Down
- ECAM - Checked
- Flaps & Spoilers - Checked
- Aircell Handset (as installed) - On
• FO Life Vest - Checked • PBE - Checked • Fire Extinguisher - Checked • Gear Pins - Stowed • Crash Axe - Stowed • Circuit Breakers - Checked • Observers’ Life Vests - Checked • Compartmentalized Areas - Checked ♦ Flightdeck Door - Checked
FLIGHT DECK PREPARATION FLOW
9 - 4 - 8 - 4
If first flight of the day, after a crew change, or prior to an oceanic flight, when maintenance has been performed in the flightdeck, or when the flightdeck has been left unattended and not in view of a pilot crewmember.
- MAINTENANCE Panel - Checked
- Third Occupant ACP - Checked
- Third Occupant RMP - Checked
- FLT CTL Panel - Checked
- CARGO HEAT Panel - Checked
- CARGO SMOKE Panel - Checked
- VENTILATION CTL Panel - Checked
- ENG Panel (Overhead) - Checked
- RAIN RPLNT/WIPER Panel - Checked
- Glareshield, Right Side - Checked
- EFIS Control Panel - Checked
- FCU - Checked
- Center Instrument Panel - Checked
- EIS Switching Panel - Checked
- Thrust Levers - Fwd Idle
- Pitch Trim Wheels - Checked
- ATC / TCAS Control Panel - Checked
- Flood Light - Checked
- ACP - Checked
- RMP - Checked
- MCDU - Set
- Instrument Panel - Checked
- EFB (as installed) - Checked
- Oxygen & Interphone - Checked
- Flight Kit Contents/Dates - Checked
BEFORE START FLOW
4 - 4 - 4
Approximately 15 minutes prior to departure and after ATC Route Clearance Verification completed
- EFIS Control Panel- Set
- FCU - Checked
- TERR ON ND - As required
- ECAM - Checked
- Transponder - Set
- ACP - Set
- RMP - Set
- MCDU - Set
- ND - Checked
- PFD - Checked
- Window - Closed/Locked
- Oxygen - Checked
Departure Briefing - Brief if PF
After the captain calls “Before Start Checklist”
• Accomplish Before Start Checklist
BEFORE PUSHBACK FLOW
After receiving the cabin ready notification and all doors are closed and armed
- N/W STRG DISC Memo - Checked
* Pushback/Start Clearance - Obtain
AFTER START FLOW
1 - 5 - 2
After ground equipment is clear, first officer verbally acknowledges the captain’s wands up signal statement, and engine(s) are stabilized
• ENG MODE Selector - NORM or IGN/START
- Y ELEC PUMP - ON or Off
- GEN 2 - On or OFF
- APU BLEED - ON or Off
- ENG ANTI ICE - ON or Off
- APU MASTER SW - ON or Off
- ECAM - Checked
- Flaps - Set
After the captain calls “Flaps ___, Taxi”
• Flaps - Ensure Commanded Position
FO TAXI FLOW
2 - 6
After departing the gate, final weight and balance received, and both engines running
- Flight Controls - Checked
- AUTOBRK - MAX
- Takeoff Data/Flex - Checked
- Pitch Trim - Set
- Flaps - Set
- Rudder Trim - Reset
- WINDSHEAR/PWS (as installed) - AUTO
- T.O. CONFIG - Checked
After the captain calls “Taxi Checklist”
• Accomplish Taxi Checklist (To the Line)
FO BEFORE TAKING THE RUNWAY FLOW
4
Approximately 1-3 minutes prior to taking the runway.
- Flight Attendants - Notified
- RADAR - WX or OFF
- ENG MODE - NORM or IGN
- TCAS- TA/RA
- Runway & FMS - Check
After the captain calls “Below the Line”
• Accomplish Taxi Checklist (Below the Line)
PM AFTER TAKEOFF FLOW
4
After flap retraction and prior to 10,000 feet MSL
- AIR COND - Checked
- Landing Gear - Checked
- Flaps - Checked
- Cabin Vertical Speed - Checked
Accomplish After Takeoff Checklist silently; verbalize “After Takeoff Checklist Complete”
AFTER LANDING FLOW
6
After the aircraft has cleared the active runway and After the captain calls “Flaps - Up” (or as operationally required)
- TCAS- STBY
- Flaps - UP (or as operationally required)
- ENG MODE - NORM
- SPEED BRAKE - RET & Disarmed
- Radar - OFF
- WINDSHEAR/PWS (as installed) - OFF
- APU (if required) - START
Climbing 10,000 flow
PF
Exterior lights - landing, retract
PED - off
Seatbelts - cycle
SHUTDOWN FLOW
4 - 2
After the aircraft is parked at the gate with parking brake set
- SEAT BELTS SIGNS- OFF
- NO PORTABLE ELEC DEVICE (if installed) - OFF
- ADIRS - Checked
- FDs - Recycle (Off, then On)
After both engines are shut down
• Post Flight Report - Sent
• Jumpseat(s) (if previously occupied) - Stowed and Secured
Respond during Shutdown Checklist “___ Disarmed”
Climbing 10,000 flow
PM
ECAM check - include memos and status
Climbing through transition
PF
Pull STD
Crosscheck
Climbing through transition
PM
Pull STD
Crosscheck
121.5 monitor
Descending through transition/18,000 feet MSL
PF
Baro - push and set
Crosscheck
Call for Descent-Approach checklist