Flood Management Flashcards
1
Q
What are the soft engineering methods?
A
- afforestation in drainage basin
- contour ploughing and strip farming in semi-arid areas (reduce surface runoff)
- floodplain zoning (marked off areas)
- river restoration schemed (back to original state)
- wetland and river bank conservation schemes
- forecasting floods and warnings
2
Q
What are the hard engineering methods?
A
- banks and channel made to carry a higher discharge - raised and straightened
- dams and weirs
- diversion channels
- dredging (deeper channel)
- height of floodplain increased
- retention basins and balancing lakes (water to go during high discharge)