Fire Suppression Emergency Operations Flashcards
The Rit crew should assemble what equipment?
a. TIC
b. SCBA rit pack
c. Search Rope
d. Hand tools, including at least halligan and an ax
e. Portable Hydraulic forcible entry tool
f. Sledge Hammer
g. Stokes Litter
h. Saws
What should the RIT team make sure is readily available and ready for their sole and exclusive use?
a. Positive Pressure Fan or Smoke ejector
b. Hoseline
c. Ground ladders
Minimum size for RIT team?
four firefighters
Mayday Message Procedures
“Mayday” x 3
Company
Rank and Name
In Mayday Situation. After acknowledgement by Incident Commander, the mayday member should provide what information?
Who
What
Where
How do you reset emergency activation button in the Communication Center
Turn off the radio for a few seconds and then turn back on.,
Evacuation Signal?
Three steady, short blast on the air horns 3 times
30 seconds after Evacuation announcement, what should be done?
PAR check
For all structure fires, a minimum of how many fire fighters will be assigned for the initial full alarm assignment
14 fire fighters
Crew sizes shall range from min to max of how many members?
3-8 members
Exceptions for the arriving units and the two in/two out rule
Investigation mode
Minor Fire
Imminent Life Threatening Situation
First arriving officer shall give a brief size up to Fire Dispatch including?
- Construction
- occupancy
- visible smoke and fire conditions
- location of smoke and fire
- establishing command
Where should the first attack line be placed?
Between the fire and the most severe exposure