Which of the following is Not a method of protecting a conductor from corrosion: Heat shrink tubing, liquid tape, flux, or electrical tape?
Flux.
There is a discussion between two technicians about wiring harness and terminal repairs. Technician A thinks that rosin paste and rosin core solder would work best for electrical repairs. Technician B thinks that when a conductor needs to be replaced, it should never be replaced with a smaller gauge wire. Who is right?
They are both correct because they studied hard and know their shit.
All wiring harness connectors have:
Locking mechanisms, mating guides, and removable pins and sockets.
The purpose of a … is to pass electrical current from one set of wires to another.
Conductor connector.
… must carry the large current flows required to start a high compression diesel engine.
Cranking circuits.
… on heavy equipment is used to transfer visual, audio or digital information.
Communication wiring.
To open a wiring harness that is taped, a … can be used without damaging the conductor.
Seam ripper.
Always install hold-down brackets, clamps and wire ties to prevent wiring harness vibration or movement that could cause … ?
Chafing.
If conductor wires are not damaged, but the conductor insulation is damaged, it can be repaired by using … ?
Heat shrink tubing.
An approved method of repairing copper conductors is … ?
Crimp slicing.
All electrical schematics are drawn in a … condition.
De-energized.
The components of an electrical switch that conducts the electrical current are called …. ?
Contacts.
In a trailer clearance light circuit, the non-cycling circuit breaker keeps overheating and has to be manually reset. Technician A says that installing a cycling circuit breaker with higher amperage than specification will correct the problem. Technician B says installing a higher amperage cycling circuit breaker may cause damage to the wiring harness and components. Who is right?
Okay, I’m not even learning about any of this, I’m just the person who is typing and I already knew that the answer was Technician B.
A new set of conductors must be connected to screw-secured trailer plug terminals. Technician A says that the conductor wire ends must be tinned with solder before they are inserted. Technician B says that before the plug is put into service, the conductor wires and screw-secured-connectors should be covered with dielectric grease to prevent corrosion. Who is right?
Both Technician A and Technician B.
When a fuse in an electrical lighting circuit overheats and burns out quickly, the probable cause is:
A ground fault.