Exterior Finishes Part A, B Flashcards

1
Q

What main characteristics of vinyl and aluminum siding must you be aware of during installation?

A

Vinyl and aluminum siding are very sensitive to temperature changes and must be allowed to expand and contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What must be done to horizontal joints in panel siding?

A

Horizontal joints must be lapped or have flashing installed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How many coats are applied for cement stucco wall?

A

3 coats

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where is flashing used?

A

Flashing is used at all horizontal joints of exterior components, except where the upper surface overlaps the lower

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When is flashing installed?

A

Flashing is installed first so the building paper or house wrap that is installed over it will carry water onto the flashing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Why is soffit vented?

A

To allow air flow into the roof space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How high should exterior finishes be kept above finished grade?

A

200mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How much space should be allowed for when cutting vinyl or aluminum siding panels that will meet windows, doors and corner post?

A

6mm (1/4”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are siding nails made of?

A

Aluminum, galvanised steel or stainless steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How long should the nails be that are used for fastening vinyl siding to sheathing?

A

Long enough to penetrate the sheathing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When is undersill trim used?

A

Anytime the top or bottom locking strip has been removed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Where is the most common place to start installation of vertical siding?

A

Center of the wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What must be done at joints between aluminum siding and brick?

A

Must be separated by a dividing material or by a space and caulking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What must be done to the footings if masonry veneer is applied to the walls above the footings?

A

Must be increased by 65mm (2 1/2”) for each storey

How well did you know this?
1
Not at all
2
3
4
5
Perfectly