Exercise 4.2. Flashcards

1
Q

(4.2.) Value engineering

A

Reducing the use of spare parts, using a single manufacturing technique for each piece, apply topology optimization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

(4.2.) Value engineering -> Reducing the use of spare parts

A

It reduces the manufacturing costs by reducing the numbers of components to be produced or acquired. Also eases the assembly process for the customer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

(4.2.) Value engineering -> Using a single manufacturing technique for each component

A

By avoiding mixing manufacturing techniques for the same piece, for example folding and milling the same piece, since this increases the price

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

(4.2.) Value engineering -> Apply topology optimization

A

Applying topology optimization techniques allows to reduce the material used in a piece so that either the costs in materials are reduced or the motor that will be used to elevate the board could be downsized.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly