Exam 6 prep Flashcards
Seismic, in plant, service gases, AFW, MT/MSR, ED, MFW/FPT
How many communications systems are required for FD to CR communication?
2.
- Plant two-way radio system, which establishes communication between the fixed and portable radios carried by plant personnel and fire department members outside the control room
Sound powered phones
What will happen if the MX system is lost to the CT fan controls?
- MX system (NH/NG) is lost the Cooling Tower Fans will have to be operated manually at the breakers
Define a safe shutdown earthquake.
- Maximum earthquake potential considering the regional and local geology and seismology
- 0.20g! or 6.0 Richters (.25g design basis)
Define Operating basis Earthquake.
-
Operating Basis Earthquake
- Vibratory ground motion for which those features of the nuclear power plant necessary for continued operation without undue risk to the health and safety of the public will remain functional
- 0.10g! (.13g OBE design basis)
- Shutdown to Mode 3
What provides DC power to the seismic recorder during a loss of local AC power and for how long?
- Internal battery provides DC power to the recorder during a loss of local AC power for up to 30 hours.
What is the function of the STA with regards to seismic concerns?
-
STA determines:
- OBE (Operating Basis Earthquake) exceedance threshold 0.10g means that the Unit is in an Unusual Event Notification
- OBE w/ Safety systems being effecting (structures or equipment) ALERT classification.
How soon must the following be completed:
- EAL classifications when indications of an EAL are met or exceeded.
- Civil Engineering analysis of effects on facility features.
15 minutes from the first indication.
7 days.
How is a seismic alarm validated for false or real conditions?
An alarm without ground motion felt in the CR is considered a false alarm. This is validated by observing for waves in the FP.
State the requirements found in TLCO 3.3.103
- 3.3.103 Requires all 6 accelerometers and all 6 digital recorders (at all times)
- Seismic event > 0.02g – channel calibration within 5 days
What will cause the seismic digital recorders to begin recording?
Any accelerometer of the 6 forced balanced accelerometers will start all digital recorders.
State the power supplies and what signals will close GAA-UV-1/2.
- GAA-UV-1/2 are PKA powered CIAS valves and fail closed on loss of power
State the high and low pressure N2 header operating pressures and how each are maintained.
- Low pressure header is maintained @ 115 psig using pressure control valves from Liquid Nitrogen Tank. Secondary valve opens during high demand
- High pressure header maintained @ 650 psig
- High alarm: 690 psig
- Backup pressure control valve opens: 630 psig
State the HP nitrogen pumps operating characteristics.
How long is the cooldown cycle?
What will block pump start?
- High pressure liquid nitrogen pumps (positive displacement) starts when active bank @ 1400 psig and stops @ 2100 psig
-
Start cycle:
- 15 min cooldown prior to start (nitrogen flows around the pump)
-
Pump will not start:
- 2400 psig discharge pressure
- 25” in the Nitrogen Storage Tank
- HP Vaporizer temp is -20F and lowering
State the HP N2 loads.
- Downcomer control and isolation valves
- ADVs
- SITs
What is a level 1 evaluation and when is it required to be performed?
Determination of whether an OBE or SSE has occurred and it must be done by the STA within 1 hr.
What is a level 2 evaluation, who performs it and how long do they have to complete it?
Determination of whether an SSE has occurred, done by Civil Engineering and must be completed within 7 days.
What action is required if an OBE has occurred?
What action is required if the seismic event is between 0.01g and OBE?
All units must be shutdown to M.3 and a plant cooldown is required to inspect the SG’s.
System and site walkdowns must be performed on SFP, AFW pumps and piping, RCS leakage evaluated,
State the design basis of the AFW system.
- Provides the same design as CST 8 hrs HTBY then C/D @ 75f/hr to RCS @ 350F
What cools the AFW room coolers and how are they operated?
- Cooled by EC start upon pump start and run for 5 min after pump shutdown
- FOR AFA THIS MEANS WHEN 138 OR 134 go open.
- Sized to maintain room temp < 104F
What is the limit placed on the AFN use
- AFN should not be used when < 27% NR level UNLESS a minimum of 250 GPM per S/G to minimize water hammer due to steam voiding in the downcomer piping. This flowrate will quickly collapse the void and minimize water hammer effects
What range of operation is the AF system set to maintain?
- AF valves cycle FULL OPEN to FULL CLOSED between 25.8% WR – 40.3% WR
What is the D/P lockout associated with the AFAS signals, and which SG is essentially isolated from feed?
- @ 185 psid (D/P lockout) between SG-1 & SG-2 AFAS will not FEED the S/G with the lower pressure.
- If D/P lockout occurs before AFAS initiation, AFAS will not initiate for S/G with lower pressure.
What is DAFAS and what setpoints actuate it?
DAFAS or Diverse Automatic Feedwater Actuation System is an independent and redundant backup to the AFAS signals designed to start AFW to any intact SG not receiving feed.
- SPS actuated (2409#)
- S/G level of 20.3% WR on 2 of 4 class level instruments
- NO AFAS
- NO MSIS
State what will start the class AFW pumps.
- Both CLASS pumps start on AFAS-1 or AFAS-2
-
“B” AFP
- SIAS
- LOP
- CSAS