EOOW Flashcards

1
Q

What tags require CO signature?

A
Firemain
Installed FF equipment
IDLH
Single valve to sea
Major equipment
Fluids with flashpoint  1000PSI
Systems with temps > 200F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does PHEL stand for?

A

Physiological Heat Exertion Limit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which PHEL curve does engineering use?

A

PHEL II - Basic Engineering

PHEL III - EOCC/SOUND AND SECURITY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When are heat stress surveys required?

A
PHEL I-III Watch  100F
PHEL I-III Watch > 4 hrs/temp > 90F
PHEL IV-V temp > 85F
Before BECCES > 3hrs
If heat injury occurs
When ordered by CO
If dry bulb temp increases 5F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

List the symptoms of heat exhaustion.

A
Heavy sweating
Paleness
Muscle cramps
Tiredness
Weakness
Dizziness
Headache
Nausea
Vomiting
Fainting
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

List the symptoms of heat stroke.

A
High body temp
No sweating
Rapid pulse
Difficulty breathing
Strange behavior
Hallucinations
Confusion
Agitation
Disorientation
Seizure
Coma
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the levels for single and double hearing protection?

A

Single- 84db. Impact- 140.

Double- 104db

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When is CO permission required for energized work?

A

Voltage > 30v

Damaged equipment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is required to perform energized work?

A
CPR qualified observer
Rope off area
Rubber matting
Face shield
Gloves with leather shell
Arc/Flash coveralls 300-1000v
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How long are engineering logs maintained on ship?

A

3 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How long is the bell log maintained in ship?

A

3 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How long are operating logs maintained on ship.

A

6 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What instructions govern pollution control?

A

OPNAVNST 5090.1C and NSTM 593

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the oily waste discharge regulations?

A

15ppm discharge anywhere

100ppm if >12 nm from land

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are dumping standards at sea?

A
Grey water- anywhere
Black water/sewage- 3nm from land
Oily waste- 12nm from land
Glass/metal- 12nm from land
Hazmat- 50nm
Plastic/medical- never
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the ratings for FOSP?

A

36gpm slow
72gpm fast
105psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

FOSP relief valve lifts at what pressure?

A

130psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Describe fuel pump logics.

A

Below 20psi for 5 seconds pump cycles to high.

Stays below for an additional 2 seconds pump cycles off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is the range of the fuel oil heater?

A

85-90F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Fuel oil heater relief valve lifts at what pressure?

A

120psi.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What is the fuel temp high alarm?

A

130F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the flash point for F-76.

A

140F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Fuel unloader valve maintains what pressure?

A

35psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Fuel pressure low level alarm is what?

A

32psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Loss of LP air to fuel valves causes what?
Valve will fail closed
26
Unloader is located where?
After heater but before filters/coalescer.
27
What is the DP alarm for the pre-filter.
18psi
28
How many elements are in the pre-filter.
4
29
How many elements are in the coalescer?
7/11
30
What is the high DP for coalescer?
15psi
31
How long will head tanks last running GTM?
5 mins/ GTM
32
How long will head tank last running a GTG?
4 hours approx
33
Excess fuel recirculates to where?
FOST
34
What is the max fuel we can hold?
461,665 gallons
35
What is the NSTM for F-76?
541
36
What is the NSTM for JP-5?
542
37
How long is the PPS sample good for?
8 hours
38
What is the capacity of MER1 L/O sump? Low alarm? Normal level?
2486 gallons Low 1400 gal Normal 1750 gal
39
What is the capacity of MER2 L/O sump? Low alarm? Normal level?
2287 gallons Low 1381 gal Normal 1726 gal
40
What are the ratings for the L/O attached pump?
693 gal @75psi @168 srpm Pump is always on. Relief valve at 125psi discharge side.
41
What are the ratings of the L/O electric pumps?
318 gpm slow 560 gpm fast 105psi
42
List the L/O pump logics.
``` High pressure alarm-18psi Normal-14.5psi Lead pump in low-13psi Lead pump in fast-11.5psi Stby pump in fast-10psi Low alarm-8psi ```
43
Describe the lube oil unloader valve.
"CLA-VAL" is spring loaded and hydraulically operated (no LP air). Fails closed for max lube oil flow
44
What is the max DP for the lube oil filter?
12psi
45
What does LOSCA stand for?
Lube Oil Storage and Cooling Assembly
46
LOSCA uses what two oils?
2190 to cool 23699
47
What is the flash point of 2190?
450 F
48
What is the rate of the lube oilers purifier?
500 gallons per hour.
49
What samples are taken while transferring fuel from storage to service?
PPS- prior to placing online for oncoming service tank Visual inspection on discharge side of purifier 5 min AOL Every 30 mins
50
When is fuel tested during refuel?
Beginning Midpoint End Visual every 15 mins
51
What fuel tests are required for DOD approved fuel?
Ship does clear and bright Flashpoint >140F BSW
52
What tests are conducted for non-DOD fuel?
C/B BSW API specific gravity
53
How is the BS&W conducted?
Shake for 30 seconds Pour 100 ml into two tubes Whirl at 1500rpm for 15 mins Take average of two readings
54
What are BS&W requirements for JP-5?
55
What are BS&W requirements for F-76?
56
What does CCFD stand for?
Combined Free Water Detector and Contaminated Fuel Detector
57
What is the size of the sample for CCFD?
200ml
58
MGGS- What is required if GG speed is greater than 7500rpm?
Cannot be operated until cause determined and repairs completed.
59
What is required if stall is less 7500rpm?
Engine can be operated at 5% power below occurrence.
60
MLFOP- LOSS OF FUEL PRESSURE
Stop pump Shut tank valves NSCD engine Thrust control +4 @ CCS
61
MMFOL- Major FO leak
E-Stop Stop pump Shut tank valves Thrust control +4 @CCS
62
MHBRG- Hot bearing MRG.
LO outlet temp > 185F or 55F diff from cooler outlet = Immediate actions.
63
MNVRG - Unusual noise or vibration in MRG. (non-metallic)
Slow shaft until noise stops and note RPM.
64
Describe dissolved water in a lube oil sample.
No present haziness or cloudiness.
65
Describe emulsified water in a lube oil sample.
Oil can no longer dissolve water, additional water causes haziness or cloudiness.
66
What does engineering standing order 1 cover?
Plant operations
67
What does engineering standing order 2 cover?
EOOW relationship with OOD/TAO/CSOOW
68
What requires OOD permission while underway?
Start/stop GTM Pump bilges Placed vital machinery OOC for maint Transfer fuel
69
What does engineering standing order 3 cover?
Required reports for CHENG
70
What reports are required for CHENG?
``` Casualties Water below 65% If JP5 will be used for engines Before placing equipment OOC Emergency bells If RMD/MER is set ```
71
What requires CHENG approval
``` Deviation from night orders Placing equipment OOC Tag DC equipment Opening tanks and voids Single Valve Tags Use of educators FOST below 50% In-port fuel transfer ```
72
What does engineering standing order 4 cover?
RMD/MER
73
What does engineering standing order 5 cover?
Night orders
74
What does engineering standing order 6 cover?
Engineering department security.
75
What does engineering standing order 7 cover?
Engineering logs and records.
76
What does engineering standing order 8 cover?
NETS/COMS
77
What does engineering standing order 9 cover?
Casualty procedures
78
What does engineering standing order 10 cover?
Restoration from multiple casualties.
79
What does engineering standing order 11 cover?
Single valve protection.
80
What does engineering standing order 12 cover?
Watch routines
81
What does engineering standing order 13 cover?
General engineering info.
82
What is the order of casualty restoration.
``` Electric power to SWBD Firemain SWSP CW A/C Lube oil service LP Air FO service Propulsion Steering Refrigeration VCHT ```
83
Halon flooding covers what spaces?
``` MER1 MER2 AUX1 3 GEN TACTAS paint locker Hazmat ```
84
Hand wheel colors are what NSTM
NSTM 505
85
When are tag audits completed?
Bi-weekly unless in the yards or reactor department then weekly. GONZALEZ audits weekly.