EOOW Flashcards
What tags require CO signature?
Firemain Installed FF equipment IDLH Single valve to sea Major equipment Fluids with flashpoint 1000PSI Systems with temps > 200F
What does PHEL stand for?
Physiological Heat Exertion Limit
Which PHEL curve does engineering use?
PHEL II - Basic Engineering
PHEL III - EOCC/SOUND AND SECURITY
When are heat stress surveys required?
PHEL I-III Watch 100F PHEL I-III Watch > 4 hrs/temp > 90F PHEL IV-V temp > 85F Before BECCES > 3hrs If heat injury occurs When ordered by CO If dry bulb temp increases 5F
List the symptoms of heat exhaustion.
Heavy sweating Paleness Muscle cramps Tiredness Weakness Dizziness Headache Nausea Vomiting Fainting
List the symptoms of heat stroke.
High body temp No sweating Rapid pulse Difficulty breathing Strange behavior Hallucinations Confusion Agitation Disorientation Seizure Coma
What are the levels for single and double hearing protection?
Single- 84db. Impact- 140.
Double- 104db
When is CO permission required for energized work?
Voltage > 30v
Damaged equipment.
What is required to perform energized work?
CPR qualified observer Rope off area Rubber matting Face shield Gloves with leather shell Arc/Flash coveralls 300-1000v
How long are engineering logs maintained on ship?
3 years
How long is the bell log maintained in ship?
3 years
How long are operating logs maintained on ship.
6 months
What instructions govern pollution control?
OPNAVNST 5090.1C and NSTM 593
What are the oily waste discharge regulations?
15ppm discharge anywhere
100ppm if >12 nm from land
What are dumping standards at sea?
Grey water- anywhere Black water/sewage- 3nm from land Oily waste- 12nm from land Glass/metal- 12nm from land Hazmat- 50nm Plastic/medical- never
What are the ratings for FOSP?
36gpm slow
72gpm fast
105psi
FOSP relief valve lifts at what pressure?
130psi
Describe fuel pump logics.
Below 20psi for 5 seconds pump cycles to high.
Stays below for an additional 2 seconds pump cycles off.
What is the range of the fuel oil heater?
85-90F
Fuel oil heater relief valve lifts at what pressure?
120psi.
What is the fuel temp high alarm?
130F
What is the flash point for F-76.
140F
Fuel unloader valve maintains what pressure?
35psi
Fuel pressure low level alarm is what?
32psi
Loss of LP air to fuel valves causes what?
Valve will fail closed
Unloader is located where?
After heater but before filters/coalescer.
What is the DP alarm for the pre-filter.
18psi
How many elements are in the pre-filter.
4
How many elements are in the coalescer?
7/11
What is the high DP for coalescer?
15psi
How long will head tanks last running GTM?
5 mins/ GTM
How long will head tank last running a GTG?
4 hours approx
Excess fuel recirculates to where?
FOST
What is the max fuel we can hold?
461,665 gallons
What is the NSTM for F-76?
541
What is the NSTM for JP-5?
542
How long is the PPS sample good for?
8 hours
What is the capacity of MER1 L/O sump? Low alarm? Normal level?
2486 gallons
Low 1400 gal
Normal 1750 gal
What is the capacity of MER2 L/O sump? Low alarm? Normal level?
2287 gallons
Low 1381 gal
Normal 1726 gal
What are the ratings for the L/O attached pump?
693 gal @75psi @168 srpm
Pump is always on.
Relief valve at 125psi discharge side.
What are the ratings of the L/O electric pumps?
318 gpm slow
560 gpm fast
105psi
List the L/O pump logics.
High pressure alarm-18psi Normal-14.5psi Lead pump in low-13psi Lead pump in fast-11.5psi Stby pump in fast-10psi Low alarm-8psi
Describe the lube oil unloader valve.
“CLA-VAL” is spring loaded and hydraulically operated (no LP air).
Fails closed for max lube oil flow
What is the max DP for the lube oil filter?
12psi
What does LOSCA stand for?
Lube Oil Storage and Cooling Assembly
LOSCA uses what two oils?
2190 to cool 23699
What is the flash point of 2190?
450 F
What is the rate of the lube oilers purifier?
500 gallons per hour.
What samples are taken while transferring fuel from storage to service?
PPS- prior to placing online for oncoming service tank
Visual inspection on discharge side of purifier
5 min AOL
Every 30 mins
When is fuel tested during refuel?
Beginning
Midpoint
End
Visual every 15 mins
What fuel tests are required for DOD approved fuel?
Ship does clear and bright
Flashpoint >140F
BSW
What tests are conducted for non-DOD fuel?
C/B
BSW
API specific gravity
How is the BS&W conducted?
Shake for 30 seconds
Pour 100 ml into two tubes
Whirl at 1500rpm for 15 mins
Take average of two readings
What are BS&W requirements for JP-5?
What are BS&W requirements for F-76?
What does CCFD stand for?
Combined Free Water Detector and Contaminated Fuel Detector
What is the size of the sample for CCFD?
200ml
MGGS- What is required if GG speed is greater than 7500rpm?
Cannot be operated until cause determined and repairs completed.
What is required if stall is less 7500rpm?
Engine can be operated at 5% power below occurrence.
MLFOP- LOSS OF FUEL PRESSURE
Stop pump
Shut tank valves
NSCD engine
Thrust control +4 @ CCS
MMFOL- Major FO leak
E-Stop
Stop pump
Shut tank valves
Thrust control +4 @CCS
MHBRG- Hot bearing MRG.
LO outlet temp > 185F or 55F diff from cooler outlet = Immediate actions.
MNVRG - Unusual noise or vibration in MRG. (non-metallic)
Slow shaft until noise stops and note RPM.
Describe dissolved water in a lube oil sample.
No present haziness or cloudiness.
Describe emulsified water in a lube oil sample.
Oil can no longer dissolve water, additional water causes haziness or cloudiness.
What does engineering standing order 1 cover?
Plant operations
What does engineering standing order 2 cover?
EOOW relationship with OOD/TAO/CSOOW
What requires OOD permission while underway?
Start/stop GTM
Pump bilges
Placed vital machinery OOC for maint
Transfer fuel
What does engineering standing order 3 cover?
Required reports for CHENG
What reports are required for CHENG?
Casualties Water below 65% If JP5 will be used for engines Before placing equipment OOC Emergency bells If RMD/MER is set
What requires CHENG approval
Deviation from night orders Placing equipment OOC Tag DC equipment Opening tanks and voids Single Valve Tags Use of educators FOST below 50% In-port fuel transfer
What does engineering standing order 4 cover?
RMD/MER
What does engineering standing order 5 cover?
Night orders
What does engineering standing order 6 cover?
Engineering department security.
What does engineering standing order 7 cover?
Engineering logs and records.
What does engineering standing order 8 cover?
NETS/COMS
What does engineering standing order 9 cover?
Casualty procedures
What does engineering standing order 10 cover?
Restoration from multiple casualties.
What does engineering standing order 11 cover?
Single valve protection.
What does engineering standing order 12 cover?
Watch routines
What does engineering standing order 13 cover?
General engineering info.
What is the order of casualty restoration.
Electric power to SWBD Firemain SWSP CW A/C Lube oil service LP Air FO service Propulsion Steering Refrigeration VCHT
Halon flooding covers what spaces?
MER1 MER2 AUX1 3 GEN TACTAS paint locker Hazmat
Hand wheel colors are what NSTM
NSTM 505
When are tag audits completed?
Bi-weekly unless in the yards or reactor department then weekly. GONZALEZ audits weekly.