Engineering Geology Revision Flashcards
What is the purpose of a desk study?
To determine:
Historical development
Constraints on development (engineering and environmental)
Ground Investigation strategy
What are the two key invasive species and associated issues?
Japanese Knotweed and Giant Hogweed
Affect mortgages, damage foundations, spread rapidly, expensive to remove
What data do you gain from the Geology stage of a desk study?
Borehole records
Solid and Superficial Geology
Hydrology and Hydrogeology
Made Ground?
Mining under site?
Flooding?
How do you go about an environmental assessment?
Preliminary Environmental Assessment
- Historical and Present Land uses
Potential Contaminants of Concern
- Metals, HCs, Solvents, Pesticides, Asbestos
Pollutant Linkage Conceptual Model
- Source, Pathway, Receptors
What Acts are Referenceable for Environmental Assessments?
Environmental Protection Act 1990
Section 57 Environmental Act 1995
What is included in an Environmental Qualitative Risk Assessment?
Likelihood of occurrence
Severity of consequences
Investigation required?
Give examples of Receptors
Humans (residents and workers) and animals
Plants
Buildings, property, and services
Controlled waters (surface and groundwaters)
How can humans act as a Pathway?
Inhalation of dust
Ingestion of dust/soil by hand or from vegetation
Dermal contact with soil/water
How can plants act as a Pathway?
Direct contact with soil/groundwater
Uptake of contaminants
How can buildings act as a Pathway?
Direct contact with soil/groundwater
Service trenches act as a migration pathway
How can controlled waters act as a Pathway?
Runn-off enters water courses
Contaminants from soil leaching into groundwater
Movement of dissolved contaminants in soil pore water
Movement of contaminants via ground to surface water
How do you approach pollution linkages and risk assessments?
Can the linkages be completed?
How can they be broken?
Likelihood of occurrence
Severity of consequences
Investigation required?
How can linkages be broken?
Clean cover
Excavation of contamination hotspots
What are the Geotechnical constraints of Made Ground?
Variable engineering properties
Uncompacted
Large obstructions
Differential settlement
Name two geotechnical solutions to Made Ground
Pile foundations
Vibro-compaction