Engineering Economics Concept 3 Flashcards

1
Q

Future amount or worth

A

F or FW - Amount at some future date considering time value of money (1.7).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Geometric gradient series

A

A series of cash flows in which each consecutive cash flow is larger or smaller than the previous by a percentage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Gradient, arithmetic

A

G - Uniform change (+ or -) in cash flow each time period (2.5, 3.3–4).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Gradient, geometric

A

g - Constant rate of change (+ or -) each time period (2.6).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Gross income

A

GI - Income from all sources for corporations or individuals (17.1).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Inflation

A

An increase in the price level of goods and services in an economy over time. Negative inflation (i.e. decrease in the price level over time) is called deflation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Inflation rate

A

f - Rate that reflects changes in the value of a currency over time (14.1).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Interest

A

the cost of borrowing money. It is the amount of money that is paid in addition to the amount borrowed, loaned or invested.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Interest rate

A

i or r - Interest expressed as a percentage of the original amount per time period; nominal (r) and effective (i) rates (1.4, 4.1).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Linear gradient series

A

A series of cash flows in which each consecutive cash flow is larger or smaller than the previous by a constant dollar amount.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Life (estimated)

A

n - Number of years or periods over which an alternative or asset will be used; the evaluation time (1.7).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Life-cycle cost

A

LCC - Evaluation of costs for a system over all stages: feasibility to design to phaseout (5.7).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly